2023-02-23 13:01:19 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) THERE IS AN INDICATION OF THE SPEC SHEET FOR THE |
| FLOOR UNDERLAYMENT, BUT NO SPEC SHEET NOR PRODUCT NAME |
| FOR THE ACTUAL PROPOSED LVT FLOORING. |
| |
| VINYL FLOORING IS MANUFACTURED AROUND THE WORLD AND NOT |
| ALL ARE TESTED AND MEETING LISTED AND NFPA STANDARDS. |
| |
| PER NFPA 101, CH 30 |
| |
| 30.3.3.3 INTERIOR FLOOR FINISH. |
| 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN |
| ACCORDANCE WITH |
| SECTION 10.2. |
| |
| 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH |
| 10.2.2.2 |
| ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL |
| HAVE A |
| MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. |
| |
| FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE LVT |
| FLOORING NAME AND THE PRODUCT SPEC SHEETS INDICATING |
| THE FIRE BEHAVIOR RATING. |
| |
| |
| 1A) THERE IS NO FLOOR PLAN SHOWING THE LOCATIONS OF THE |
| PROPOSED LVT INSTALL. |
| |
| PER NFPA 1 |
| |
| 1.7.12.7 PLANS SHALL BE SUBMITTED TO THE AHJ FOR OTHER |
| CONDITIONS AS DEEMED NECESSARY BY THE AHJ TO DETERMINE |
| COMPLIANCE WITH THE APPLICABLE CODES AND STANDARDS. |
| |
| FOR THE RECORD, PLEASE PROVIDE A FLOOR PLAN INDICATING |
| THE LOCATIONS WHERE THE FLOORING WILL BE INSTALLED.. |
| |
| |
| |
| 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |