Date |
Text |
2022-12-19 16:00:27 | INSUFFICIENT |
| |
| 1) THE SURVEY SHOWS THE POWER POLE THAT WILL SUPPLY THE |
| UNDERGROUND POWER ON PRIVATE PROPERTY AND REQUIRING A |
| CROSSING OF THE PRIVATE PROPERTY TO REACH THE HANDHOLE |
| AT STA 0+00. IN ORDER FOR THE UNDERGROUND ELECTRIC TO |
| CROSS PRIVATE PROPERTY, IT MUST BE LOCATED WITHIN A |
| GENERAL UTILITY EASEMENT. THE SURVEY DOES NOT SHOW AN |
| EASEMENT AT THIS LOCATION. IF THERE IS AN EASEMENT, IT |
| MUST BE SHOWN ON THE SURVEY AND THE UNDERGROUND |
| ELECTRIC MUST CLEARLY BE SHOWN IN THE EASEMENT. IF NO |
| EASEMENT IS PRESENT, THE UNDERGROUND ELECTRIC MUST COME |
| FROM AN ALTERNATIVE LOCATION. |
| |
| 2) THE UPDATED SURVEY SHOWS THE FULL LENGTH OF THE |
| POWER ROUTE, TO INCLUDE THE HANDHOLES AND BORE PITS, IS |
| LOCATED WITHIN THE RIGHT-OF-WAY, HOWEVER, THE LOCATION |
| OF THE GAS LINE AT STA 0+00 IS NOT SHOWN AT THE SAME |
| LOCATION ON THE SURVEY AND SHEET E101. BASED ON THE |
| SURVEY, THERE IS A DIRECT CONFLICT WITH THE HANDHOLE |
| AND ITS EXCAVATION AND THE GAS LINE. YOU NEED TO |
| PROVIDE VERIFICATION FROM FPU THAT THEY DO NOT OBJECT |
| TO THE PROPOSED INSTALLATION LOCATION OF YOUR |
| FACILITES. |
| |
| 3) THE LAT/LON FOR THE POLE ON THE SURVEY AND SITE PLAN |
| IS SHOWN AS THE HANDHOLE LOCATION ON THE POWER ROUTE |
| PLAN. PLEASE ENSURE THAT ALL PLANS ARE LABELED |
| CORRECTLY. |
| |
| 4) THE NEWLY UPLOADED SHEET E201 DOES NOT SHOW A POLE |
| THAT MEETS THE CITY'S STEALTH REQUIREMENTS. THE |
| ORIGINAL SUBMITTAL SHOWED A COMPLIANT POLE DESIGN. |
| SHEETS A201 AND A502 SHOW A COMPLIANT POLE. |
| |
| 5) THE POLE HEIGHT AND STYLE (SUBJECT TO THE CORRECTION |
| OF SHEET E201) MEET CITY REQUIREMENTS. THE POLE COLOR |
| AT THIS LOCATION IS CORRECTLY SHOWN AS RAL/RAYCAP 7042 |
| TRAFFIC GREY A. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| [email protected] |
| |
| |