2022-11-30 16:02:25CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 22070634 4065 N HAVERHILL RD # B1
  
 2ND REVIEW
 PLUMBING COMMENTS: DENIED
  
 NEW COMMENT; GENERAL: THE SUBMITTED PLUMBING PLAN
 (SINGLE PAGE) IS MIXING EXISTING WITH NEW AND IS VERY
 UNCLEAR REGARDING THE MATTER; ADDITIONALLY, IT IS
 CRAMMING ALL THE INFORMATION FOR GAS AND PLUMBING ONTO
 A SINGLE PAGE. PER WPB FBC 107.2.1, TO PROVIDE CLARITY,
 PLEASE PROVIDE A SEPARATE EXISTING/DEMO PLAN, A
 SEPARATE PROPOSED PLAN. BR PREPARED TO ADD PAGES AS
 APPLICABLE TO PROVIDE ADEQUATE INFORMATION.
  
 1. SIGNATURES APPROVED
  
 2.THE BACKFLOW PERMIT AND INTERCEPTOR PERMITS ARE
 REQUIRED TO BE SUBMITTED PRIOR TO ISSUANCE OF THE
 PRIMARY PERMIT (AS APPLICABLE). YOU CAN SUBMIT AN
 APPLICATION 'TBD' (TO BE DETERMINED) IF YOU DO NOT HAVE
 A CONTRACTOR SELECTED BY EMAILING A COMPLETED PERMIT
 APPLICATION TO [email protected] . YOU WILL
 RECEIVE INSTRUCTIONS TO PAY FEES AND UPLOAD PLANS. YOU
 MAY UPLOAD PLANS AND PAY FEES AT A FUTURE DATE, BUT THE
 APPLICATION IS REQUIRED AT THIS TIME. WE RECOMMEND THAT
 YOU PAY FEES AND UPLOAD PLANS AT THE SAME TIME.
  
 3. PARTIALLY COMPLIED: GREASE INTERCEPTOR: A SEPARATE
 PERMIT IS REQUIRED HOWEVER A REVIEW OF THE SYSTEM UNDER
 THE MAIN PERMIT IS ALSO REQUIRED.
 ***E) ALL SUBMITTALS SHALL BE APPROVED AND STAMP BY THE
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE- WPB FBC
 107.2.1, 107.3.4.
 NEW COMMENT: CALCULATIONS FOR GREASE INTERCEPTOR SHALL
 NOT INCLUDE HAND SINKS. FBC PL 1003.2. IF MOP SINK AND
 PREP SINK DISCHARGE TO GREASY WASTE THEN THEY SHALL BE
 INCLUDED IN CALCULATIONS.
 NEW COMMENT: GREASE TRAP SUBMITTAL DOES NOT INDICATE
 THE SIZE OF THE INTERCEPTOR TO BE USED. PLEASE INDICATE
 THE MODEL NUMBER/SIZE ON THE SUBMITTAL. THE
 INLET/OUTLET PORTS SHALL BE SIZED TO ACCOMMODATE IN
 SIZE OF THE INLET AND OUTLET SIZE OF THE PIPING. FBC PL
 704.2
 NEW COMMENT: RISER DIAGRAM SHOWS A 2-WAY CLEANOUT
 UPSTREAM AND DOWNSTREAM OF THE INTERCEPTOR BUT THEY
 APPEAR TO BE A CROSS TEE IN THE DIAGRAM. PLEASE SHOW A
 2WAY CO TEE WITH A SMOOTH HORIZONTAL BOTTOM. A
 DEPRESSED/TRAPPED BOTTOM IS NOT ALLOWED
  
 7.SECOND REQUEST: PLAN SHEET S-3: PER FBC ACC 609.4,
 GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION,
 33 INCHES MINIMUM AND 36 INCHES MAXIMUM ABOVE THE
 FINISH FLOOR MEASURED TO THE TOP (NOT THE CENTER) OF
 THE GRIPPING SURFACE
 REVISED DETAIL ON S-3 SHOWS 32 INCHES MAXIMUM TO
 CENTER; NOTES ON S-1 CORRECT THE SITUATION. PLEASE
 CORRECT OR ELIMINATE INCORRECT DIMENSIONS ON DETAIL.
  
 9. & 10. SECOND REQUEST: PER WPB FBC 107.2.1, PROVIDE
 PLUMBING FLOOR PLAN SHOWING SANITARY AND WATER
 DISTRIBUTION. RECONCILE CONFIGURATION WITH THE RISER
 DIAGRAMS (I.E., ADDED BATHROOM IS BACK TO BACK ON FLOOR
 PLAN, RISER DIAGRAM SHOWS SIDE BY SIDE). ALL
 ITEMS/COMPONENTS, INCLUDING BUT NOT LIMITED TO WATER
 HEATER, RECIRCULATING PUMP, ETC., EXISTING AND NEW
 SHALL BE INCLUDED ON PLAN VIEW AND RISER DIAGRAMS.
 EXISTING SHALL BE NOTED AS SUCH. INCLUDE SERVICE ENTRY
 TO UNIT. SIZE ALL PIPING SEGMENTS.
 TO BE CLEAR, PLAN VIEW AND RISER DIAGRAM SHOULD REFLECT
 EACH OTHER
 ALL FIXTURES AND EQUIPMENT SHOWN ON THE PLANS REQUIRING
 CONNECTIONS SHALL BE SHOWN CONNECTED TO THE PIPING
 SYSTEMS
 NEW COMMENT: PROVIDE VTR FOR GREASY WASTE SYSTEM. FBC
 PL 904.1, 904.1.1, 904.1.2
  
 11. SECOND REQUEST: PER FBC PL 608.1, SPECIFY AND
 PROVIDE BACKFLOW PREVENTER FOR ICE MACHINES.
 TO BE CLEAR; A BFP IS REQUIRED FOR EACH ICE MACHINE.
 INDICATE THE SAME ON THE PLANS
  
 13. SECOND REQUEST: PER WPB FBC 107.2.1, PROVIDE
 INSULATION SPECIFICATION SPEC FOR HOT WATER INSULATION
 COMPLY WITH FBC EC C404.4 (A-E) AND TABLE C403.2.10.
 THE FOLLOWING PIPING SHALL BE INSULATED TO LEVELS SHOWN
 IN TABLE C403.2.10:
 ***A) RECIRCULATING SYSTEM PIPING, INCLUDING THE SUPPLY
 AND RETURN PIPING OF A CIRCULATING TANK TYPE WATER
 HEATER.
  
  
 16.PARTIALLY COMPLIED: EXISTING WATER HEATER: PER WPB
 FBC 107.2.1, PROVIDE THE FOLLOWING;
 ***B) PROVIDE TEMPERATURE OF HOT WATER TO DISTRIBUTION
 ***E) WATER HEATER/RECIRC PUMP DETAIL SCHEDULE &
 DETAIL- PROVIDE DETAIL INTEGRATING WATER HEATER AND
 RECIRC PUMP; SHOW ALL VALVES AND APPURTENANCES.
 ***G) PLEASE CLARIFY MIXING VALVE AT WATER HEATER ON
 HOT WATER OUTLET.
 TO BE CLEAR, PROVIDE DETAIL FOR MIXING VALVE AND
 CONFORM TO ASSE 1017. FBC PL 607.1.1, 613.1
  
 21. SECOND REQUEST: PER WPB FBC 107.2.1, PROVIDE DETAIL
 FOR STEAM TABLE AND INDIRECT WASTE SHOWING COMPLIANCE
 WITH FBC PL 802.1.1.
  
 22. PER 802.1, FLOOR DRAINS LOCATED WITHIN WALK-IN
 REFRIGERATORS OR FREEZERS IN FOOD SERVICE AND FOOD
 ESTABLISHMENTS SHALL BE INDIRECTLY CONNECTED TO THE
 SANITARY DRAINAGE SYSTEM BY MEANS OF AN AIR GAP.
 TO BE CLEAR, PROVIDE DETAIL
 NEW COMMENT: DOES THIS DRAIN CONTRIBUTE FAT, OIL OR
 GREASE (FOG) TO THE SYSTEM. IF SO, DISCHARGE THE
 RECEPTOR TO THE GREASY WASTE AND ADD TO THE
 CALCULATIONS FOR THE INTERCEPTOR. IF NOT, DISCHARGE TO
 SANITARY
  
 23. HOT WATER DISTRIBUTION IS CORRECTLY NOTED TO BE
 RECIRCULATING, BUT THERE IS NO LOOP. PER WPB FBC
 107.2.1, CLARIFY.
 TO BE CLEAR, SHOW COMPLETED LOOP
 NEW COMMENT: HOT WATER IS REQUIRED AT THE #7 MOP SINK
 AS WELL AS THE #8 PREP SINK WHICH IS NOT SHOWN IN THE
 WATER DISTRIBUTION RISER DIAGRAM. FBC PL 607.1
  
 31. SECOND REQUEST: ICE MAKER(S), HAND SINKS, STEAM
 TABLE AND SERVICE SINKS SHALL NOT DISCHARGE TO THE
 GREASY WASTE PER FBC PL 1003.2.
 TO BE CLEAR, #11 STEAM TABLE, #2 ICE MAKER DRAIN, #4
 ICE MAKER DRAIN SHALL NOT DISCHARGE TO GREASE
 INTERCEPTOR. FBC PL 1003.2. IT IS DETERMINED THE #7 MOP
 SINK (SERVICE SINK) MAY DISCHARGE TO THE GREASE
 INTERCEPTOR.
 NEW COMMENT: PROVIDE WASTE, HOT AND COLD WATER FOR #8
 PREP SINK PER FBC PL 301.3, 602.2, 607.1; IS IT A FOOD
 PREP SINK? IF SO, COMPLY WITH FBC PL 802.1.1 OR 801.1.7
 AS APPLICABLE. IF THE WASTE CONTRIBUTES FAT, OIL OR
 GREASE (FOG) WASTE RECEPTOR SHALL CONNECT TO GREASY
 WASTE. IF NOT, CONNECT RECEPTOR TO SANITARY.
  
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER PX928
 PLUMBING INSPECTOR BN2148
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved