Date |
Text |
2022-04-07 11:41:14 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| 1) SHEET FP 24 ROOF B - THERE IS AN INDICATION OF A |
| HOSE VALVE CONNECTION THAT APPEARS TO BE OBSTRUCTED BY |
| A BOXED WALL AREA. |
| |
| PER NFPA 14 |
| |
| 7.3 LOCATIONS OF HOSE CONNECTIONS. |
| 7.3.1* GENERAL. |
| 7.3.1.1 HOSE CONNECTIONS AND HOSE STATIONS SHALL BE |
| UNOBSTRUCTED AND SHALL BE LOCATED NOT LESS THAN 3 FT |
| (0.9 M) OR MORE |
| THAN 5 FT (1.5 M) ABOVE THE FLOOR |
| |
| THE HVC NEEDS TO BE RELOCATED AT LEAST TO THE OTHER |
| CORNER OF THE BOXED AREA OR OUT IN FRONT OF THE BOXED |
| WALL AREA SO THAT IT IS MORE VISIBLE AND ACCESSIBLE TO |
| FD OPERATIONS. |
| |
| ADDITIONALLY, A FD HOSE CONNECTION SIGN WILL BE |
| REQUIRED SO THAT IT CAN BE SEEN FROM ABOVE THE AREA A/C |
| EQUIPMENT. |
| |
| PLEASE CORRECT AND PROVIDE A NOTE FOR THE SIGN ON THE |
| PLAN SHEET. |
| |
| |
| 2) ANY FIRE LINE UNDERGROUND RELATED TO THIS PERMIT'S |
| PROPOSED WORK SHALL BE DONE UNDER SEPARATE PERMIT AND |
| SHOP DRAWINGS. |
| |
| PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE A NOTE |
| OF ACKNOWLDGMENT ON SHEET FP 3. |
| |
| |
| |
| |
| 3) SHEET FP 1 - WITHIN THE FIRE SPRINKLER HEAD LEGEND |
| THERE ARE NO INDICATIONS OF THE TOTAL NUMBER OF EACH |
| HEAD TYPE. |
| |
| THE TOTAL OF THOSE HEADS SHOULD MATCH THE TOTAL FOR THE |
| JOB. |
| |
| PLEASE REVIEW AND CORRECT. |
| |
| |
| |
| 4) SHEET FP 4 L01A - PLEASE REVIEW THE TOTALS FOR THE |
| TOTAL THIS SHEET FOR HEADS TY-FRB HSW (5) , TY-FRB HSW |
| (3) AS THESE NUMBERS CANNOT BE VERIFIED WITHIN THE |
| FLOOR PLAN. |
| |
| ADDITIONALLY, PLEASE REVIEW THE SIMILAR LEGENDS ON |
| OTHER SHEETS FOR THESE HEADS AS THEY ALSO CANNOT BE |
| VERIFIED. |
| |
| |
| |
| 5) SHEET FP 25 - IT COULD NOT BE EASILY IDENTIFIED DUE |
| TO THE PLAN SHEET WITH COLORS COMES OUT VERY BLURRY, |
| BUT ARE THERE INDICATION OF PRV'S WHERE REQUIRED ON THE |
| APPLICABLE FLOORS AND FD HOSE CONNECTIONS? |
| |
| PLEASE REVIEW AND PROVIDE A NOTE ON THE PLAN SHEET |
| EITHER IT WILL BE PROVIDED OR THAT IT WILL NOT WITH |
| DETAILS. |
| |
| |
| 5A) SHEET FP 25 - THERE IS NO INDICATION OF THE ROOF |
| FDHC THAT IS INDICATED ON SHEET FP 24 ROOF B. |
| |
| PLEASE REVIEW AND CORRECT OR PROVIDE A NOTE OF |
| EXPLANATION/CLARIFICATION. |
| |
| |
| |
| 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |