Date |
Text |
2022-03-15 11:37:31 | 03/15/22 1ST POOL PLUMBING REVIEW**DENIED** WITH |
| COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. WOULD YOU PLEASE SUBMIT TOTAL DYNAMIC HEAD |
| CALCULATIONS FOR THE MAXIMUM SYSTEM FLOW? THE PUMP'S |
| MAXIMUM FLOW FROM ITS PUMP CURVE IS NO LONGER ALLOWED |
| TO BE USED IN DETERMINING THE MAXIMUM SYSTEM FLOW RATE |
| PER ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE |
| 2013 EDITION ADDRESSES THE FLOW RATE IN GALLONS PER |
| MINUTE (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW |
| RATE DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF |
| THE SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE |
| TDH CALCULATIONS MUST INCLUDE ALL THE SYSTEM |
| COMPONENTS, INCLUDING SUCTION AND RETURN PIPING, |
| FITTINGS, VALVES, HEAT PUMP, SALT CHLORINATOR, AND |
| FILTER. ALL SYSTEM COMPONENTS EXCEPT THE PUMP. |
| |
| 2. WOULD YOU PLEASE SUBMIT THE POOL PUMP CURVE AND |
| IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2015 SECS. |
| 4.4.9, 4.4.9.1. |
| |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON |
| REQUEST. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |