Date |
Text |
2022-12-08 15:30:51 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) THERE ARE EXITS INDICATED ON THE LIFE SAFETY PLANS, |
| |
| PER NFPA 101, CH 12 NEW ASSEMBLY, 38 NEW BUSINESS, & CH |
| 7 MEANS OF EGRESS. |
| |
| 7.7 DISCHARGE FROM EXITS |
| 7.7.1* EXIT TERMINATION. EXITS SHALL TERMINATE |
| DIRECTLY, AT A PUBLIC |
| WAY OR AT AN EXTERIOR EXIT DISCHARGE, UNLESS OTHERWISE |
| PROVIDED IN 7.7.1.2 |
| THROUGH 7.7.1.4. |
| |
| PLEASE PROVIDE DETAILS IN COMPLIANCE WITH THE REQUIRED |
| CODE. |
| |
| |
| |
| 2) THERE ARE TWO EXIT STAIRS INDICATED FROM THE 2ND |
| FLOOR. |
| |
| PER NFPA 101, CH 12 NEW ASSEMBLY, 38 NEW BUSINESS, & CH |
| 7 MEANS OF EGRESS. |
| |
| 12.2.2.3 STAIRS. |
| 12.2.2.3.1 GENERAL. STAIRS COMPLYING WITH 7.2.2 SHALL |
| BE PERMITTED, |
| UNLESS ONE OF THE FOLLOWING CRITERIA APPLIES: |
| ( EXCEPTIONS NOT APPLICABLE) |
| |
| 38.2.2.3 STAIRS. |
| 38.2.2.3.1 STAIRS COMPLYING WITH 7.2.2 SHALL BE |
| PERMITTED |
| |
| PLEASE PROVIDE STAIR DETAILS IN COMPLIANCE WITH THE |
| REQUIREMENTS. |
| |
| |
| |
| 3) THERE ARE INDICATIONS OF AN ELEVATOR; HOWEVER, THERE |
| IS NO INDICATION OF AREA OF REFUGE FOR ACCESSIBILTIY. |
| |
| PER NFPA 101, CH 12 NEW ASSEMBLY, 38 NEW BUSINESS, & CH |
| 7 MEANS OF EGRESS. |
| |
| 12.2.2.12 AREAS OF REFUGE. AREAS OF REFUGE COMPLYING |
| WITH 7.2.12 |
| SHALL BE PERMITTED |
| |
| 38.2.2.12 AREAS OF REFUGE. |
| 38.2.2.12.1 AREAS OF REFUGE COMPLYING WITH 7.2.12 SHALL |
| BE |
| PERMITTED. |
| |
| PLEASE PROVIDE AREA OF REFUGE DETAILS IN COMPLIANCE |
| WITH THE REQUIREMENTS. |
| |
| |
| 4) SHEET A601 - THERE ARE INDICATIONS OF MAGNETIC LOCKS |
| & CARD READERS ON THE DOOR SCHEDULE. |
| |
| THE INSTALLATION OF CARD READERS/ACCESS CONTROL SHALL |
| BE INSTALLED UNDER SEPARATE PERMIT & SHOP DRAWING |
| IN COMPLIANCE WITH NFPA 101, MEANS OF EGRESS. |
| |
| PLEASE REVIEW AND PROVIDE A NOTE OF ACKNOWLEDGEMENT ON |
| THE PLAN SHEET. |
| |
| |
| 5) SHEET T100 - THERE ARE INDICATIONS OF SEPARATE FIRE |
| SPRINKLER SHOP DRAWING SUBMITTAL. |
| |
| IS THERE AN EXISTING FIRE SPRINKLER SYSTEM OR IS IT A |
| NEW SYSTEM? |
| |
| PER F.A.C. |
| |
| 61G15-30.003 MINIMUM REQUIREMENTS FOR ENGINEERING |
| DOCUMENTS. |
| (1) ENGINEERING DOCUMENTS ARE PREPARED IN THE COURSE OF |
| PERFORMING ENGINEERING SERVICES. WHEN PREPARED FOR |
| INCLUSION WITH AN APPLICATION FOR A GENERAL BUILDING |
| PERMIT, THE DOCUMENTS SHALL MEET ALL ENGINEER???S |
| RESPONSIBILITY RULES, SET FORTH IN CHAPTERS 61G15-31, |
| 61G15-32, 61G15-33, AND 61G15-34, F.A.C., AND BE OF |
| SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND |
| EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT |
| WILL CONFORM TO THE PROVISIONS OF THE FLORIDA BUILDING |
| CODE, ADOPTED IN SECTION 553.73, F.S., AND APPLICABLE |
| LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED |
| BY THE AHJ. THE DOCUMENTS SHALL INCLUDE: |
| (A) INFORMATION THAT PROVIDES MATERIAL SPECIFICATIONS |
| REQUIRED FOR THE SAFE OPERATION OF THE SYSTEM THAT IS A |
| RESULT OF ENGINEERING CALCULATIONS, KNOWLEDGE AND |
| EXPERIENCE. |
| (B) LIST FEDERAL, STATE, MUNICIPAL, AND COUNTY |
| STANDARDS, CODES, ORDINANCES, LAWS, AND RULES, WITH |
| THEIR EFFECTIVE DATES, THAT THE ENGINEERING DOCUMENTS |
| ARE INTENDED TO CONFORM TO. |
| (C) INFORMATION, AS DETERMINED BY THE ENGINEER OF |
| RECORD, NEEDED FOR THE SAFE AND EFFICIENT OPERATION OF |
| THE SYSTEM. |
| (D) LIST ENGINEERING DESIGN CRITERIA; REFERENCE PROJECT |
| SPECIFIC STUDIES, REPORTS, AND DELEGATED ENGINEERING |
| DOCUMENTS. |
| (E) IDENTIFY CLEARLY ELEMENTS OF THE DESIGN THAT VARY |
| FROM THE GOVERNING STANDARDS AND DEPICT/IDENTIFY THE |
| ALTERNATE METHOD USED TO ENSURE COMPLIANCE WITH THE |
| STATED PURPOSE OF THESE RESPONSIBILITY RULES. |
| (2) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME AND |
| BUSINESS ADDRESS, ON ENGINEERING DOCUMENTS. ENGINEERING |
| DOCUMENTS WHICH ARE ISSUED FOR PRELIMINARY OR |
| CONCEPTUAL USE, SHALL CLEARLY NOTE THE INTENDED PURPOSE |
| OF SUCH DOCUMENTS. |
| (3) WHEN ELEMENTS OF THE PROJECT ARE SHOWN ON AN |
| ENGINEERING DOCUMENT ONLY FOR INFORMATION OR |
| CLARIFICATION AND THE ENGINEER DOES NOT INTEND TO |
| ACCEPT RESPONSIBILITY FOR THE ELEMENTS, THE ENGINEER |
| SHALL CLEARLY NOTE ON THE DOCUMENTS THE EXTENT OF HIS |
| RESPONSIBILITY. |
| (4) ENGINEERING DRAWINGS SHALL BE LEGIBLE AND CLEARLY |
| DEFINE AND DELINEATE THE WORK IN THE PROJECT. THEY MUST |
| ALSO COMPLY WITH CHAPTER 61G15-23, F.A.C., SEALS. |
| (5) ENGINEERS SHALL CLEARLY NOTE ON ANY PRELIMINARY |
| ENGINEERING DOCUMENTS THAT SUCH DOCUMENTS ARE NOT IN |
| FINAL FORM, BUT ARE BEING TRANSMITTED TO THE PUBLIC |
| AGENCY TO RECEIVE AGENCY REVIEWS, COMMENTS AND |
| INTERPRETATIONS. THE DOCUMENTS MAY SUBSEQUENTLY BE |
| REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES |
| WITH THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE |
| AGENCY. CHANGES, REVISIONS AND MODIFICATIONS TO A |
| PROJECT MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR |
| AGENCY APPROVAL ACTION ON THE SAME PROJECT. |
| SPECIFIC AUTHORITY 471.033(2), 471.008 FS. LAW |
| IMPLEMENTED 471.033(1)(G), 471.025(3) FS. HISTORY???NEW |
| 1-26-93, FORMERLY 21H-30.003, AMENDED 11-13-08. |
| |
| 61G15-32.004 DESIGN OF WATER BASED FIRE PROTECTION |
| SYSTEMS. |
| (1) WATER BASED FIRE PROTECTION SYSTEMS INCLUDE, BUT |
| ARE NOT LIMITED TO, AUTOMATIC SPRINKLER SYSTEMS OF WET, |
| DRY, FINE WATER SPRAY (MIST), MANUAL, AND DELUGE VALVE |
| CONTROLLED TYPES, PUMPING SYSTEMS, STANDPIPES, FIRE |
| WATER MAINS AND DEDICATED FIRE PROTECTION WATER |
| SOURCES. |
| (2) TO ENSURE MINIMUM DESIGN QUALITY IN FIRE PROTECTION |
| SYSTEM ENGINEERING DOCUMENTS, SAID DOCUMENTS SHALL |
| INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION WHEN |
| APPLICABLE: |
| (A) THE POINT OF SERVICE FOR THE FIRE PROTECTION WATER |
| SUPPLY AS DEFINED BY 633.021(18) F.S. |
| (B) APPLICABLE NFPA STANDARD TO BE APPLIED, OR IN THE |
| CASE WHERE NO SUCH STANDARD EXISTS, THE ENGINEERING |
| STUDY, JUDGMENTS, AND/OR PERFORMANCE BASED ANALYSIS AND |
| CONCLUSIONS. |
| (C) CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR |
| AREA. |
| (D) DESIGN APPROACH, WHICH INCLUDES SYSTEM TYPE, |
| DENSITIES, DEVICE TEMPERATURE RATING, AND SPACING FOR |
| EACH SEPARATE 42 HAZARD OCCUPANCY. |
| (E) CHARACTERISTICS OF WATER SUPPLY TO BE USED, SUCH AS |
| MAIN SIZE AND LOCATION, WHETHER IT IS DEAD-END OR |
| CIRCULATING; AND IF DEAD-END, THE DISTANCE TO THE |
| NEAREST CIRCULATING MAIN, AS WELL AS ITS MINIMUM |
| DURATION AND RELIABILITY FOR THE MOST HYDRAULICALLY |
| DEMANDING DESIGN AREA. |
| (F) WHEN PRIVATE OR PUBLIC WATER SUPPLIES ARE USED, THE |
| FLOW TEST DATA, INCLUDING DATE AND TIME OF TEST, WHO |
| CONDUCTED TEST OR SUPPLIED INFORMATION, TEST ELEVATION, |
| STATIC GAUGE PRESSURE AT NO FLOW, FLOW RATE WITH |
| RESIDUAL GAUGE PRESSURE, HYDRANT BUTT COEFFICIENT, AND |
| LOCATION OF TEST IN RELATION TO THE HYDRAULIC POINT OF |
| SERVICE. |
| (G) VALVING AND ALARM REQUIREMENTS TO MINIMIZE |
| POTENTIAL FOR IMPAIRMENTS AND UNRECOGNIZED FLOW OF |
| WATER. |
| (H) MICROBIAL INDUCED CORROSION (MIC). THE ENGINEER OF |
| RECORD SHALL MAKE REASONABLE EFFORTS TO IDENTIFY WATER |
| SUPPLIES THAT COULD LEAD TO MICROBIAL INDUCED CORROSION |
| (MIC). SUCH EFFORTS MAY CONSIST OF DISCUSSIONS WITH THE |
| LOCAL WATER PURVEYOR AND/OR FIRE OFFICIAL, FAMILIARITY |
| WITH CONDITIONS IN THE LOCAL AREA, OR LABORATORY |
| TESTING OF WATER SUPPLIES. WHEN CONDITIONS ARE FOUND |
| THAT MAY RESULT IN MIC CONTAMINATION OF THE FIRE |
| PROTECTION PIPING, THE ENGINEER SHALL DESIGN CORRECTIVE |
| MEASURES. |
| (I) BACKFLOW PREVENTION AND METERING SPECIFICATIONS AND |
| DETAILS TO MEET LOCAL WATER PURVEYOR REQUIREMENTS |
| INCLUDING MAXIMUM ALLOWABLE PRESSURE DROP. |
| (J) QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL YARD |
| AND INTERIOR FIRE PROTECTION COMPONENTS. |
| (3) CONTRACTOR SUBMITTALS WHICH DEVIATE FROM THE ABOVE |
| MINIMUM DESIGN PARAMETERS SHALL BE CONSIDERED MATERIAL |
| DEVIATIONS AND REQUIRE SUPPLEMENTAL ENGINEERING |
| APPROVAL AND DOCUMENTATION. |
| (4) IN THE EVENT THE ENGINEER OF RECORD PROVIDES MORE |
| INFORMATION AND DIRECTION THAN IS ESTABLISHED ABOVE, HE |
| OR SHE SHALL BE HELD RESPONSIBLE FOR THE TECHNICAL |
| ACCURACY OF THE WORK IN ACCORDANCE WITH APPLICABLE |
| CODES, STANDARDS, AND SOUND ENGINEERING PRINCIPLES. |
| SPECIFIC AUTHORITY 471.008, 471.033(2), FS |
| LAW IMPLEMENTED 471.005(7), 471.033(2), FS |
| HISTORY???NEW 5-19-93, FORMERLY 21H-32.004, AMENDED |
| 4-2-2000, 6-26-01, 7-12-05 |
| |
| THE DESIGN DOCUMENTS ARE REQUIRED TO BE SUBMITTED WITH |
| THE MASTER PERMT. |
| |
| PLEASE REVIEW AND PROVIDE THE REQUIRED DOCUMENTATION |
| PER THE F.A.C. |
| |
| |
| 6) SHEET T100 - THERE ARE INDICATIONS OF SEPARATE FIRE |
| ALARM SHOP DRAWING SUBMITTAL. |
| |
| IS THERE AN EXISTING FIRE ALARM SYSTEM OR IS IT A NEW |
| SYSTEM? |
| |
| PER F.A.C. |
| |
| 61G15-32.008 DESIGN OF FIRE ALARMS, SIGNALING SYSTEMS, |
| AND CONTROL SYSTEMS. |
| (1) FIRE ALARMS AND DETECTION SYSTEMS INCLUDE FIRE |
| PROTECTION SUPERVISION, EMERGENCY ALARM CIRCUITS, |
| ACTIVATION OF LIFE SAFETY SYSTEM CONTROLS AND REMOTE |
| SIGNALING OF EMERGENCY CONDITIONS. ITEMS TO BE |
| CONSIDERED IN THE DESIGN OR ANALYSIS OF FIRE ALARM AND |
| DETECTION SYSTEMS ARE, AS APPLICABLE TO THE PARTICULAR |
| PROJECT: OCCUPANCY AND CLASSIFICATION, MONITORING, |
| CONTROL AND COMMUNICATION, CABLING AND SUPERVISION |
| REQUIREMENTS, INSTALLATION REQUIREMENTS, |
| INTEROPERABILITY AND PERFORMANCE REQUIREMENTS. |
| (2) THE DESIGN SPECIFICATIONS SHALL BE BASED ON THE |
| FLORIDA BUILDING CODE, THE FLORIDA FIRE PREVENTION |
| CODE, OR AS REQUIRED BY THE LOCAL AUTHORITY HAVING |
| JURISDICTION. THE FLORIDA BUILDING CODE AND THE FLORIDA |
| FIRE PREVENTION CODE ARE INCORPORATED BY REFERENCE IN |
| RULE 61G15-18.011, F.A.C. |
| (3) FOR ENGINEERING DOCUMENTS PERTAINING TO FIRE |
| PROTECTION SYSTEMS EXEMPTED BY THE THRESHOLD |
| REQUIREMENTS FOR MANDATORY USE OF PROFESSIONAL |
| ENGINEERING SERVICES, THE ENGINEER OF RECORD SHALL |
| DETERMINE THE LEVEL OF DETAIL SHOWN ON PLANS FOR A FIRE |
| PROTECTION SYSTEM. ALL SUCH PLANS SHALL INCLUDE A |
| DISCLAIMER STATING THE FIRE PROTECTION SYSTEM IS EXEMPT |
| FROM PROFESSIONAL ENGINEERING SERVICES AND SHALL |
| PROVIDE A CLEAR UNDERSTANDING OF THE MINIMUM SYSTEM |
| REQUIREMENTS EXPECTED TO BE INSTALLED BY THE CONTRACTOR |
| AND PERMITTED BY THE AUTHORITY HAVING JURISDICTION |
| (AHJ). IN THE EVENT THE ENGINEER OF RECORD PROVIDES |
| MORE INFORMATION AND DIRECTION THAN IS MINIMALLY |
| REQUIRED, HE OR SHE SHALL BE HELD RESPONSIBLE FOR THE |
| TECHNICAL ACCURACY OF THE WORK IN ACCORDANCE WITH |
| APPLICABLE CODES, STANDARDS, AND SOUND ENGINEERING |
| PRINCIPLES. |
| (4) TO ENSURE MINIMUM DESIGN QUALITY OF FIRE ALARM AND |
| DETECTION SYSTEMS ENGINEERING DOCUMENTS, SAID DOCUMENTS |
| SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION |
| WHEN APPLICABLE: |
| (A) THE DOCUMENTS SHALL BE CLEAR, WITH A SYMBOLS |
| LEGEND, SYSTEM RISER DIAGRAM SHOWING ALL INITIATION AND |
| NOTIFICATION COMPONENTS, AND CABLING REQUIREMENTS. THE |
| DOCUMENTS SHALL INDICATE LOCATIONS WHERE FIRE RATINGS |
| ARE REQUIRED AS DETERMINED BY THE SYSTEM???S |
| SURVIVABILITY REQUIREMENTS, AND SHALL IDENTIFY THE |
| GENERAL OCCUPANCY OF THE PROTECTED PROPERTY AND EACH |
| ROOM AND AREA UNLESS IT IS CLEAR FROM FEATURES SHOWN. |
| (B) LOCATE INITIATION AND NOTIFICATION DEVICES AND |
| CONNECTIONS TO RELATED SYSTEMS ON THE FLOOR PLANS AND |
| SECTIONS WHEN NEEDED FOR CLARITY. RELATED SYSTEMS |
| INCLUDE ELEVATOR CONTROLS, SMOKE CONTROL SYSTEMS, |
| DAMPERS, DOOR RELEASE, ANY OTHER SYSTEMS OR ELEMENTS |
| DIRECTLY OR INDIRECTLY CONTROLLED OR MONITORED. |
| (C) STROBE INTENSITY AND SPEAKER OUTPUT RATINGS FOR ALL |
| NOTIFICATION DEVICES. |
| (D) IDENTIFY THE CLASS OF CIRCUITS AS LISTED IN NFPA |
| 72, WHICH IS CONTAINED WITHIN AND INCORPORATED INTO THE |
| FLORIDA FIRE PREVENTION CODE. |
| (E) IDENTIFY THE FUNCTIONS REQUIRED BY THE ALARM AND |
| CONTROL SYSTEMS INCLUDING THE TRANSMISSION OF EMERGENCY |
| SIGNALS BEING MONITORED OR ANNUNCIATED. |
| (F) INDICATE WHETHER THE FIRE ALARM IS CONVENTIONAL OR |
| ADDRESSABLE, AND INDICATE ALL ZONING. |
| (G) LOCATE SURGE PROTECTIVE DEVICES AND REQUIRED |
| PROTECTIVE FEATURES. |
| (H) IDENTIFY AND LOCATE SYSTEM DEVICES THAT ARE SUBJECT |
| TO ENVIRONMENTAL FACTORS, AND INDICATE REQUIREMENTS FOR |
| THE PROTECTION OF EQUIPMENT FROM TEMPERATURE, HUMIDITY |
| OR CORROSIVE ATMOSPHERES, INCLUDING COASTAL SALT AIR. |
| (I) THE DOCUMENTS SHALL INCLUDE A SITE PLAN OF THE |
| IMMEDIATE AREA AROUND THE PROTECTED BUILDING, STRUCTURE |
| OR EQUIPMENT WHEN ALARM DEVICES ARE REQUIRED OUTSIDE |
| THE STRUCTURE. |
| (J) IN BUILDINGS WHERE SMOKE DETECTION WILL BE |
| OBSTRUCTED BY WALLS, BEAMS OR CEILING FEATURES, THE |
| ENGINEER OF RECORD SHALL PROVIDE APPLICABLE DESIGN AND |
| DETAILS TO DIRECT THE INSTALLER TO MITIGATE THE |
| OBSTRUCTIONS. IN BUILDINGS WITH SMOKE DETECTION UNDER A |
| PITCHED ROOF, THE PLANS SHALL INDICATE THE ROOF PITCH |
| AND A BUILDING SECTION SHALL BE PROVIDED AS PART OF THE |
| ENGINEERING DESIGN DOCUMENTS. |
| (K) FOR FIRE DETECTION SYSTEMS UTILIZING SMOKE |
| DETECTION IN SITUATIONS WHERE SMOKE STRATIFICATION IS |
| ANTICIPATED, THE DESIGN SHALL PROVIDE THE NECESSARY |
| CRITERIA TO MITIGATE THE DETECTION PROBLEMS. |
| (L) SYSTEMS DESIGNED USING PERFORMANCE BASED CRITERIA |
| SHALL BE IDENTIFIED AND REFERENCED TO DESIGN GUIDES OR |
| STANDARDS APPROVED BY THE LOCAL AUTHORITY HAVING |
| JURISDICTION CONSISTENT WITH STANDARDS ADOPTED BY THE |
| FLORIDA FIRE PREVENTION CODE AND THE FLORIDA BUILDING |
| CODE. |
| (M) THE SYSTEM DESIGN MUST INDICATE IF THE SYSTEM IS TO |
| PROVIDE A GENERAL EVACUATION SIGNAL OR A ZONED |
| EVACUATION FOR ALL HIGH-RISE BUILDINGS OR |
| MULTI-TENANTED PROPERTIES AS DEFINED IN SECTION 2 OF |
| THE FLORIDA BUILDING CODE, BUILDING. |
| (N) WIRING REQUIREMENTS FOR UNDERGROUND, WET LOCATIONS, |
| CAMPUS STYLE WIRING, PROTECTION AGAINST DAMAGE AND |
| BURIAL DEPTH SHALL BE SPECIFIED OR INDICATED ON THE |
| ENGINEERING DESIGN DOCUMENTS. |
| (O) REQUIREMENTS FOR OPERATIONS AND MAINTENANCE |
| PROCEDURES, MANUALS, SYSTEM DOCUMENTATION, AND |
| INSTRUCTION OF OWNER???S OPERATING PERSONNEL, AS NEEDED |
| TO OPERATE THE SYSTEMS AS INTENDED OVER TIME. |
| (5) IN THE EVENT THAT THE ENGINEER OF RECORD ELECTS TO |
| SPECIFY SPECIFIC EQUIPMENT AND TO SHOW THE REQUIRED |
| WIRING, BATTERY AND VOLTAGE DROP (CIRCUIT ANALYSIS) |
| CALCULATIONS SHALL BE COMPLETED. THE CALCULATIONS SHALL |
| BE COMPLETED USING THE EQUIPMENT MANUFACTURER???S DATA |
| AND APPLICABLE NFPA 72 PROCEDURES. |
| (6) SYSTEM TEST REQUIREMENTS SHALL BE NOTED ON THE |
| ENGINEERING DESIGN DOCUMENTS. |
| (7) WHEN THE ENGINEER OF RECORD DETERMINES THAT SPECIAL |
| REQUIREMENTS ARE REQUIRED BY THE OWNER, INSURANCE |
| UNDERWRITER OR LOCAL FIRE CODE AMENDMENTS THESE |
| REQUIREMENTS SHALL BE DOCUMENTED OR REFERENCED ON THE |
| ENGINEERING DESIGN DOCUMENTS. |
| (8) NO LATER THAN 90 DAYS PRIOR TO DECEMBER 31, 2026, |
| THE BOARD SHALL REVIEW AND AMEND, MODIFY, OR SUNSET |
| THIS RULE IF IT DETERMINES THIS RULE CREATES BARRIERS |
| TO ENTRY FOR PRIVATE BUSINESS COMPETITION, IS |
| DUPLICATIVE, OUTDATED, OBSOLETE, OVERLY BURDENSOME, OR |
| IMPOSES EXCESSIVE COSTS. FAILURE BY THE BOARD TO ACT IN |
| ACCORDANCE WITH THIS PROVISION WILL RESULT IN THE |
| EXPIRATION OF THIS RULE ON DECEMBER 31, 2026. |
| RULEMAKING AUTHORITY 471.008, 471.033(2) FS. LAW |
| IMPLEMENTED 471.033 FS. HISTORY???NEW 5-19-93, FORMERLY |
| 21H-32.008, AMENDED 3-26-09, 3-28-17, 7-25-19, 3-23-22. |
| |
| |
| PLEASE REVIEW AND PROVIDE THE REQUIRED DOCUMENTATION |
| PER THE F.A.C. |
| |
| |
| 7) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 8) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |