Plan Review Notes For Permit 22040742 |
Permit Number |
22040742 |
|
Review Stop |
ENG |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2022-06-02 13:10:25 | PASSED WITH PROVISOS: | | | | DO NOT CONSTRUCT DRIVEWAY ON TOP OF WATER METERS, | | SANITARY CLEANOUTS, STORMWATER INLETS ETC. | | | | CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB | | CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE | | BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), | | OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR | | EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD | | DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG | | /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS | | | | CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF | | CONSTRUCTION. | | | | MAINTAIN MIN. 3 FT. CLEARANCE FROM WIDENED DRIVEWAY | | APRON TO EXISTING TREES. | | | | COMPLY WITH ANY ZONING COMMENTS. | | | | THANKS, | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, CITY OF WPB | | ENGINEERING SERVICES DEPARTMENT | | (561) 494-1098, FAX: (561) 494-1116 EMAIL: | | [email protected] | | CENTRAL OPERATIONS CENTER (DISPATCH): | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | |
|