2022-10-27 12:46:53 | PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) SUBMIT COPIES OF THE ACTUAL TEST REPORTS FOR THE |
| FLOORING SOUND INSULATION INCLUDING FLAME SPREAD AND |
| SMOKE DEVELOPED FOR THE APPLICABLE CONSTRUCTION |
| CONDITIONS. |
| |
| FBC 603.1 FLAME SPREAD - ASTM E 84-09 |
| |
| FBC 1207.2 AIR-BORNE SOUND. ASTM E 90-04 |
| WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES |
| SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM |
| PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION |
| CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) |
| FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM |
| E 90. |
| |
| FBC 1207.3 STRUCTURE-BORNE SOUND. ASTM E 492-09 |
| FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR |
| BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA |
| WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION |
| CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD |
| TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492. |
| |
| 2) THE VALUE FOR THE WORK STATED ON THE APPLICATION |
| APPEARS TO BE LOW. PLEASE SUBMIT AN ITEMIZED COST |
| BREAKDOWN FOR ALL OF THE PROPOSED WORK. BUILDING PERMIT |
| VALUATION. FOR PERMITTING PURPOSES, VALUATION OF FBC |
| 109.3 BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT |
| VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, |
| MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, |
| ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| |
| |
| |