2022-11-01 16:38:171ST REVIEW FBC-2020 PLUMBING
 PERMIT- 22100340
 11/1/22
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
 CIELO NORTH- PERMIT REVISION-22100340 PLUMBING REVIEW
 COMMENTS
  
 1) A-1.1.1 & P-2.1.1: PLUMBING FIXTURE CALCULATIONS NOT
 PROVIDED- TABLE 403.1 & SEC. 403.1.1. PLEASE PROVIDE A
 SCHEDULE THAT SHOWS THE REQUIRED AND PROVIDED NUMBER OF
 FIXTURES FOR THE OCCUPANCIES. IT IS ACKNOWLEDGED THAT
 THE OCCUPANT LOADS OF THE RESIDENTIAL (APARTMENTS) AND
 THE S-2 PARKING GARAGE CAN BE EXCLUDED FROM THE MIXED
 OCCUPANCY CALCULATION HOWEVER THAT RESULTS WITH AN
 OCCUPANT LOAD OF 124 TO PROVIDE PLUMBING FIXTURES FOR.
 THE NUMBER CAN BE REDUCED FURTHER DOWN TO 68 IF THE
 OCCUPANTS OF THE M FUTURE RETAIL ARE REMOVED HOWEVER
 THAT WILL HAVE TO BE CLARIFIED ON THE PLAN BECAUSE NO
 FUTURE SANITARY LINE IS SHOWN ON THE PLUMBING PLANS.
 PLEASE NOTE THERE IS ONLY ONE SINGLE-OCCUPANT TOILET
 ROOM SHOWN ON THE PLAN WITH ONE WATER CLOSET AND ONE
 LAVATORY WHICH IS DEFICIENT FOR THE MINIMUM 68
 OCCUPANTS OR THE MAXIMUM 124 OCCUPANTS. ALSO MISSING
 ARE THE REQUIRED DRINKING FOUNTAINS AND SERVICE SINK-
 TABLE 403.1.
  
 2) P-2.1.1: SEPARATE PERMITS AND PLANS ARE REQUIRED FOR
 THE POTABLE WATER BACKFLOW PREVENTER, GREASE
 INTERCEPTOR, IRRIGATION, AND THE IRRIGATION BACKFLOW.
 PLEASE ADD THESE ITEMS TO THE DEFERRED SUBMITTALS LIST
 FOR CLARIFICATION- SEC. 105.1 & 107.2.1 WPB. PLEASE
 NOTE THAT A GAS METER IS SHOWN ON P-1.1.0 HOWEVER NO
 GAS PLANS HAVE BEEN PROVIDED. WILL GAS ALSO BE UNDER
 SEPARATE PERMIT?
  
 3) P-2.1.1, P-5.1.6: THE WASTEWATER FROM THE FOUNTAIN
 IS DRAINING INTO THE SUMP PIT AND THEN DISCHARGING INTO
 THE STORM SYSTEM. PLEASE NOTE CHLORINATED POOL OR
 FOUNTAIN WASTE WATER SHALL NOT DRAIN INTO THE STORM
 SYSTEM UNLESS IT HAS BEEN DECHLORINATED PER SEC. 90-205
 (1) WPB CODE OF ORDINANCES. PLEASE REVIEW THE FOLLOWING
 INFORMATION CONCERNING THE FOUNTAIN WASTEWATER.
  
 SWIMMING POOL WATER MAY BE DISCHARGED TO THE CITY
 STORMWATER SEWER ONLY IF THE WATER IS DECHLORINATED
 ACCORDING TO SECTION 90-205(1) OF THE CITY OF WEST PALM
 BEACH CODE OF ORDINANCES. SUBMIT THE MANUFACTURER???S
 SPECIFICATION FOR THE DICHLORINATION SYSTEM FOR REVIEW
 AND STAMPING BEFORE THE INSPECTION. AT THE TIME OF POOL
 WATER DISCHARGE, THE FOLLOWING WILL BE REQUIRED:
 ??? THE RECEIVING INLET MUST BE PROTECTED (FILTER CLOTH
 TO KEEP EXCESS SEDIMENTS FROM ROADWAY WASHING INTO THE
 INLET).
 ??? NO DISCHARGE HOSE CAN BE DIRECTLY INSERTED INTO THE
 INLET TO DISCHARGE EFFLUENT.
 ??? WHENEVER POSSIBLE, DISCHARGE EFFLUENT SHALL BE
 ALLOWED TO FILTER THROUGH GRASS AREA ON THE POOL OWNERS
 PROPERTY BEFORE DISCHARGING ON CITY PROPERTY.
 ??? DISCHARGE SHALL NOT FLOOD STREETS OR NEIGHBORING
 PROPERTY.
 ??? FOR TECHNICAL QUESTIONS, DON'T HESITATE TO CONTACT
 O&M SUPERINTENDENT STEPHON HARRIS AT [email protected] OR
 561-822-2168.
 ??? FOR STORMWATER DISCHARGE COMPLIANCE QUESTIONS,
 PLEASE CONTACT CHRIS JACKSON, ENVIRONMENTAL COMPLIANCE
 SPECIALIST III, PUBLIC UTILITIES DEPARTMENT, (561)
 822-2062 OR [email protected].
  
 4) P-2.1.1 & P-6.2.2: PLEASE PROVIDE AN EQUIPMENT
 SCHEDULE FOR THE COURTYARD SUMP PUMP LISTING MAKE AND
 MODEL AND ELECTRICAL DATA- SEC. 712.3 FBC P.
  
 5) P-2.1.1 & P-6.2.1: THE ELEVATOR AND TRASH ROOM SUMP
 PUMPS SHALL BE EQUIPPED WITH OIL ALARMS OR THE SUMP
 DISCHARGE SHALL BE CONVEYED TO AN OIL SEPARATOR(S)-
 SEC. 1003.4 FBC P.
  
 6) P-2.1.1 NOTE 9: SHOW THE CONDENSATE DRAINAGE WILL BE
 CONVEYED AWAY FROM THE BUILDING TO AN APPROVED PLACE OF
 DISPOSAL SUCH AS THE STORM DRAIN OR A DRYWELL- SEC.
 314.2.1 FBC P.
  
 7) P-2.1.1: PROVIDE A NOTE TO SHOW THE LOCATIONS OF THE
 WATER HEATER DRAIN PAN LINE TERMINATION LOCATIONS- SEC.
 504.7.2 FBC P.
  
 8) P-6.1.2: PROVIDE A BACKFLOW PREVENTER FOR THE WATER
 LINE SUPPLY LINE TO THE TRASH CHUTE- SEC. 608.3 FBC P.
 PLEASE INCLUDE AN EQUIPMENT SCHEDULE FOR THE DEVICE ON
 SHEET P-6.2.2.
  
 9) P-5.1.1, P-6.2.2: PROVIDE A BACKFLOW PREVENTER FOR
 THE WATER LINE SUPPLY LINE TO THE TRASH CHUTE- SEC.
 608.3 FBC P. PLEASE INCLUDE AN EQUIPMENT SCHEDULE FOR
 THE DEVICE ON SHEET P-6.2.2.
  
 10) P-5.1.1: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE SPEARS PERFORATED CAPS. THE CAPS WILL BE INSTALLED
 IN PLENUM ENCLOSURES AND SHALL BE NONCOMBUSTIBLE OR
 SHALL BE LISTED AND LABELED AS HAVING A FLAME SPREAD
 INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX
 OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM
 E84 OR UL 723- SEC. 602.2.1 FBC M. IT APPEARS THE CAPS
 WILL BE VENTING THE TRAPS WHICH IS PROHIBITED IN PLENUM
 ENCLOSURES- SECS. 903.5, 905.1 & 918.8.
  
 11) P-5.1.4: IT APPEARS THAT THERE ARE MISSING VENT
 STACKS THAT ARE REQUIRED TO BE CONNECTED AT THE BASE OF
 THE SOIL STACKS (#2, 5, 6, 9, & 11). THE VENT STACK
 POINTS OF CONNECTION SHALL BE DOWNSTREAM OF THE SOIL
 STACK BASES WITHIN A DISTANCE OF 10 TIMES THE DIAMETER
 OF THE SOIL STACK. PLEASE NOTE P-5.1.4 SHOWS STACK #12
 WHICH IS NOT SHOWN ON THE RISER DRAWINGS- P-5.1.2 &
 P-5.1.3.
  
 12) P-5.1.4: THE DRAWING SHOWS MANY STACKS COMBINED
 TOGETHER BEFORE CONNECTING TO THE BUILDING DRAIN SUCH
 AS (1&2), (4&5), (1&10), (11,3,4). WASTE AND SOIL
 STACKS CANNOT BE COMBINED TOGETHER BECAUSE EACH
 REQUIRES A SEPARATE VENT, AND EACH STACK SHALL CONNECT
 SEPARATELY TO THE BUILDING DRAIN- SEC. 913.2 FBC P.
  
 13) P-2.1.1 & P-5.1.4: THE REVISED PLANS SHOW A
 BAR/CAFE WITH THE DRAINAGE FROM THE SINK AND DISHWASHER
 DISCHARGING TO THE SANITARY WHICH MAY BE PROHIBITED IF
 THE DRAINAGE IS GREASE LADEN- SEC. 1003.3.1 FBC P. MORE
 INFORMATION WILL BE REQUIRED CONCERNING THE FOOD AND
 DRINK OPERATIONS IN THE BAR/CAFE. A) DRAINAGE FROM THE
 ICEMAKER IN THE BAR DISCHARGE TO THE SANITARY.
  
 14) P-2.1.1, P-2.1.1G, P-5.1.5, & P-5.1.6: PROVIDE
 CLEANOUTS FOR THE HORIZONTAL STORM DRAINS WHERE THEY
 EXIT THE BUILDING AND CONNECT WITH LATERALS- SEC.
 1101.8 FBC P.
  
 15) P-2.1.6, P-5.1.5 & P-5.1.6: ROOF DRAINAGE VERTICAL
 AND HORIZONTAL DRAIN PIPE SIZES ARE DETERMINED BY GPM
 FLOW. PLEASE CONVERT THE SQUARE FOOTAGE TOTALS ON THE
 DRAWINGS TO GPM TO VERIFY VERTICAL LEADERS AND
 HORIZONTAL DRAINS ARE SIZED IN COMPLIANCE WITH TABLES
 1106.2 & 1006.3 FBC P.
  
 A) P-2.1.6, P-2.1.4G: PLEASE PROVIDE ADDITIONAL ROOF
 DRAINAGE INFORMATION FOR THE MAIN BUILDING AND LEVEL 5
 TERRACE OF THE GARAGE INCLUDING RAINFALL RATE, SQUARE
 FOOTAGE BREAKDOWN THAT INCLUDES THE PARAPET WALLS, AND
 AN EMERGENCY SCUPPER DETAIL- SECS. 1106.1, 1106.4, AND
 1106.5 FBC P.
  
 B) P-2.1.4G: PLEASE DETAIL EMERGENCY (OVERFLOW)
 DRAINAGE FOR THE TERRACE AND DISPOSAL LOCATION- SEC.
 1106.5 FBC P.
  
 16) P-5.1.1, P-5.1.7: SHOW THE LOCATIONS OF FULL-OPEN
 VALVES AT THE BASES OF THE WATER RISERS. THE NOTE ON
 P-5.1.1 REFERENCING THE WATER HEATER DETAIL FOR
 LOCATION DOES NOT APPEAR RELEVANT TO THE CODE
 REQUIREMENT- SEC. 606.1(4) FBC P.
  
 17) P-2.1.1: TO HELP EXPEDITE THE REVIEW PLEASE NOTE &
 LABEL THE WATER SERVICE ENTRANCE INTO THE BUILDING AND
 LABEL THE LOCATION OF THE DOMESTIC BOOSTER PUMP- SEC.
 107.2.1 WPB.
  
 18) P-2.1.1, P-5.1.7 & P-6.1.2: PROVIDE EQUIPMENT
 SCHEDULES AND INSTALLATION DETAILS FOR THE GROUND FLOOR
 WATER HEATERS SHOWN ON THE ISO- SEC. 107.2.1 WPB.
 IDENTIFY THE FIXTURE BEING SUPPLIED HOT WATER FROM THE
 TANKLESS WATER HEATER SHOWN IN THE AREA OF THE TRASH
 ROOM AND BOOSTER. THE DETAIL SHOULD SHOW THE MEANS OF
 LIMITING THE HOT WATER TEMPERATURE, AND THE HOT WATER
 PIPE INSULATION SPECIFICATION- SECS. 607.1.1, 607.3 FBC
 P, AND TABLE C403.2.10 FBC ENERGY. A) PROVIDE A
 BACKFLOW PREVENTER FOR THE SUPPLY LINE TO THE ICE
 MAKER- SEC. 608.3 FBC P.
  
 19) P-5.1.7 & P-6.1.2: SHOW THE MEANS OF PROVIDING
 TEMPERED WATER DELIVERY FROM THE GROUND FLOOR LAVATORY
 IN THE BATHROOM- SEC. 419.5 FBC P. PLEASE NOTE THAT
 TEMPERATURE LIMITING DEVICES (MIXING VALVES) SHALL BE
 ASSE 1070 LISTED- SEC. 607.1.2.
  
 20) P-6.1.2: PLEASE SEE NOTE #8 AT THE WATER HEATER
 DETAILS AND PROVIDE THE HW PIPE INSULATION
 SPECIFICATIONS- TABLE C403.2.10 FBC ENERGY.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved