Plan Review Notes
Plan Review Notes For Permit 22090680
Permit Number 22090680
Review Stop B
Sequence Number 3
Notes
Date Text
2023-01-19 12:35:37FOUNDATION FOR A NEW HOTEL/APARTMENT BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 2ND REVIEW NO CHANGES
  
 CORRECTIONS NEEDED -
 REVIEWED FOR FOUNDATION PERMIT ONLY
  
 1) GEOTECHNICAL REPORT NEEDS TO SHOW AS DIGITALLY
 SIGNED IN ADOBE READER - SIGNED AND SEALED DRAWINGS IN
 PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED
 TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).
  
  
  
 FYI - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER
 SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS,
 THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT
 FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER
 PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION
 DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE
 HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE
 FOUNDATION OR OTHER PARTS OF A
 BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN
 RISK WITH THE BUILDING OPERATION AND
 WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved