2023-05-10 14:03:55 | WINDOWS AND DOORS |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - |
| |
| 1) AN EXHAUST SYSTEM WILL BE REQUIRED FOR THE BATHROOM |
| - FBC R303.3 BATHROOMS. |
| BATHROOMS, WATER CLOSET COMPARTMENTS AND OTHER SIMILAR |
| ROOMS SHALL BE PROVIDED WITH AGGREGATE GLAZING AREA IN |
| WINDOWS OF NOT LESS THAN 3 SQUARE FEET (0.3 M2), |
| ONE-HALF OF WHICH MUST BE OPENABLE. |
| EXCEPTION: THE GLAZED AREAS SHALL NOT BE REQUIRED WHERE |
| ARTIFICIAL LIGHT AND A LOCAL EXHAUST SYSTEM ARE |
| PROVIDED. THE MINIMUM LOCAL EXHAUST RATES SHALL BE |
| DETERMINED IN ACCORDANCE WITH SECTION M1507. EXHAUST |
| AIR FROM THE SPACE SHALL BE EXHAUSTED DIRECTLY TO THE |
| OUTDOORS. |
| |
| 2) PLEASE REVISE THE BUILDING PERMIT APPLICATION TO |
| SHOW THE JOB VALUE THAT INCLUDES THE LABOR COST - |
| WINDOW ESTIMATE PROVIDED SHOWS ONLY THE COST OF THE |
| WINDOWS - FBC 109.3 BUILDING PERMIT VALUATION. FOR |
| PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COST, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| SERVICES (MARSHALL ??? SWIFT, MEANS, ETC.) AS PUBLISHED |
| BY INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |