2022-04-25 12:50:07APARTMENT RENOVATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS AND DOORS.
 ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED
 APPROVED BY THE REMODEL DESIGNER OF RECORD. FBC 107.3.4
  
 2) PRODUCT APPROVAL PROVIDED FOR THE SINGLE HUNG
 WINDOWS NEEDS TO BE REVIEWED AND MARKED APPROVED BY THE
 ARCHITECT OF RECORD FBC 107.3.4
  
 3) DRAWINGS SHOW AN ACCESSIBLE UNIT - PLEASE SHOW WHICH
 CODE IS INTENDED FBC FHA OR FBC ACCESSIBILITY
  
 4) DRAWINGS DO NOT SHOW THE TYPE OF FLOORING - IF
 FLOORING IS PART OF THIS SUBMITTAL - PLEASE SHOW ON THE
 DRAWINGS AND PROVIDE THE FOLLOWING FOR THE 2ND FLOOR
 UNITS.
 THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90..
 PROVIDE A COPY OF THE TEST REPORT. (A DROP CEILING
 SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING ASSEMBLY
 DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED DROP
 CEILING DESCRIPTION)
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. PROVIDE A COPY OF THE TEST REPORT. (A DROP
 CEILING SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING
 ASSEMBLY DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED
 DROP CEILING DESCRIPTION)
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 YOU CAN EMAIL ME THE PROPOSED TEST REPORTS TO VERIFY
 THAT THEY ARE TEST REPORTS BEFORE RESUBMITTING TO
 PROJECTDOX ( [email protected] )
  
 5) WINDOW, DOOR PRODUCT APPROVALS AND FLOORING
 ACOUSTICAL TEST REPORTS MAY BE DEFERRED SUBMITTALS BY
 LISTING ITEMS TO BE DEFERRED ON THE CONSTRUCTION
 DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. FOR THE
 PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE
 DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT
 SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE
 TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
  
  
  
  