Date |
Text |
2022-06-13 11:30:01 | JONATHAN BROOKS JR. |
| BUILDING PLANS EXAMINER |
| WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| PHONE (561) 805-6656 |
| EMAIL: [email protected] |
| |
| 1ST REVIEW: FBC 2020 7TH EDITION |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| CITY HALL, OR EMAIL [email protected]. |
| |
| 1. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| APPROVAL FL2533-R27 COVERS MULTIPLE ROOF SYSTEMS FOR |
| WOOD DECKS; SYSTEM NO. W-1 THRU W-105. PLEASE SELECT |
| SYSTEM NO. THAT MEETS OR EXCEEDS EXPOSURE CATEGORY C |
| ZONE 3 DESIGN PRESSURE REQUIREMENTS OR PROVIDE SIGNED |
| AND SEALED ENGINEERED NAILING CALCULATION FOR ZONE 3. |
| ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| 2. FBC B 107.2.1 SUBMITTED PRODUCT APPROVAL FL5259-R35 |
| COVERS MULTIPLE PRODUCT TYPES; ROOF COVER OPTIONS; |
| ALLOWABLE UNDERLAYMENT/TILE-ADHESIVE COMBINATIONS, |
| ALLOWABLE SUBSTRATES & ATTACHMENT LIMITATIONS. SELECT |
| PRODUCT TYPES, ALLOWABLE UNDERLAYMENT/TILE-ADHESIVE |
| COMBINATIONS & ATTACHMENT LIMITATIONS TO BE USED. ALL |
| APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| 3. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| APPROVALS/NOA'S FOR THE PROPOSED METAL ROOF SYSTEM TO |
| BE USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND |
| INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. SECOND |
| REQUEST. |
| 4. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| DIAGRAM/SKETCH AND SHOW THE AREAS TO RECEIVE NEW |
| ROOFING CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF |
| SLOPE(S), MEAN ROOF HEIGHT(S). SECOND REQUEST. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| |