2023-04-05 16:26:46 | COMMUNITY CENTER |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - |
| |
| 1) PLEASE SHOW THE AREA INCREASE CALCULATIONS - FBC |
| 506.2.1 - DRAWING LS1.1.0 - BUILDING CODE ANALYSIS - |
| FOR A NON SEPARATED OCCUPANCY THE ALLOWABLE AREA FOR AN |
| OCCUPANCY A3 OR 4 IS (24000) - FBC 508.3.2 ALLOWABLE |
| BUILDING AREA AND HEIGHT. THE ALLOWABLE BUILDING AREA |
| AND HEIGHT OF THE BUILDING OR PORTION THEREOF SHALL BE |
| BASED ON THE MOST RESTRICTIVE ALLOWANCES FOR THE |
| OCCUPANCY GROUPS UNDER CONSIDERATION FOR THE TYPE OF |
| CONSTRUCTION OF THE BUILDING IN ACCORDANCE WITH SECTION |
| 503.1. |
| |
| 2) DRAWING LS1.1.0 - BUILDING CODE ANALYSIS - THE |
| DRAWINGS SHOW A GYMNASIUM WITH SPECTATOR SEATING - |
| SHOULD BE AN OCCUPANCY CLASSIFICATION A4 |
| |
| 3) IF CHANGING THE BUILDING CONSTRUCTION TYPE - THE |
| BUILDING SET BACKS FROM THE EXISTING BUILDING SHOWN ON |
| DRAWING SP-1 WILL NEED TO BE EVALUATED FOR FIRE RATINGS |
| - FBC CHAPTER 6 |
| |
| 4) "GUIDELINES AND POLICIES FOR PROJECTS CONCERNING |
| THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS" |
| THE FORM ON PAGE 6 FOR THE THRESHOLD INSPECTOR NEEDS TO |
| BE FILLED OUT - THE FORM ON PAGE 8 NEEDS TO BE FILLED |
| OUT FOR THE CONTRACTOR. |
| |
| 5) THE STRUCTURAL DRAWINGS DO NOT SHOW AS DIGITALLY |
| SIGNED IN ADOBE READER - SIGNED AND SEALED DRAWINGS IN |
| PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED |
| TO BE USED IN ELECTRONIC PLAN REVIEW. (A |
| CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED |
| A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF |
| E-SIGNATURE). |
| |
| |
| |
| |