Date |
Text |
2023-01-23 13:50:39 | ZONING AND PLANNING |
| PROJECT: CIELO 740 N DIXIE HWY |
| PERMIT NO. 22100341 |
| DATE: JANUARY 23, 2023 |
| CONTACT: CLAUDIA IBAVEN, CITY URBAN DESIGNER, AT |
| 561-822-1402 OR VIA [email protected]. |
| I HAVE REVIEWED THE ABOVE REFERENCED PETITION AND |
| PROVIDE THE FOLLOWING COMMENTS: |
| |
| AS NOTED IN PREVIOUS COMMENTS SOME FLOOR PLANS SHEETS |
| INDICATE CHANGES TO WINDOWS AND DOORS. BELOW SOME |
| QUESTIONS FROM RESPONSES RECEIVED. |
| |
| SHEET A-3.2.1 |
| WEST ELEVATION: IT WAS PREVIOUSLY MENTIONED THAT |
| WINDOWS BETWEEN CERTAIN GRIDS ONLY CHANGED THEIR |
| MULLIONS TO COMPLY WITH MECHANICAL VENTILATION |
| REQUIREMENTS, ARE CHANGES ON ALL WINDOWS ON ALL FLOOR |
| LEVELS OR CERTAIN FLOOR LEVELS? HAVE ANY OF THEM CHANGE |
| IN SIZE? |
| NORTH ELEVATION: THERE SEEMS TO BE A CHANGED IN THE |
| WINDOW BELOW THE PEDESTRIAN BRIDGE, PLEASE CONFIRM AND |
| EXPLAIN CHANGE. |
| |
| SHEET A-3.2.2 |
| EAST ELEVATION: IN ADDITION TO THE NANAWALL CHANGE, ON |
| THE GROUND FLOOR BETWEEN GRIDS 12 AND 11 THERE SEEMS TO |
| BE A CHANGE, IS THIS CHANGE ONLY REMOVING THE |
| ???CONCRETE EYEBROW??? FROM THE WINDOW? |
| SOUTH ELEVATION: PLEASE, CONFIRM IF NO CHANGES WERE |
| MADE TO THE SOUTH ELEVATION. |
| |
| OTHER COMMENTS: |
| HAS ANY OF THE MATERIALS LISTED IN THE ELEVATION LEGEND |
| CHANGED FROM WHAT WAS ORIGINALLY APPROVED BY DAC? |
| |
| ARE ANY CHANGES IN GRADING, PAVING AND DRAINAGE PLANS |
| AFFECTING OPEN SPACE AREAS AND POTENTIALLY CHANGE |
| LANDSCAPE SHEETS AND CALCULATIONS FOR REQUIRED FOR OPEN |
| SPACE, VEGETATED AREA, AND TREE CANOPY AS SEEN ON SHEET |
| APPROVED 050- L-1-6-01 OPEN SPACE DIAGRAM IN MASTER |
| PERMIT? |
| |
| PLEASE CONFIRM THAT MECHANICAL EQUIPMENT ON ROOF IS |
| SCREENED WITH A WALL OR SCREENING AS TALL AS THE |
| EQUIPMENT. |
| |