2023-04-06 11:54:29 | ** FAILED ** |
| |
| PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| APPLICABLE: |
| |
| 1.) THERE IS CONFUSION WITH THE INFORMATION PROVIDED IN |
| THE COMPLETED BUILDING PERMIT APPLICATION FORM. THE |
| SCOPE OF WORK SPECIFIES "INSTALL MONUMENT SIGN @ |
| ELECTRICAL CHANGING STATION WITH SOLAR CANOPY," |
| HOWEVER, THE PLANS AND DESCRIPTION (I.E. INFORMATION |
| IMPLIES THAT THIS IS A FENCE PERMIT) DO NOT MATCH. |
| PLEASE REVISE AND ADDRESS FOR CONSISTENCY. |
| |
| 2.) CLEARLY SHOW IN THE SITE PLAN THE ACTUAL LOCATION |
| OF THE PROPOSED FENCE LINE. PLEASE NOTE THAT THE |
| PROPOSED FENCE MUST MATCH THE APPROVED SITE PLAN. |
| |
| 3.) THE HEIGHT OF THE PROPOSED FENCE DOES NOT MATCH |
| WHAT HAD BEEN APPROVED BY DMP FSPR 21-02. |
| |
| 4.) AS SPECIFIED IN AN EMAIL SENT TO JOSHUA BALDRIDGE, |
| CONSTRUCTION MANGER AT NEXTERA ENERGY RESOURCES, ON |
| 5/25/2022, INFORMATION REQUIRED FOR THE FENCE PERMIT |
| WAS SPECIFIED IN THE EMAIL, INCLUDING (BUILDING PERMIT |
| PLAN PACKET DOES NOT COMPLY): |
| |
| 4.1) DETAIL OF THE PROPOSED FENCE MUST BE PROVIDED IN |
| THE PLANS AND MUST SPECIFY THAT IT WILL BE VINYL COATED |
| CLF (IN ADDITION TO PROVIDING THE SPECIFICATIONS FOR |
| FENCE AND MESH IN THE PERMIT). |
| |
| 4.2) THE FENCE HEIGHT (AND ALL RELEVANT INFORMATION) |
| MUST BE PROVIDED IN THE DETAIL AND MUST ALSO MATCH THE |
| APPROVED PLANS. |
| |
| |
| |
| NOTES: |
| |
| * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. |
| |
| * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE |
| QUESTIONS. |
| |
| * REFERENCE: DMP FSPR 21-02 (FPL EV FAST CHARGING |
| STATION). |
| |
| * MASTER PERMIT #21110989 (CONSTRUCTION FOR EV CHARGING |
| STATION). |
| |