2022-09-01 13:03:58 | PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) PROVIDE A PROPERTY SURVEY AND A SITE PLAN THAT SHOWS |
| THE LOCATION OF THE PROPOSED STAIRS. FBC 107.2.1 |
| |
| 2) SPECIFY THE OCCUPANCY TYPE AND THE OCCUPANT LOAD |
| THAT THE STAIRS WILL BE SERVICING. FBC 302.1, 1004.1 & |
| 1027.1 |
| |
| 3) SPECIFY THE STRUCTURAL DESIGN LOADS FOR THE STAIRS |
| ON THE PLANS. FBC 1603.1 GENERAL. CONSTRUCTION |
| DOCUMENTS SHALL SHOW THE SIZE, SECTION AND RELATIVE |
| LOCATIONS OF STRUCTURAL MEMBERS WITH FLOOR LEVELS, |
| COLUMN CENTERS AND OFFSETS DIMENSIONED. THE DESIGN |
| LOADS AND OTHER INFORMATION PERTINENT TO THE STRUCTURAL |
| DESIGN REQUIRED BY SECTIONS 1603.1.1 THROUGH 1603.1.9 |
| SHALL BE INDICATED ON THE CONSTRUCTION DOCUMENTS. FBC |
| 1603.1.4 WIND DESIGN DATA, FBC 1603.1.1 FLOOR LIVE LOAD |
| (FBC 1607) |
| |
| 4) SPECIFY THE FOOTER SIZE AND REINFORCING FOR THE |
| STEEL POSTS THAT ARE SUPPORTING THE STAIRS. FBC 1808.1 |
| |
| 5) SPECIFY HOW THE STEEL POSTS WILL BE ATTACHED TO THE |
| FOUNDATION. FBC 1604.8 |
| |
| 5) SPECIFY THE LOCATIONS AND AND REQUIRED EMBED DEPTH |
| OF THE 1/2" WEDGE THAT WILL ANCHOR THE LEFT SIDE OF THE |
| STAIRS TO THE WALL OF THE BUILDING. FBC 1603.1 |
| |
| 6) SUBMIT SHOP DRAWINGS OF THE STAIRS WITH WELD |
| DETAILS. FBC 2204.1 |
| |
| 7) PROVIDE AN ELEVATION OF THE BUILDING THAT SHOWS THE |
| STAIRS ATTACHED. SHOW ALL DOOR AND WINDOW OPENINGS. FBC |
| 107.2.1 & 1027.6 |
| |
| 8) SHOW COMPLIANCE WITH FBC ACCESSIBILITY SECTION 505 |
| FOR REQUIRED HANDRAILS. |
| |
| 9) SHOW THAT THE STAIR GUARDS COMPLY WITH FBC 1015.3 |
| FOR HEIGHT (42") AND FBC 1015.4 FOR OPENING LIMITATIONS |
| (LESS THAN 4"). |
| |
| 10) SPECIFY THE REQUIRED LOADS FOR THE HANDRAILS AND |
| GUARDS. FBC 1607.8 |
| |
| 11) THE NAME AND THE SIGNATURE OF THE PERSON |
| RESPONSIBLE FOR THE DESIGN IS REQUIRED ON THE DRAWINGS. |
| FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. |
| ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| THE PERSON RESPONSIBLE FOR THE DESIGN. |
| |
| 12) A THOROUGH AND COMPLETE PLAN REVIEW CANNOT BE |
| COMPLETED AT THIS TIME DUE TO LACK OF INFORMATION ON |
| THE SUBMITTED PLANS. ADDITIONAL PLAN REVIEW COMMENTS |
| MAY BE GENERATED WHEN MORE INFORMATION IS PROVIDED. |
| |
| 13) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| |
| |