Plan Review Notes
Plan Review Notes For Permit 22020521
Permit Number 22020521
Review Stop B
Sequence Number 2
Notes
Date Text
2022-04-26 17:02:12PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC 7TH EDITION (2020) & CITY OF W.P.B.
 CHAPTER 1 AMENDMENTS
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
 300 BANYAN BLVD.
 PERMIT #22020521
 170 MPH, EXPOSURE "D"
 FLOOD ZONE "X"
 HIGH-RISE BLDG. PER FBC 403 (12 STORIES, 152'-0" TO TOP
 OF OCCUPIED LEVEL)
 CONSTRUCTION TYPE: IA (REDUCED TO IB FOR FIRE
 RESISTANCE RATING OF BUILDING MATERIALS PER FBC
 403.2.1.1)
 PROPOSED OCCUPANCY TYPE: (MIXED USE) B, S-2, A-3
 BLDG. AND GARAGE ARE FULLY SPRINKLERED
 GARAGE IS ENCLOSED
  
 DENIED BY BUILDING
  
 THIS REVIEW IS FOR THE FOUNDATION AND THE BUILDING
 SUPER STRUCTURE. THE FIRST REVIEW WAS FOR THE
 FOUNDATION ONLY PER REQUEST. ADDITIONAL ITEMS WILL BE
 REQUIRED FOR THIS REVIEW. THE PLANS FOR THE COMPLETE
 BUILDING HAVE NOT BEEN SUBMITTED AT THIS TIME. PLEASE
 ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE SITE PLANS ARE MISSING DIMENSIONS, SUCH AS THE
 DISTANCES TO THE PROPERTY LINES. PROVIDE A SITE PLAN
 WITH DIMENSIONS.
  
 2) THE FLOOR PLANS ARE MISSING DIMENSIONS. PROVIDE
 DIMENSIONED FLOOR PLANS. THI IS NEEDED TO CHECK SUCH
 THINGS AS FIRE LOBBY SIZE PER FBC 3007.6, SEPARATION OF
 EXIT ACCESS STAIRWAYS FBC 403.5.1 & 1007.1, ETC.
  
 3) THE DISTANCE TO THE PROPERTY LINE AT THE WEST
 ELEVATION APPEARS TO BE RATHER TIGHT. PROVIDE
 CALCULATIONS TO SHOWN THAT THE PERCENTAGES OF ALLOWABLE
 OPENINGS PER STORY ON THE WEST WALLS COMPLY WITH FBC
 705.8.1 & TABLE 705.8.
  
 4) PROVIDE A LIFE SAFETY PLAN. FBC CHAPTER 10
 THE LIFE SAFETY PLANS NEED TO SHOW THE FOLLOWING:
 A) NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1
 B) CUMULATIVE OCCUPANT LOADS FBC 1004.1.1
 C) EXIT SEPARATION DISTANCE FBC 1015.2.1
 D) COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3
 E) EXIT ACCESS TRAVEL DISTANCE FBC 1016.3
 F) CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC
 1008.1.1
 G) CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED AND
 MEANS OF EGRESS FACTOR FBC1005.3.2
 H) DISTRIBUTION OF EGRESS CAPACITY FBC1005.5
  
 5) PLEASE CLARIFY IF THE ATTACHED GARAGE IS DESIGNED TO
 BE ENCLOSED OR OPEN. IF IT IS AN OPEN GARAGE PROVIDE
 CALCULATIONS TO SHOW THAT IT COMPLIES WITH FBC 406.5.2.
  
 6) SHOW COMPLIANCE. FBC 3002.4 REQUIRES ANY BUILDING
 THAT IS MORE THAN THREE STORIES HIGH OR IN WHICH THE
 VERTICAL DISTANCE BETWEEN THE BOTTOM TERMINAL LANDING
 AND THE TOP TERMINAL LANDING EXCEEDS 25 FEET TO BE
 CONSTRUCTED TO CONTAIN AT LEAST ONE PASSENGER ELEVATOR
 THAT IS OPERATIONAL FOR BUILDING OCCUPANTS AND FIRE
 DEPARTMENT ACCESS TO ALL FLOORS. THE ELEVATOR CAR SHALL
 BE OF A SIZE AND ARRANGEMENT TO ACCOMMODATE AN
 AMBULANCE STRETCHER 24 INCHES BY 76 INCHES WITH NOT
 LESS THAN 5-INCH RADIUS CORNERS, IN THE HORIZONTAL,
 OPEN POSITION AND SHALL BE IDENTIFIED BY THE
 INTERNATIONAL SYMBOL FOR EMERGENCY MEDICAL SERVICES
 (STAR OF LIFE).
  
 7) SHOW THAT THE FIRE SERVICE ELEVATOR LOBBY COMPLIES
 WITH FBC 3007.6.4 LOBBY SIZE. REGARDLESS OF THE NUMBER
 OF FIRE SERVICE ACCESS ELEVATORS SERVED BY THE SAME
 ELEVATOR LOBBY, THE ENCLOSED FIRE SERVICE ACCESS
 ELEVATOR LOBBY SHALL BE NOT LESS THAN 150 SQUARE FEET
 (14 M2) IN AN AREA WITH A DIMENSION OF NOT LESS THAN 8
 FEET (2440 MM). SEE SHEET A6.1.2 (PG. 157) AND OTHER
 SHEETS.
  
 8) SHOW COMPLIANCE. 403.6.1 FIRE SERVICE ACCESS
 ELEVATOR. IN BUILDINGS WITH AN OCCUPIED FLOOR MORE THAN
 120 FEET (36 576 MM), MEASURED FROM THE ELEVATION OF
 STREET-LEVEL ACCESS TO THE LEVEL OF THE HIGHEST
 OCCUPIABLE FLOOR, NO FEWER THAN TWO FIRE SERVICE ACCESS
 ELEVATORS SHALL BE PROVIDED IN ACCORDANCE WITH SECTION
 3007. ALL REMAINING ELEVATORS, IF ANY, SHALL BE
 PROVIDED WITH PHASE I AND II EMERGENCY OPERATION. EACH
 FIRE SERVICE ACCESS ELEVATOR SHALL HAVE A CAPACITY OF
 NOT LESS THAN 3,500 POUNDS (1588 KG).
  
 9) PROVIDE A SCHEMATIC DIAGRAM OF THE FIRE SPRINKLERS.
 FBC 107.3.5.1
  
 10) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS
 FOR THOSE PRODUCTS WHICH ARE REGULATED BY FAC
 61G20-3.001 PER FLORIDA STATUTE 553.842 (5) THAT HAVE
 BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER
 OF RECORD. PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH
 FL OR NOA NUMBERS INCLUDING INSTALLATION INSTRUCTIONS
 AND MAXIMUM DESIGN PRESSURES FOR EACH OF THE DIFFERENT
 ROOFING MATERIALS, WINDOW (GLASS TYPES), STRUCTURAL
 MULLIONS, EXTERIOR WALL VENTS AND EXTERIOR DOOR TYPES.
 THESE ITEMS CAN BE DEFERRED IF REQUESTED, HOWEVER, THE
 DOCUMENTS MUST BE SUBMITTED AND APPROVED BY THE
 BUILDING DEPARTMENT BEFORE THEY CAN BE INSTALLED.
  
 11) FBC AMENDMENTS 107.3.4.1 DEFERRED SUBMITTALS. FOR
 THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE
 DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT
 SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE
 TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 12) SHOW COMPLIANCE WITH FBC 2304.12 FOR TERMITE
 PROTECTION.
  
 13) VERIFY THE REQUIRED VERTICAL CLEARANCE OF 98 INCHES
 FOR THE VAN PARKING SPACE, ACCESS AISLE AND VEHICULAR
 ROUTE SERVING IT AS REQUIRED BY FBC ACCESSIBILITY
 SECTION 502.5. THERE HAVE BEEN ISSUES WITH EQUIPMENT OR
 SYSTEMS INSTALLED BELOW THE REQUIRED 98" IN THESE AREAS
 OF PARKING GARAGES. PLEASE PROVIDE NOTES ON THE
 DRAWINGS TO HELP AVOID THIS ISSUE.
  
 14 ) THE VALUATION FOR THIS BUILDING HAS BEEN
 DETERMINED TO BE $43,968,715.77 BASED ON THE CURRENT
 ICC BUILDING VALUATION DATA. THE FOUNDATION AND
 SUPERSTRUCTURE PERMIT VALUATION WILL BE 80 PERCENT OF
 THAT TOTAL OR $35,174,972.61. THE REMAINDER WILL BE
 USED FOR THE VALUATION OF THE INTERIOR BUILD-OUT OF THE
 BUILDING. THE FBC 109.3 BUILDING PERMIT VALUATION. FOR
 PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS
 SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 15) SEPARATE PERMITS, REVIEWS AND FEES ARE REQUIRED FOR
 SOME ITEMS THAT MAY HAVE BEEN INCLUDED IN THE VALUE FOR
 THIS PROJECT. ITEMS SUCH AS FIRE ALARM, FIRE SPRINKLER,
 LOW VOLTAGE, LANDSCAPING, IRRIGATION AND ALL ITEMS
 OTHER THAN BUILDING, MECHANICAL, ELECTRIC AND PLUMBING.
 WHEN APPLYING FOR THE PERMIT TO COMPLETE THE BUILDING,
 PROVIDE A COST BREAKDOWN SO THAT WE CAN DEDUCT THESE
 ITEMS FROM THE PERMIT VALUE SO THAT YOU WILL NOT BE
 CHARGED TWICE FOR THE SAME ITEM.
  
 16) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM.
  
 ****PROVISOS****
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
 A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO
 INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH
 PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND
 ENGINEERING (IF APPLICABLE).
  
 COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY
 DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING
 DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION.
  
 DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE
 FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS
 SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF
 RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR
 PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS,
 STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS
 REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW
 AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION.
  
 COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.0.5)
  
 COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY
 DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING
 DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION.
 CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S0.0.5
 PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS OPTIONS,
 INDICATE OPTION PROPOSED, ESPECIALLY IF NOT ALL OPTIONS
 COMPLY WITH MINIMUM DESIGN PRESSURES.
  
 SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE
 REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 FIRE ALARM
 FIRE SPRINKLER
 LOW VOLTAGE
 ACCESS
 LANDSCAPING
 IRRIGATION
 PARKING LOT
 SWIMMING POOLS
 ALL OTHER ITEMS OTHER THAN BMEP
  
 PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A PDF
 VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL.
  
 AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED PRIOR
 TO C.O.
  
 SHORING/RESHORE ENGINEERING IS REQUIRED TO BE SUBMITTED
 TO THE BUILDING DIVISION FOR REVIEW. THE ENGINEERING IS
 TO BE SUBMITTED, REVIEWED AND ISSUED PRIOR TO CONCRETE
 POUR.
  
 A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS REQUIRED
 TO BE PROVIDED PRIOR TO INSTALLATION.
  
 CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM
 SAT-SUN
  
  
  
  
  
  
  
  
  
  
  
  