2022-02-23 16:29:30 | ****CORRECTIONS**** |
| |
| PLAN |
| REVIEW COMMENTS |
| |
| 4TH REVIEW: FBC SEVENTH EDITION (2020) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| FBC R = FBC RESIDENTIAL |
| |
| BRIGHT BIKE DOCKING STATIONS (MASTER) PLAN REVIEW. |
| 501 EVERNIA ST. |
| STATUS: DENIED |
| |
| BUILDING/STRUCTURAL REVIEW COMMENTS: |
| 1) [NOT ADDRESSED. THIS IS STILL AN ISSUE WHEN THE |
| INSTALLATION IS ON PAVERS OR ASPHALT.] THERE IS A NOTE |
| ON PAGE 2 OF THE CALCULATIONS FOR THE PAVER |
| CALCULATIONS WHICH STATES THE CALCULATIONS ARE FOR THE |
| DECO BIKE DOCK STANDS TO RESIST HURRICANE WIND LOADS |
| AND ALL OTHER ITEMS, BIKES, KIOSK WILL BE REMOVED IN |
| THE EVENT OF A HURRICANE. A STORM PREPARATION PLAN WILL |
| BE REQUIRED WHICH SPECIFIES THE ITEMS THAT WILL BE |
| REMOVED, WHEN THE ITEMS WILL BE REMOVED (AT WHICH TIME |
| PRIOR TO THE WIND EVENT), WHO WILL BE RESPONSIBLE FOR |
| REMOVING THEM (PROVIDE CONTACT INFORMATION) AND WHERE |
| THEY WILL BE STORED. FBC AMENDMENTS 107.2.1 |
| INFORMATIONAL - SEPARATE PERMITS ALONG WITH A |
| SURVEY/SITE PLAN WILL BE REQUIRED FOR EACH LOCATION. |
| FBC AMENDMENTS 107.2.5 |
| |
| 2) IT APPEARS THAT THERE ARE SOME ISSUES WITH THE |
| BRIGHTBIKE SITE PREPARATION LIST. |
| - #8 DOCKS ARE TO BE INSTALLED ON A 4" CONCRETE SLAB. |
| THIS IS AN EXPOSURE D LOCATION. THE ENGINEERING |
| REQUIRES 6" SLABS IN EXPOSURE D. |
| - #9 DOCK ARE TO BE INSTALLED ON A 4" CONCRETE SLAB. |
| THIS IS EXPOSURE D AND WILL REQUIRE A 6" SLAB. |
| |
| 3) NEW COMMENT. THE BUILDING OFFICIAL INFORMED ME THAT |
| THE PERMIT FEES WOULD BE APPLIED TO THE MASTER PERMIT |
| RATHER THAN TO EACH PERMIT IN ORDER TO REDUCE THE |
| AMOUNT THAT WOULD BE CHARGED IF THEY WERE APPLIED |
| SEPARATELY. I DISCUSSED THE STATED VALUE OF $6500.00 |
| FOR ALL 19 OF THE DOCKING STATIONS AND KIOSKS FOR THIS |
| PROJECT WITH THE BUILDING OFFICIAL. THIS EQUATES TO |
| $342.10 FOR EACH STATION. WE DO NOT BELIEVE THAT THIS |
| IS A TRUE VALUE FOR ALL OF THE MATERIALS, LABOR, DESIGN |
| FEES, SITE PREPARATIONS, OVERHEAD AND PROFIT FOR THIS |
| SCOPE OF WORK PER FBC AMENDMENTS 109.3. PROVIDE AN |
| ACCURATE COST FOR THE ENTIRE PROJECT, |
| |
| 4) PLEASE SUBMIT A RESPONSE LETTER STATING HOW EACH |
| REVIEW COMMENT HAS BEEN ADDRESSED. |
| |
| INFO ONLY - THIS WILL BE INSTALLED AT THE FOLLOWING |
| LOCATIONS: |
| |
| STATION 1 - 22010670 |
| STATION 2 - 22010671 |
| STATION 3 - 22010672 |
| STATION 4 - 22010673 |
| STATION 5 - 22010674 |
| STATION 6 - 22010676 |
| STATION 7 - 22010677 |
| STATION 8 - 22010678 |
| STATION 9 - 22010680 |
| STATION 11 - 22010681 |
| STATION 12 - 22010683 |
| STATION 13 - 22010685 |
| STATION 14 - 22010686 |
| STATION 16 - 22010687 |
| STATION 17 - 22010688 |
| STATION 19 - 22010689 |
| |
| |