Date |
Text |
2022-08-11 10:00:53 | PLAN REVIEW BUILDING |
| |
| CHRISTOPHER S. THROOP, C.B.O., CFM |
| PLANS EXAMINER II PX3169/SFP306 |
| BU1635 BN4338 |
| ASFPM CFM US-21-11935 |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| NFPA 70 2017 EDITION NEC 2017 |
| |
| 2ND REVIEW |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| NOTICE: |
| PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| SATISFACTORILY ARE MARKED AS CORRECTED OR REMOVED. |
| PREVIOUS COMMENTS THAT HAVE NOT BEEN ADDRESSED |
| SATISFACTORILY MAY HAVE ADDITIONAL COMMENTS IN |
| PARENTHESES. ANY NEW COMMENT WILL BE LISTED AFTER |
| PREVIOUS COMMENTS. |
| |
| |
| 1. VALUE |
| CITY OF WPB CHPT.1 VALUE |
| 109.3 BUILDING PERMIT VALUATIONS. |
| |
| 1A. THE STATED VALUE APPEARS LOW FOR THE PROPOSED SCOPE |
| OF WORK. |
| 1B. THE PERMIT VALUATION AND PERMIT FEE MUST BE |
| COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED |
| CONTRACTOR WOULD PROVIDE. THIS INCLUDES ALL LABOR, |
| MATERIALS AND RENTALS OF EQUIPMENT TO PERFORM THE SCOPE |
| OF WORK. |
| 1C. YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY |
| THE OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT |
| RENTAL TO VERIFY VALUE. |
| FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| BUILDING OFFICIAL. |
| |
| (INCLUDE LABOR IN THE VALUE) |
| |
| 2. CORRECTED. |
| |
| NEW COMMENTS: |
| |
| 3. WHAT IS THE PURPOSE OF THE BEARING WALL PLAN? IS |
| THIS A REPAIR DETAIL OR NEW CONSTRUCTION? |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| 4. PROVIDE A SITE PLAN. IDENTIFY LOCATION OF WORK ON |
| BEARING WALL. |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| |
| |