2022-09-22 14:47:33 | NEW CONCESSION AND RESTROOM BUILDINGS |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - |
| |
| 1) PLEASE SHOW THE WALL FINISHES SURROUNDING THE |
| MOP/SERVICE SINK TO COMPLY WITH FBC 1210.2.2 WALLS AND |
| PARTITIONS. |
| WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) OF SERVICE |
| SINKS, URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH, |
| HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS |
| THAN 4 FEET (1219 MM) ABOVE THE FLOOR - (DRYWALL IS NOT |
| CONSIDERED A HARD SURFACE) |
| |
| 2) PLEASE SHOW THE ATTIC ACCESS LOCATION AND SIZE PER |
| FBC 1209.2 |
| |
| 3) PLEASE SHOW THE ATTIC VENTILATION PER FBC 1203.2 |
| |
| 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS, EXTERIOR |
| DOORS, ROOFING SYSTEMS - ALL PRODUCT APPROVALS NEED TO |
| BE REVIEWED AND MARKED APPROVED BY THE BUILDING |
| DESIGNER OF RECORD - FBC WPB 107.3.4 |
| |
| 5) PLEASE PROVIDE SIGNED AND SEALED DETAILS FROM AN |
| ARCHITECT OR ENGINEER FOR THE IRON SECURITY GATES |
| ATTACHED TO THE RESTROOM BUILDING - WHICH ARE SUBJECT |
| TO WIND LOADS PER FBC 1609 - OR PROVIDE PRODUCT |
| APPROVALS AS NOTED IN COMMENT 4. |
| |
| 6) PLEASE SHOW THE BUILDING CONSTRUCTION TYPE PER FBC |
| CHAPTER 6 |
| |
| 7) PLEASE PROVIDE SIGNED AND SEALED DETAILS FROM AN |
| ARCHITECT OR ENGINEER FOR THE ALUMINUM CANOPIES - WHICH |
| ARE SUBJECT TO WIND LOADS PER FBC 1609 - OR PROVIDE |
| PRODUCT APPROVALS AS NOTED IN COMMENT 4. |
| |
| 8) PLEASE SHOW ON THE DRAWINGS THE WALL AND CEILING |
| INSULATION IF ANY PER THE ENERGY CALCULATIONS. |
| |
| 9) PLEASE PROVIDE A COPY OF THE SOILS REPORT |
| (GEOTECHNICAL REPORT) AS NOTED ON DRAWING S-3. |
| |
| 10) ACCESSIBLE RESTROOM = PLEASE SHOW THE DOOR |
| MANEUVERING CLEARANCE FOR THE SECURITY GATE TO EXIT THE |
| RESTROOM - FBC A 404.2.4 |
| |
| 11) ACCESSIBLE RESTROOM = PLEASE SHOW THE TOILET SEAT |
| COVER DISPENSER ABOVE THE GRAB BAR TO COMPLY WITH THE |
| REQUIRED CLEARANCE FBC A 609.3 THE SPACE BETWEEN THE |
| GRAB BAR AND PROJECTING OBJECTS ABOVE SHALL BE 12 |
| INCHES (305 MM) MINIMUM. |
| |
| 12) REST ROOMS = PLEASE SHOW THE STALL DIMENSIONS AND |
| THE GRAB BAR DIMENSIONS FOR THE REQUIRED AMBULATORY |
| ACCESSIBLE COMPARTMENT - PER FBC A 604.8.2 -- FBC A |
| 213.3.1TOILET COMPARTMENTS. |
| WHERE TOILET COMPARTMENTS ARE PROVIDED, AT LEAST ONE |
| TOILET COMPARTMENT SHALL COMPLY WITH 604.8.1. IN |
| ADDITION TO THE COMPARTMENT REQUIRED TO COMPLY WITH |
| 604.8.1, AT LEAST ONE COMPARTMENT SHALL COMPLY WITH |
| 604.8.2 WHERE SIX OR MORE TOILET COMPARTMENTS ARE |
| PROVIDED, OR WHERE THE COMBINATION OF URINALS AND WATER |
| CLOSETS TOTALS SIX OR MORE FIXTURES. |
| |
| 13) A SEPARATE PERMIT IS REQUIRED FOR THE EXISTING |
| BUILDING DEMOLITION. |
| |
| 14) ITEMS SUCH AS ALUMINUM CANOPY DETAILS, ROOFING |
| SYSTEMS, WINDOW AND DOOR PRODUCT APPROVALS MAY BE |
| DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON |
| THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED |
| SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| BUILDING OFFICIAL. |
| |