Plan Review Notes
Plan Review Notes For Permit 22110556
Permit Number 22110556
Review Stop B
Sequence Number 1
Notes
Date Text
2023-01-10 10:02:53PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE 48
 KW GENERATOR THAT WILL BE INSTALLED. FBC 107.2.1
  
 2) THE GENERATOR PAD ENGINEERING NEEDS TO BE FOR A WIND
 SPEED OF 170 MPH VULT. FBC AMENDMENTS 120
  
 3) THE GENERATOR PAD ENGINEEING IS REQUIRED TO HAVE THE
 ENGINEER'S DIGITAL SIGNATURE ON IT. ELECTRONICALLY
 SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT
 OR ENGINEER'S DIGITAL SIGNATURE ON THEM. FS 481 & FAC
 61G1 OR FS 471 & FAC 61G15
  
 4) SUBMIT A SURVEY SHOWING THE LOCATION OF THE
 GENERATOR. THE GENERATOR EXHAUST IS REQUIRED TO BE AT
 LEAST 10 FEET FROM ANY OPENINGS INTO A BUILDING.
 R303.5.1 INTAKE OPENINGS. MECHANICAL AND GRAVITY
 OUTDOOR AIR INTAKE OPENINGS SHALL BE LOCATED NOT LESS
 THAN 10 FEET (3048 MM) FROM ANY HAZARDOUS OR NOXIOUS
 CONTAMINANT, SUCH AS VENTS, CHIMNEYS, PLUMBING VENTS,
 STREETS, ALLEYS, PARKING LOTS AND LOADING DOCKS.
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved