Date |
Text |
2022-12-12 12:23:19 | JONATHAN BROOKS JR. |
| BUILDING PLANS EXAMINER |
| WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| PHONE (561) 805-6656 |
| EMAIL: [email protected] |
| |
| 1ST REVIEW: FBC 2020 7TH EDITION |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| |
| 1. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| APPROVALS/NOA'S FOR THE PROPOSED FLAT ROOF SYSTEM TO BE |
| USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND |
| INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| NOTE: ROOF SYSTEM MUST BE FOR TEAR OFF. EXPOSURE |
| CATEGORY D AREA; SIGNED AND SEAL ENHANCE NAILING |
| CALCULATIONS MAY BE RREQUIRED. |
| 2. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA |
| 17-0322.03 HAS EXPIRED AND IS NO LONGER VALID. PLEASE |
| PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| APPROVALS/NOA???S FOR THE PROPOSED ROOFING TILE |
| ADHESIVE TO BE USED. INCLUDE COVER PAGE, EVALUATION |
| REPORTS AND INSTALLATION INSTRUCTIONS FOR SYSTEM USED. |
| ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| 3. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), |
| MEAN ROOF HEIGHT(S). FLAT/LOW SLOPE ROOFS MUST SHOW |
| POSITIVE DRAINAGE. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |