Date |
Text |
2023-05-10 17:05:24 | 2ND REVIEW FBC-2020 PLUMBING |
| PERMIT- 22110628 |
| 5/10/23 |
| |
| CODES IN EFFECT: |
| FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 |
| FS- FLORIDA STATUTES |
| FAC- FLORIDA ADMINISTRATIVE CODE |
| WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) IT APPEARS MANY OF THE KEY PLUMBING DRAWINGS |
| INCLUDING P200.1- P.200.6 WHICH ARE THE UNDERGROUND |
| DRAINAGE PIPING PLANS FOR BUILDING A HAVE NOT BEEN |
| CORRECTED AND RESUBMITTED (SEE 1ST REVIEW COMMENT #4 |
| COPIED BELOW). RESUBMITTED IN THEIR PLACES ARE |
| P.200.1A- P200.6A WHICH ARE WATER AND GAS PLANS. PLEASE |
| RESUBMIT THE PLANS WITH THE REQUESTED CORRECTIONS PER |
| COMMENT #4. |
| |
| 4) P200.1- P200.6 BUILDING A GROUND LEVEL PLANS: |
| A) SANITARY AND STORM DRAIN PIPE SIZES MISSING- TABLES |
| 710.1(1), 710.1(2), 1106.2 FBC P. |
| B) DFU'S FOR SANITARY PIPING NOT SHOWN- TABLE 710.1(1). |
| C) PROVIDE THE STORM DRAINAGE FLOW IN GPM FOR EACH |
| STORM DRAIN BRANCH AND MAIN- TABLE 1106.2 FBC P. |
| D) SHOW THE SECONDARY ROOF DRAINAGE TERMINATION |
| LOCATIONS- SEC. 1108.2 FBC P. |
| E) SHOW THE CONDENSATE AND WATER HEATER DISCHARGE |
| VERTICAL RISER LOCATIONS AND HORIZONTAL PIPING RUNS AND |
| TERMINATION LOCATIONS- SECS. 314.2.1 & 504.7.1, 504.7.2 |
| FBC P. |
| F) SHOW THE ELEVATOR SUMP PUMP LOCATIONS AND DISCHARGE |
| PIPING RUNS TO THE SANITARY DISPOSAL LOCATIONS- SEC. |
| 712.3.5 FBC P. |
| G) SHOW EMERGENCY FLOOR DRAIN LOCATIONS AND TRAP SEAL |
| PROTECTION METHOD- SEC. 1002.4 FBC P. |
| |
| 2) 2ND REQUEST FOR POTABLE WATER BACKFLOW PERMIT |
| APPLICATIONS. SHEET SP200: THE PLAN SHOWS MULTIPLE RPZ |
| BACKFLOW PREVENTERS FOR THE POTABLE WATER AND FIRE |
| SERVICE LINES FOR BUILDINGS WHICH WILL REQUIRE SEPARATE |
| PERMIT SUBMITTALS FOR EACH ONE. CONCERNING THE RPZ'S |
| FOR THE POTABLE WATER PLEASE NOTE DUE TO A CHANGE IN |
| PROCESS, THE BACKFLOW PERMITS ARE REQUIRED TO BE |
| SUBMITTED PRIOR TO APPROVAL OF THIS PLUMBING REVIEW. |
| YOU CAN SUBMIT APPLICATIONS TBD (TO BE DETERMINED) IF |
| YOU DO NOT HAVE A CONTRACTOR SELECTED BY EMAILING A |
| COMPLETED PERMIT APPLICATION TO |
| [email protected]. YOU WILL RECEIVE INSTRUCTIONS |
| TO PAY FEES AND UPLOAD PLANS. YOU MAY UPLOAD PLANS AND |
| PAY FEES AT A FUTURE DATE, BUT THE APPLICATIONS ARE |
| REQUIRED AT THIS TIME. WE RECOMMEND THAT YOU PAY FEES |
| AND UPLOAD PLANS AT THE SAME TIME. AFTER YOU HAVE THE |
| PERMIT(S) GENERATED, NOTIFY ME VIA EMAIL AND I WILL |
| CHANGE THE REVIEW STATUS TO PASS. |
| |
| A) PLEASE NOTE THAT THE SEPARATE PERMIT SUBMITTALS FOR |
| THE BACKFLOW PREVENTERS SHALL INCLUDE A MANUFACTURER'S |
| SPECIFICATION SHEET SHOWING THE MAKE, MODEL AND SIZE OF |
| THE DEVICE, AND WHICH STATES THE DEVICE IS LEAD-FREE |
| AND IS ON THE APPROVED DEVICE LIST PUBLISHED BY THE |
| UNIVERSITY OF SOUTHERN CALIFORNIA (USC). ALSO REQUIRED |
| IS A SITE OR CIVIL SHOWING THE LOCATION OF THE BACKFLOW |
| PREVENTER- SEC. 107.2.1 WPB. |
| |
| 3) P200.7 & P.200.8: 2ND REQUEST TO PROVIDE THE STORM |
| DRAINAGE FLOW IN GPM FOR EACH STORM DRAIN BRANCH AND |
| MAIN- TABLE 1106.2 FBC P. |
| |
| 4) P402A: SHOW THE LOCATION OF THE GREASE AND SOLIDS |
| INTERCEPTORS ON THE SANITARY DRAINAGE FLOOR PLANS- SEE |
| COMMENT #1 ABOVE. |
| PLEASE NOTE DUE TO A CHANGE IN PROCESS, THE GREASE |
| INTERCEPTOR PERMITS ARE REQUIRED TO BE SUBMITTED PRIOR |
| TO APPROVAL OF THIS PLUMBING REVIEW. YOU CAN SUBMIT |
| APPLICATIONS TBD (TO BE DETERMINED) IF YOU DO NOT HAVE |
| A CONTRACTOR SELECTED BY EMAILING A COMPLETED PERMIT |
| APPLICATION TO [email protected]. YOU WILL |
| RECEIVE INSTRUCTIONS TO PAY FEES AND UPLOAD PLANS. YOU |
| MAY UPLOAD PLANS AND PAY FEES AT A FUTURE DATE, BUT THE |
| APPLICATIONS ARE REQUIRED AT THIS TIME. WE RECOMMEND |
| THAT YOU PAY FEES AND UPLOAD PLANS AT THE SAME TIME. |
| AFTER YOU HAVE THE PERMIT(S) GENERATED, NOTIFY ME VIA |
| EMAIL AND I WILL CHANGE THE REVIEW STATUS TO PASS. |
| GREASE INTERCEPTOR PLAN REVIEW REQUIREMENTS. |
| |
| A) EQUIPMENT SCHEDULE INDICATING THE MAKE AND MODEL AND |
| CAPACITY OF THE UNIT. |
| B) SIZING CALCULATIONS IN ACCORDANCE WITH ASME |
| A112.14.3, ASME A112.14.4, ASME A112.14.6, CSA B481.3, |
| OR PDI G101 FOR HYDROMECHANICAL TYPES; OR SEC. 1003.3.7 |
| FOR GRAVITY TYPES. |
| C) ENLARGED PIPING DIAGRAM INCLUDING LOCATIONS AND |
| SIZES OF INLETS, OUTLETS, CLEANOUTS, FLOW CONTROL |
| VENTS, AND SAMPLING PORTS. |
| D) MANUFACTURER'S SPECIFICATIONS AND INSTALLATION |
| GUIDELINES WITH APPROVAL STAMP BY THE ENGINEER OF |
| RECORD- SECS.1003.3.5 OR 1003.3.7 FBC P. |
| E) ACCESS LID DETAILS INDICATING THE LIDS WILL BE HEAVY |
| DUTY TRAFFIC RATED AND WILL BE EQUIPPED WITH ACCESS |
| RESTRICTORS. HEAVY DUTY LIDS ARE ALSO REQUIRED FOR |
| CLEANOUTS, AND SAMPLING PORTS (IF INSTALLED). |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL/PLUMBING PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |