2022-07-26 11:34:54 | NEW TOWNHOUSE |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - |
| |
| 1) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT |
| APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED |
| ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR |
| ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER PRESSURE |
| (PER DRAWING S-7) THAN THE MAXIMUM SHOWN ON THE PRODUCT |
| APPROVAL (-52.5) - SEE NOTE NUMBER 9 ON THE PRODUCT |
| APPROVAL. |
| |
| 2) ROOFING SYSTEM PRODUCT APPROVALS MAY BE DEFERRED |
| SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| CONSTRUCTION DOCUMENTS - FBC WPB 107.3.4.1 DEFERRED |
| SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| BUILDING OFFICIAL. |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |