2023-03-07 17:06:56 | RESIDENTIAL(R3) ADDITION/ALTERATION FIFTH BUILDING |
| REVIEW COMMENTS |
| CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. |
| PERMIT #22050916 |
| 372 FOREST HILL BLVD |
| |
| NOTE: |
| ARCHITECT TO PAY $3775.00 FOR FOUR TIMES THE PLAN |
| REVIEW PER FLORIDA STATUTE 553.80(2)(B). |
| |
| ARCHITECTS-ENGINEERS |
| FLORIDA STATUTE 553.80(2)(B): |
| ARCHITECTS WITH RESPECT TO EVALUATION OF DESIGN |
| PROFESSIONALS DOCUMENTS, IF A LOCAL GOVERNMENT FINDS IT |
| NECESSARY, IN ORDER TO ENFORCE COMPLIANCE WITH THE |
| FLORIDA BUILDING CODE AND ISSUE A PERMIT, TO REJECT |
| DESIGN DOCUMENTS REQUIRED BY THE CODE THREE OR MORE |
| TIMES FOR FAILURE TO CORRECT A CODE VIOLATION |
| SPECIFICALLY AND CONTINUOUSLY NOTED IN EACH REJECTION, |
| INCLUDING, BUT NOT LIMITED TO, EGRESS, FIRE PROTECTION, |
| STRUCTURAL STABILITY, ENERGY, ACCESSIBILITY, LIGHTING, |
| VENTILATION, ELECTRICAL, MECHANICAL, PLUMBING, AND GAS |
| SYSTEMS, OR OTHER REQUIREMENTS IDENTIFIED BY RULE OF |
| THE FLORIDA BUILDING COMMISSION ADOPTED PURSUANT TO |
| CHAPTER 120, THE LOCAL GOVERNMENT SHALL IMPOSE, EACH |
| TIME AFTER THE THIRD SUCH REVIEW THE PLANS ARE REJECTED |
| FOR THAT CODE VIOLATION, A FEE OF FOUR TIMES THE AMOUNT |
| OF THE PROPORTION OF THE PERMIT FEE ATTRIBUTED TO PLANS |
| REVIEW |
| |
| PREVIOUS COMMENT: |
| 9-RESPONSE LETTER STATES "EXISTING ROOF IS VENTED, |
| PLEASE SEE SHEET A1-4.4 FOR VENT LOCATION, CALCULATION |
| AND SIZES. ALSO, PLEASE SEE MEPS ENERGY CALC SHEET |
| CORRECTIONS. ICYNENE INSULATION REPORT WILL BE PROVIDED |
| PRIOR TO INSTALLATION. NEW FLAT ROOF IS UNVENTED |
| BECAUSE IT DOES NOT HAVE AN ATTIC." |
| |
| ARCHITECT AND MEP ENGINEER NEED TO COORDINATE PLANS AND |
| ENERGY CALCULATIONS TO AVOID MORE CONFLICTS AND DELAYS |
| AND AVOID THE PLAN REVIEW FEE PER FLORIDA STATUTE |
| 553.80(2)(B). |
| CROSS SECTIONS AND DETAILS SHOWN ON REVISED SHEET |
| A1-4.2 SHOW ICYNENE R-30 INSULATION ON THE ROOF THERMAL |
| ENVELOPE (BELOW ROOF SHEATHING) FOR EXISTING PITCHED |
| ROOF. ICYNENE R-30 INSULATION IS TYPICALLY USED WHEN |
| THE DESIGN PROFESSIONAL IS DESIGNING AN UNVENTED ATTIC. |
| IF SPECIFYING UNVENTED ATTIC THEN CLARIFY WHY |
| SPECIFYING ROOF ATTIC VENTILATION ON PROPOSED ROOF PLAN |
| ON SHEET A1-4.4?. SEE SEC. R806 FBC-RESIDENTIAL FOR |
| VENTED AND UNVENTED ATTICS INFORMATION AND REVISE PLANS |
| AS REQUIRED. |
| FLAT ROOF IS OK AS AN UNVENTED ATTIC WITH THE ICYNENE |
| R-30 INSULATION. |
| |
| ENERGY CALCULATIONS NEED TO BE REVISED TO REFLECT THE |
| CORRECT INFORMATION. FIRST, NEED TO COORDINATE WITH |
| ARCHITECT IF EXISTING ROOF IS GOING TO BE VENTED OR NOT |
| AND NEED TO ADD THE UNVENTED FLAT ROOF AREAS. |
| |
| RESPONSE: |
| (A)RESPONSE LETTER SAYS "ALL ROOFS WILL BE VENTED. |
| ICYNENE HAS BEEN REMOVED AS INSULATION TYPE". |
| EXISTING-SECTION 02/A1-4.2 STILL SHOWS ICYNENE R-30 |
| INSULATION. STILL NO CLEAR IF DESIGNING VENTED OR |
| UNVENTED ATTIC. ALSO, CLEARLY SPECIFY TYPE OF R-30 |
| INSULATION (BATT INSULATION???).SEC. 107.2.1 CITY |
| AMENDMENTS. |
| NOTE: ALSO. LOCATION OF INSULATION IS NOT CLEAR. |
| SECTION SHOWS INSULATION BELOW THE ROOF RAFTER. THIS |
| LOCATION DOESN'T COMPLY WITH EITHER A VENTED OR |
| UNVENTED ATTIC. VENTED ATTIC HAVE THE INSULATION ABOVE |
| THE CEILING. UNVENTED ATTICS HAVE THE INSULATION JUST |
| BELOW THE ROOF SHEATHING. REVISE ALL SECTIONS AS |
| REQUIRED. SEE SEC. R806 FBC-RESIDENTIAL FOR OPTIONS FOR |
| VENTED OR UNVENTED ATTICS. COORDINATE WITH ITEM #12 |
| BELOW REGARDING ATTIC VENTILATION AND REVISE ALL |
| SECTIONS AS REQUIRED. |
| |
| (B)PROPOSED-SECTION 01/A1-4.2 SHOWS ICYNENE R-30 |
| INSULATION IN THE LEFT HAND SIDE OF THE FLAT ROOF AND |
| R-30 INSULATION ON THE RIGHT HAND SIDE OF THE SAME FLAT |
| ROOF. STILL NO CLEAR IF DESIGNING VENTED OR UNVENTED |
| ATTIC. |
| NEW ROOF DETAIL 04/A1-4.2 FOR THE FLAT ROOF SPECIFIES |
| R-30 INSULATION BUT IT DOESN'T SHOW ANY VENTILATION. |
| ALSO, PROPOSED-ROOF PLAN ON SHEET A1-4.1 |
| STATES "NOTE: NO VENTILATION" ON FRONT AND REAR FLAT |
| ROOFS. REVISE ALL PLANS AS REQUIRED TO MATCH TO AVOID |
| MORE CONFLICTS/DELAYS. SEC. 107.2.1 CITY AMENDMENTS. |
| NOTE: CLEARLY SPECIFY TYPE OF R-30 INSULATION. IF USING |
| R-30 BATT INSULATION, THEN ROOF CROSS VENTILATION IS |
| REQUIRED. ALSO, R-30 INSULATION DOESN'T FIT ON 2X6 ROOF |
| RAFTERS SPECIFIED ON FOR FRONT FLAT ROOF. |
| |
| (C)PROPOSED-SECTION 01/A1-4.2 SHOWS ICYNENE R-30 |
| INSULATION ON THE PITCHED ROOF ON THE LEFT HAND SIDE. |
| NOTE: ALSO. LOCATION OF INSULATION IS NOT CLEAR. |
| SECTION SHOWS INSULATION BELOW THE ROOF RAFTER. THIS |
| LOCATION DOESN'T COMPLY WITH EITHER A VENTED OR |
| UNVENTED ATTIC. VENTED ATTIC HAVE THE INSULATION ABOVE |
| THE CEILING. UNVENTED ATTICS HAVE THE INSULATION JUST |
| BELOW THE ROOF SHEATHING. REVISE ALL SECTIONS AS |
| REQUIRED. SEE SEC. R806 FBC-RESIDENTIAL FOR OPTIONS FOR |
| VENTED OR UNVENTED ATTICS. COORDINATE WITH ITEM #12 |
| BELOW REGARDING ATTIC VENTILATION AND REVISE ALL |
| SECTIONS AS REQUIRED. |
| SEC. 107.2.1 CITY AMENDMENTS. |
| |
| (D)ROOF VENTS SHOWN ON PROPOSED-ROOF PLAN ON SHEET |
| A1-4.4 AND PROPOSED-ROOF PLAN ON SHEET A1-4.1 DON'T |
| MATCH. NOTE: PROVIDE ONLY ONE PROPOSED ROOF PLAN TO |
| AVOID MORE CONFLICTS/DELAYS. |
| SEC. 107.2.1 CITY AMENDMENTS. |
| |
| PREVIOUS COMMENT: |
| 12- RESPONSE LETTER STATES: "PLEASE SEE REVISED SHEET |
| A1-4.1 INDICATING ROOF PITCH". |
| THIS IS INCORRECT. THE REQUEST WAS TO SPECIFY ROOF |
| VENTILATION NOT ROOF PITCH. READ SEC. R806 |
| FBC-RESIDENTIAL AND PROVIDE THE REQUIRED INFORMATION |
| FOR CROSS VENTILATION FOR ALL ROOF AREAS. (SEE NOTE ON |
| ITEM #12 ABOVE. ALSO, COORDINATE WITH ITEM #9 ABOVE). |
| |
| RESPONSE: |
| SEE RESPONSE COMMENTS ON ITEM #9 ABOVE AND COORDINATE |
| AS REQUIRED TO AVOID MORE CONFLICTS/DELAYS. |
| ROOF CROSS VENTILATION SEC. R806 FBC-RESIDENTIAL. |
| SPECIFY VENTS SIZE AND LOCATION FOR FLAT AND PITCHED |
| ROOFS. |
| NOTE: THERE ARE FLAT AND PITCHED ROOFS. IF DESIGNING |
| UNVENTED ATTICS, THEN SPECIFY HOW COMPLYING WITH SEC. |
| R806.5 FBC-RESIDENTIAL. |
| REVISE ROOF VENTILATION CALCULATIONS TO INCLUDE THE |
| FLAT ROOFS IF THEY ARE GOING TO BE DESIGNED AS VENTED |
| ROOFS. |
| |
| 13- DEFERRED SUBMITTAL: PRODUCT APPROVALS (NOTE: |
| PROVIDE COMPLETE INFORMATION FOR REVIEW AFTER PERMIT |
| ISSUANCE BUT PRIOR TO INSTALLATION TO AVOID |
| CONFLICTS/DELAYS. ALL PRODUCT APPROVALS NEED TO BE |
| APPROVED IN WRITING BY DESIGNER OF RECORD PRIOR TO |
| SUBMITTAL: |
| A)FLAT ROOF. AND, CLEARLY MARK WHICH APPROVED ASSEMBLY |
| IS GOING TO BE INSTALLED TO VERIFY COMPLIANCE WITH THE |
| DESIGN PRESSURES OF SEC. R301.1 FBC-RESIDENTIAL. |
| NOTE: IF THE SELECTED ASSEMBLY DOESN'T MEET THE DESIGN |
| PRESSURES FOR ALL ROOF ZONES, THEN SIGNED AND SEALED |
| RAS 117 CALCULATIONS ARE REQUIRED. |
| B)ENTRY DOOR AS SHOWN ON PLANS. |
| C)HORIZONTAL SLIDING WINDOWS. |
| D)FIXED WINDOWS. |
| E) REAR SWING DOOR. |
| F)SLIDING GLASS DOOR. |
| G) NEW GABLE END VENT SHOWN ON EXTERIOR WEST ELEVATION. |
| |
| 14- ADDITIONAL DEFERRED SUBMITTAL: IF USING ICYNENE |
| INSULATION, THEN PROVIDE ICC EVALUATION REPORT FOR THE |
| ICYNENE R-30 INSULATION TO VERIFY COMPLIANCE WITH SEC. |
| R316 FBC-RESIDENTIAL. |
| NOTE: ARCHITECT TO REVIEW AND APPROVE THE REPORT IN |
| WRITING PRIOR TO SUBMITTAL TO THIS OFFICE. |
| |
| PREVIOUS COMMENT: |
| 17- REVISE ENERGY CALCULATIONS SUBMITTED: |
| B)CEILING INFORMATION NEED TO BE COORDINATED WITH ITEM |
| #9 ABOVE. PLANS NEED TO SHOW THE THERMAL ENVELOPE AND |
| SPECIFY IF DESIGNING VENTED OR UNVENTED ATTICS. NOTE: |
| THERE ARE SOME FLAT ROOFS IN THIS PROJECT THAT NEED TO |
| BE CONSIDERED ALSO. SEC. R101.5.1.1.2 FBC- ENERGY |
| CONSERVATION. |
| |
| RESPONSE: |
| THIS CANNOT BE REVIEWED UNTIL ARCHITECTURAL PLANS ARE |
| CORRECTED TO CLEARLY IDENTIFY VENTED OR UNVENTED ATTIC |
| DESIGN FOR FLAT AND PITCHED ROOFS. |
| |
| ARCHITECT TO PROVIDE A RESPONSE LETTER LISTING THE |
| ORIGINAL REVIEW COMMENT WITH A DESCRIPTION OF WHERE AND |
| HOW THE COMMENT WAS ADDRESSED TO AVOID MORE |
| CONFLICTS/DELAYS. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| QUESTIONS REGARDING THESE COMMENTS, |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |
| [email protected] |
| |
| |