2022-08-22 11:15:53 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) THERE IS AN INDICATION THAT THIS IS REVISION OF |
| MASTER PERMIT # 21061851, WHICH DOESN'T SHOW |
| CANOPY/AWNING WORK. |
| |
| PER NFPA 1 |
| 1.14 PLAN REVIEW. |
| 1.14.5 WHEN REQUIRED BY THE AHJ, REVISED CONSTRUCTION |
| DOCUMENTS OR SHOP DRAWINGS SHALL BE PREPARED AND |
| SUBMITTED FOR REVIEW AND APPROVAL TO ILLUSTRATE |
| CORRECTIONS OR MODIFICATIONS NECESSITATED BY FIELD |
| CONDITIONS OR OTHER REVISIONS TO APPROVED PLANS. |
| |
| PLEASE SUBMIT PLANS THAT HAVE INDICATIONS WHERE THE |
| REVISIONS OR MODIFICATIONS, FROM THE ORIGINAL PLANS, |
| ARE LOCATED. |
| |
| |
| 1A) THERE IS NO SITE PLAN INDICATING THE LOCATIONS OF |
| EACH PROPOSED CANOPY/AWNING. |
| |
| 1.7.12 PLANS AND SPECIFICATIONS. |
| |
| 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH |
| APPLICABLE CODES AND STANDARDS. |
| |
| 1.7.12.2 PLANS SHALL BE SUBMITTED TO THE AHJ PRIOR TO |
| CONSTRUCTION UNLESS OTHERWISE PERMITTED BY 1.7.11.4. |
| |
| PLEASE PROVIDE A DETAILED SITE PLAN. |
| |
| |
| 1B) THERE IS NO INDICATIONS OF THE DIMENSIONS OF EACH |
| CANOPY. |
| |
| 1.7.12 PLANS AND SPECIFICATIONS. |
| |
| 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH |
| APPLICABLE CODES AND STANDARDS. |
| |
| 1.7.12.2 PLANS SHALL BE SUBMITTED TO THE AHJ PRIOR TO |
| CONSTRUCTION UNLESS OTHERWISE PERMITTED BY 1.7.11.4. |
| |
| 1.7.12.6 PLANS SHALL BE SUBMITTED TO THE AHJ PRIOR TO |
| THE ALTERATION OF THE MEANS OF EGRESS OR FIRE |
| PROTECTION SYSTEMS OF ANY EXISTING BUILDING. |
| |
| PLEASE PROVIDE DETAILED DIMENSIONS OF EACH |
| CANOPY/AWNING. |
| |
| 1C) THERE IS NO INDICATION OF FLAME RETARDANT |
| CERTIFICATION. |
| |
| PER NFPA 101 |
| |
| 11.9.1.6 FLAME PROPAGATION PERFORMANCE. |
| 11.9.1.6.1 ALL MEMBRANE STRUCTURE FABRIC SHALL MEET THE |
| FLAME PROPAGA TION PERFORMANCE CRITERIA CONTAINED IN |
| TEST METHOD 2 OF NFPA 701. |
| 11.9.1.6.2 ONE OF THE FOLLOWING SHALL SERVE AS EVIDENCE |
| THAT THE FABRIC |
| MATERIALS HAVE THE REQUIRED FLAME PROPAGATION |
| PERFORMANCE: |
| (1) THE AUTHORITY HAVING JURISDICTION SHALL REQUIRE A |
| CERTIFICATE OR OTHER |
| EVIDENCE OF ACCEPTANCE BY AN ORGANIZATION ACCEPTABLE TO |
| THE AUTHOR ITY HAVING JURISDICTION. |
| (2) THE AUTHORITY HAVING JURISDICTION SHALL REQUIRE A |
| REPORT OF TESTS |
| MADE BY OTHER INSPECTION AUTHORITIES OR ORGANIZATIONS |
| ACCEPTABLE |
| TO THE AUTHORITY HAVING JURISDICTION. |
| |
| PLEASE PROVIDE. |
| |
| 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |