Date |
Text |
2022-08-29 12:01:11 | PLEASE CALL OUT MIN. 3 FT. SETBACK FROM EDGE OF |
| PROPOSED DRIVEWAY TO PROPERTY LINE. SHOW ANY WATER |
| METERS, SANITARY CLEANOUTS, STORM INLETS ETC. IN |
| VICINITY OF PROPOSED DRIVEWAY. DO NOT CONSTRUCT |
| DRIVEWAY ON TOP OF WATER METERS, SANITARY CLEANOUTS, |
| STORMWATER INLETS ETC. |
| |
| CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB |
| CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE |
| BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), |
| OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR |
| EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD |
| DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG |
| /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS |
| |
| UPDATE SURVEY WITH REQUESTED INFORMATION AND RESUBMIT |
| WITH A COPY OF THE APPLICABLE STANDARD DETAIL FOR |
| DRIVEWAYS. |
| |
| THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT ONLY IF |
| PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE |
| DRIVEWAY. THE AGREEMENT SHALL SHOW PROPERTY ADDRESS, |
| PCN NUMBER, PLAT BOOK AND PAGE NUMBERS AND MUST THEN BE |
| RECORDED BY APPLICANT AT PALM BEACH COUNTY COURTHOUSE - |
| RECORDING DEPT. 4.25. A RECORDED COPY OF THIS DOCUMENT |
| SHOULD THEN BE FAXED TO (561) 494-1116. ATTENTION: |
| DRIVEWAY REVIEWER, AND ALSO UPLOADED WITH RESUBMITTAL |
| OF DEVELOPMENT SERVICES APPLICATION FOR DRIVEWAY. |
| DOCUMENT NEEDS TO BE RECORDED PRIOR TO FINAL SIGN OFF. |
| |
| FOR A PDF COPY OF THE PAVER DRIVEWAY AGREEMENT GO TO: |
| HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3298/637 |
| 523652570000000 |
| |
| |
| THANKS, |
| RICK ROSSANO, SENIOR PROJECT COORDINATOR, |
| CITY OF WPB ENGINEERING SERVICES DEPARTMENT |
| DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: |
| (561) 246-9525 |
| EMAIL: [email protected] |
| HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- |
| STANDARDS-DETAILS |
| CENTRAL OPERATIONS CENTER (DISPATCH): |
| 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC |
| UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 |