2023-03-06 11:06:15TO ANSWER YOUR QUESTION:
  
 [A] 102.1 GENERAL. WHERE THERE IS A CONFLICT BETWEEN A
 GENERAL
 REQUIREMENT AND A SPECIFIC REQUIREMENT, THE SPECIFIC
 REQUIREMENT SHALL BE APPLICABLE. WHERE, IN ANY SPECIFIC
 CASE,
 DIFFERENT SECTIONS OF THIS CODE SPECIFY DIFFERENT
 MATERIALS,
 METHODS OF CONSTRUCTION OR OTHER REQUIREMENTS, THE MOST
 RESTRICTIVE SHALL GOVERN.
  
 WHEN THERE ARE TWO MATERIALS BEING USED, THERE ARE TWO
 DIFFERENT TABLES. THE MORE RESTRICTIVE TABLE MUST BE
 USED. YOU CANNOT GET MORE FLOW FROM ONE SECTION OF PIPE
 AND LESS FLOW FROM ANOTHER SECTION OF PIPE AND
 EFFECTIVELY SIZE THE PIPING SYSTEM USING THE LONGEST
 RUN METHOD OR BRANCH METHOD. CSST HAS MORE FRICTION AND
 LOSS THAN METALLIC PIPE. USING THE SAME PRESSURRES AND
 PIPE SIZES SHOWS THAT CSST HAS LESS OUTPUT THAN
 METALLIC PIPE. YOU MUST USE THE MORE RESTRICTIVE TABLE.
  
 IT CONTINUES IN THE APPENDIX THAT EXPLAINS PIPE SIZING
 AND DESCRIBES ONLY USING "ONE LINE FROM ONE SIZING
 TABLE" FOR EACH SYSTEM (WHICH IS FROM REGULATOR TO
 REGULATOR).
  
 WITH THAT BEING SAID, USING TABLE 402.4(5), AT 125 FT
 (THE NEXT LINE CONSIDERING THE LONGEST RUN IS 120) THE
 MAXIMUM LOAD ALLOWED FOR 1/2" PIPE IS 414K BTU, AND YOU
 ARE RUNNING 689K BTU. REGARDLESS OF THE ABOVE
 MENTIONED, YOU ARE UNDERSIZED.