Date |
Text |
2023-06-28 17:11:18 | PROVISO: |
| THE PERMIT NEEDS TO BE REVISED BEFORE INSPECTIONS. ALL |
| FLOOR PLANS SHOWING ON ELECTRICAL, PLUMBING, |
| FOUNDATION, AND ALL DRAWINGS ARE REQUIRED TO BE UPDATED |
| AND MATCH APPROVED FLOOR PLANS OUTLINED IN THE SITE |
| PLAN APPROVAL LETTER FOR FSPR CASE NO. 22-24. |
| |
| IN ADDITION, THE FOLLOWING CONDITIONS WILL ALSO NEED TO |
| BE ADDRESSED: |
| |
| 1. PRIOR ISSUANCE OF THE TEMPORARY CERTIFICATE OF |
| OCCUPANCY, A REVISED TPS LETTER WILL NEED TO BE |
| SUBMITTED TO THE PLANNING DIVISION. |
| |
| 2. PRIOR TO ISSUANCE OF THE TEMPORARY CERTIFICATE OF |
| OCCUPANCY, AN AERIAL EASEMENT AGREEMENT WILL BE |
| FINALIZED. |
| |
| 3. PRIOR TO ISSUANCE OF THEIR BUILDING PERMIT: THIS |
| DEVELOPMENT IS SUBJECT TO THE PUBLIC ART REQUIREMENT, |
| HOWEVER THE 1% IS MINIMAL. THEY DO NEED TO COMPLETE AN |
| ART ASSESSMENT APPLICATION, SELECT OPTION#2 |
| CONTRIBUTION INTO THE ART FUND, WHICH MUST BE |
| COMPLETED, AND PAID BEFORE, OR AT TIME OF BUILDING |
| PERMIT FEES. |
| |
| 4. THE GARBAGE CONTAINERS SHALL BE FRONT-LOAD TYPE TO |
| BE COMPATIBLE WITH THE CITY???S SANITATION COLLECTION |
| VEHICLES. |
| |
| 5. ALL POOL DISCHARGE MIST BE DECHLORINATED PRIOR TO |
| ENTERING THE CITY???S STORMWATER DRAINAGE SYSTEM. NO |
| POOL DISCHARGE MAY ENTER THE CITY???S SANITARY SYSTEM. |
| |
| 6. NEW AND EXISTING ROOF DRAIN LEADERS ARE TO BE |
| DIRECTLY CONNECTED TO THE DRAINAGE SYSTEM IN THE ALLEY. |
| NO OPEN CONNECTIONS TO THE ALLEY SURFACE. |
| |
| 7. ANY WORK WITHIN THE PUBLIC RIGHT OF WAY (ALLEY, |
| CLEMATIS ST.) WILL REQUIRE AN ENGINEERING PERMIT. |
| |
| 8. A RIGHT-OF-WAY (ROW) PERMIT IS REQUIRED. |
| |
| 9. THE APPLICANT WILL COORDINATE WITH THE PARKING |
| DEPARTMENT AND WILL COPY THE ENGINEERING DEPARTMENT IN |
| THE CORRESPONDENCE, WITH THE RESPECT TO THE IMPACTED |
| PARKING STALLS WITHIN THE 300 BLOCK. |
| |
| 10. THE DEVELOPER SHALL BE RESPONSIBLE FOR ANY |
| INFRASTRUCTURE IMPROVEMENTS REQUIRED TO SERVE THE |
| PROJECT. |
| |
| 11. ANY REQUIRED EASEMENTS (I.E. DRAINAGE, UTILITIES, |
| PUBLIC ACCESS, OUTFALL, ETC.) SHALL BE PROVIDED VIA |
| PLAT OR SEPARATE LEGAL INSTRUMENT. |
| |
| 12. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| SERVICES DEPARTMENT, PLANNING DIVISION. |
| |
| 13. UPON APPLICATION FOR A BUILDING PERMIT, THE |
| DEVELOPER SHALL SUBMIT TO THE CITY A CONSTRUCTION |
| PARKING MANAGEMENT PLAN PER THE PROVISIONS OF CHAPTER |
| 86 ??? ARTICLE IV ??? DIVISION 1 ??? SEC. 86-245 OF THE |
| CITY???S CODE OF ORDINANCES. |
| |
| 14. ALL CONDITIONS OF APPROVAL INCLUDED IN THE DAC |
| FINAL ORDER FOR FSPR 22-24 APPROVED BY THE COMMITTEE ON |
| MAY 10, 2023, ARE PART OF THIS SITE PLAN APPROVAL. |
| |
| |