Date |
Text |
2022-03-02 10:42:32 | JONATHAN BROOKS JR. |
| BUILDING PLANS EXAMINER |
| WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| PHONE (561) 805-6656 |
| EMAIL: [email protected] |
| |
| 1ST REVIEW: FBC 2020 7TH EDITION |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| CITY HALL, OR EMAIL [email protected]. |
| |
| 1. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| APPROVALS/NOA'S FOR THE PROPOSED DOME ROOF RECOVER |
| SYSTEM TO BE USED. SUBMITTED PRODUCT APPROVAL |
| FL2533-R26 TABLE 7A SYSTEM TYPE A-1 R-52 IS FOR |
| STRUCTURAL CONCRETE DECKS. ALL APPLICABLE DETAILS AND |
| ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| SITE-SPECIFIC ENGINEERING |
| 2. FBC EB 706.3(1) PROVIDE A SIGNED AND SEALED MOISTURE |
| REPORT PREPARED BY A FLORIDA REGISTERED DESIGN |
| PROFESSIONAL. |
| 3. PROVIDE FIELD UPLIFT TESTING IN ACCORDANCE WITH |
| TESTING APPLICATION STANDARD TAS 124 AS REQUIRED BY |
| NOTE #12 & LIMITATIONS 5.6.3 OF PRODUCT APPROVAL |
| FL2633-R26 |
| 4. FBC B 107.2.1 RECOVERING MUST SHOW COMPLIANCE WITH |
| 706.3 OF THE 2020 FBC-EXISTING BUILDING. |
| 5. FBC B 1609 PROVIDE A COMPLETE SET OF SIGNED AND |
| SEALED ENGINEERED DESIGN PRESSURE CALCULATIONS BY A |
| FLORIDA REGISTERED PROFESSIONAL ENGINEER, REGISTERED |
| ARCHITECT, OR REGISTERED ROOF CONSULTANT. |
| 6. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), |
| MEAN ROOF HEIGHT(S). FLAT/LOW SLOPE ROOFS MUST SHOW |
| POSITIVE DRAINAGE. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| |