2022-01-05 12:08:07 | JONATHAN BROOKS JR. |
| BUILDING PLANS EXAMINER |
| WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| PHONE (561) 805-6656 |
| EMAIL: [email protected] |
| |
| 1ST REVIEW: FBC 2020 7TH EDITION |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| CITY HALL, OR EMAIL [email protected] AND REQUEST |
| THAT IT BE CONVERTED TO PROJECTDOX. |
| |
| 1. FBC B 107.2.1 SUBMITTED PRODUCT APPROVAL FL5259-R33 |
| HAS BEEN REVISED TO FL5259-R34. PLEASE PROVIDE A |
| COMPLETE SET; IT COVERS MULTIPLE PRODUCT TYPES; ROOF |
| COVER OPTIONS; ALLOWABLE UNDERLAYMENT/TILE-ADHESIVE |
| COMBINATIONS & ALLOWABLE SUBSTRATES. SELECT OPTIONS TO |
| BE USED. ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE |
| CLEARLY IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| DETAILS AND ATTACHMENTS NOT SPECIFICALLY COVERED IN |
| PRODUCT APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| 2. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| APPROVAL FL10497-R8 SELECTED SYSTEM NO. W-104 DO NOT |
| MEET THE EXPOSURE CATEGORY C; ZONE 3 MINIMUM DESIGN |
| PRESSURE REQUIREMENT OF -108.17. PLEASE SELECT SYSTEM |
| NO. THAT MEETS OR EXCEEDS REQUIREMENTS OR PROVIDE |
| SIGNED AND SEALED ENGINEERED NAILING CALCULATION FOR |
| ZONE 3. ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE |
| CLEARLY IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. |
| DETAILS AND ATTACHMENTS NOT SPECIFICALLY COVERED IN |
| PRODUCT APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| 3.FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| DIAGRAM/SKETCH AND SHOW THE AREAS TO RECEIVE NEW |
| ROOFING CLEARLY IDENTIFIED ON DRAWING; INCLUDE FLAT |
| ROOF SLOPE(S). |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| |