Date |
Text |
2022-02-02 14:55:06 | ** FAILED ** |
| |
| PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE |
| COMMENTS IN WRITING AND/OR ON THE PLANS WHERE |
| APPLICABLE: |
| |
| 1.) SIGNED AND SEALED UPDATED SURVEY OF THE PROPERTY IS |
| REQUIRED. A SURVEY WAS NOT PROVIDED WITH THE PERMIT |
| APPLICATION. [1/20/2022 MODIFIED COMMENT: THE SURVEY |
| SHALL ONLY CONSIST OF THE PARCELS FOR THE OUTDOOR |
| TENNIS COURTS.] |
| |
| 2.) HOW TALL ARE THE POLE FIXTURES? FIXTURE DETAILS |
| REQUIRED. [1/20/2022 REPEAT COMMENT: NO |
| INFORMATION/DETAIL PROVIDED ON THE POLE FIXTURES.] |
| |
| 3.) THE FOLLOWING NOTE SHALL BE PROVIDED IN THE PLANS |
| FOR CONSISTENCY WITH THE ZONING AND LAND DEVELOPMENT |
| REGULATIONS (ZLDRS): ALL OUTDOOR LIGHTING SHALL BE |
| SHIELDED TO REDUCE GLARE AND SHALL BE ARRANGED TO |
| REFLECT LIGHT OR GLARE AWAY FROM ALL ADJACENT |
| RESIDENTIAL DISTRICTS, ADJACENT RESIDENCES, OR PUBLIC |
| THROUGHFARES. [ZLDR S.94-309.A.] [1/20/2022 REPEAT |
| COMMENT: NOTE NOT PROVIDED IN THE REVISED PLANS.] |
| |
| 4.) A PHOTOMETRIC PLAN IS REQUIRED. [1/20/2022 MODIFIED |
| COMMENT: THE PHOTOMETRIC PLAN MUST SHOW THE PHOTOMETRIC |
| SPILLOVER BEYOND THE PROPERTY LINES OF THE PROPERTY. |
| PER SEC. 94-207(D)(8) OF THE ZLDRS, ANY SOURCE OF |
| ILLUMINATION SHALL NOT EXCEED ONE FOOTCANDLE AT OR |
| BEYOND THE BOUNDARIES OF THE PROPERTY. PLEASE SHOW |
| ILLUMINATION SPILLOVER TO DEMONSTRATE COMPLIANCE WITH |
| THE ZONING CODE.] |
| |
| 5.) A 5 FT. WIDE LANDSCAPE BUFFER SHALL BE PROVIDED |
| ALONG THE ENTIRE PERIMETER OF THE PROJECT. THE REVISED |
| PLAN SHOWS THAT PERIMETER LANDSCAPE BUFFER REQUIREMENT |
| IS NOT MET AROUND THE PERIMETER OF THE ON-SITE PARKING |
| AREA. THE INGRESS/EGRESS POINT MAY HAVE TO BE SHIFTED |
| TO ACCOMMODATE THE BUFFER REQUIREMENT. |
| |
| 6.) A SEPARATE LANDSCAPE PERMIT SHALL BE SUBMITTED, |
| REVIEWED AND APPROVED PRIOR TO ZONING SIGN-OFF. THE |
| LANDSCAPE PERMIT MUST BE REVIEWED FOR CONSISTENCY WITH |
| THIS PERMIT. THE APPLICANT/PROJECT TEAM WAS INFORMED |
| THAT A SEPARATE LANDSCAPE PERMIT WAS REQUIRED DURING A |
| ZOOM CALL ON THE 1/11/2022; HOWEVER, THIS HAS YET TO BE |
| ADDRESSED AS THERE IS NO RECORD OF A LANDSCAPE PERMIT |
| IN THE SYSTEM.] |
| |
| 7.) NORTHEAST TERMINAL ISLAND LOCATED WITHIN THE |
| ON-SITE PARKING AREA SHALL BE DIMENSIONED FOR |
| CONSISTENCY WITH THE ZLDRS. |
| |
| 8.) ENGINEERING PLANS SHALL BE SUBMITTED, REVIEWED AND |
| APPROVED BY THE ENGINEERING SERVICES DEPARTMENT PRIOR |
| TO ZONING SIGN-OFF OF THIS PERMIT. APPROVED ENGINEERING |
| PLANS MUST BE CONSISTENT WITH THE SITE PLAN WITH THIS |
| PERMIT APPLICATION. |
| |
| |
| NOTES: |
| |
| * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE |
| QUESTIONS. |
| |
| * ZONE: GC/PROPOSED GREENE SCHOOL CPD. |
| |
| * UNITY OF TITLE REQUIREMENT SATSIFIED - ORB BK 33267 |
| PG 0153 (RECORDED ON 1/31/2022). |
| |