Plan Review Notes
Plan Review Notes For Permit 22010445
Permit Number 22010445
Review Stop B
Sequence Number 1
Notes
Date Text
2022-01-26 14:52:45****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BRIGHT BIKE DOCKING STATIONS (MASTER) PLAN REVIEW.
 501 EVERNIA ST.
 STATUS: DENIED
  
 BUILDING/STRUCTURAL REVIEW COMMENTS:
 1) THE RATIONAL ANALYSIS FOR DECO BIKE IS NOT DIGITALLY
 SIGNED AND SEALED BY THE ENGINEER. ELECTRONICALLY
 SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT
 OR ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE
 THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER
 VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE
 BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER
 DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE
 ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE
 AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO
 PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE
 ACCEPTABLE. FS 481 & 61G1 OR FS 471 & 61G15
 2) THE WIND LOAD ANALYSIS IS BASED ON ASCE 7-10 AND THE
 PROJECT IS UNDER THE 2020 FBC WHICH REFERENCES ASCE
 7-16. PLEASE UPDATE. FBC CHAPTER 35
 3) THE EXPOSURE CATEGORY SPECIFIED IS C. DUE TO THIS
 BEING A MASTER PLAN, THE LOCATIONS OF ALL DOCKING
 STATIONS NEED TO BE EVALUATED AND THE WORST CASE SHOULD
 BE TO DETERMINE THE WIND LOAD CALCULATIONS. FBC
 1609.4.3
 4) THE CALCULATIONS FOR DECO BIKE LLC USES THE WIND
 DESIGN SPEED OF 165 MPH AND EXPOSURE CATEGORY B.
 BECAUSE THIS WILL BE A MASTER PERMIT, THE LOCATIONS OF
 ALL DOCKING STATIONS NEED TO BE EVALUATED AND THE WORST
 CASE WIND SPEED AND EXPOSURE CATEGORY SHOULD BE TO
 DETERMINE THE WIND LOAD CALCULATIONS. FBC 1609.4.3
 5) THERE IS A NOTE ON PAGE 3 OF THE CALCULATIONS WHICH
 STATES THE CALCULATIONS ARE FOR THE DECO BIKE DOCK
 STANDS TO RESIST HURRICANE WIND LOADS AND ALL OTHER
 ITEMS, BIKES, KIOSK WILL BE REMOVED IN THE EVENT OF A
 HURRICANE. A STORM PREPARATION PLAN WILL BE REQUIRED
 WHICH SPECIFIES THE ITEMS THAT WILL BE REMOVED, WHEN
 THE ITEMS WILL BE REMOVED (AT WHICH TIME PRIOR TO THE
 WIND EVENT), WHO WILL BE RESPONSIBLE FOR REMOVING THEM
 (PROVIDE CONTACT INFORMATION) AND WHERE THEY WILL BE
 STORED. FBC AMENDMENTS 107.2.1
 6) INFORMATIONAL - SEPARATE PERMITS ALONG WITH A
 SURVEY/SITE PLAN WILL BE REQUIRED FOR EACH LOCATION.
 FBC AMENDMENTS 107.2.5
 7) THE PROPOSED ANCHORING METHOD FOR THE EQUIPMENT IS
 TO BE PROVIDED WITH EACH SEPARATE APPLICATION DEPENDING
 ON THE TYPE OF BASE SUBSTRATE AT THAT LOCATION. FBC
 AMENDMENTS 107.2.1
 8) THE DECO BIKE RATIONAL ANALYSIS ENGINEERING IS BASED
 ON A 6? CONCRETE SLAB. MOST OF THE SIDE WALKS AND
 EXISTING SLABS ARE TYPICALLY 4?. MAKE SURE THE
 ENGINEERING MATCHES THE EXISTING CONDITIONS AT THE
 SITE. FBC AMENDMENTS 107.2.1
 9) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH
 OF THE REVIEW COMMENTS HAS BEEN ADDRESSED.
  
 INFO ONLY - THIS WILL BE INSTALLED AT THE FOLLOWING
 LOCATIONS:
  
 STATION 1 - 22010670
 STATION 2 - 22010671
 STATION 3 - 22010672
 STATION 4 - 22010673
 STATION 5 - 22010674
 STATION 6 - 22010676
 STATION 7 - 22010677
 STATION 8 - 22010678
 STATION 9 - 22010680
 STATION 11 - 22010681
 STATION 12 - 22010683
 STATION 13 - 220100685
 STATION 14 - 22010686
 STATION 16 - 22010687
 STATION 17 - 22010688
 STATION 19 - 22010689
  
  