Date |
Text |
2022-04-07 08:31:04 | 04/07/22 2ND GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| 1. ON SHEET P101; |
| |
| A. THE ARE TWO DIFFERENT SETS OF SYSTEMS ON THIS PAGE, |
| ONE SHOWS AN LP TANK, AND IT ALSO INDICATES A GAS |
| METER. WOULD YOU PLEASE CLARIFY BY SHOWING THE SYSTEM |
| LP OR GAS PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| B. THERE SEEMS TO BE A NEW LINE FOR THE DRYER AND THE |
| GENERATOR THAT IS NOT SHOWN IN THE ISOMETRIC GAS RISER. |
| WOULD YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE |
| FBC SEC. 107.3.5.3 (12) RESIDENTIAL GAS. |
| |
| C. THERE IS A GAS POOL HEATER, AND IT DOES NOT SHOW ANY |
| GAS LINE TO IT. WOULD YOU PLEASE CORRECT PER THE WPB |
| AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| D. THIS TANK-LESS UNIT CALL FOR A 10.5" WATER COLUMN, |
| AND THE SERVICE METER DISCHARGES IS A 12" WATER COLUMN |
| REQUIRING A REGULATOR FOR THIS UNIT AS PER THE |
| MANUFACTURER'S SPECIFICATION. SUBMIT MANUFACTURER?S |
| SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE |
| APPROVED FOR OUTDOOR INSTALLATION PER THE 2020 FBC RES. |
| SEC. G2421.1 OR 410.1. |
| |
| E. WOULD YOU PLEASE SUBMIT THE MANUFACTURER'S |
| SPECIFICATION SHEETS/INSTALLATION MANUAL FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH 2020 FBC FG SEC. |
| 305.1 OR 2020 FBC RES. SEC. G2408.1. GAS APPLIANCES |
| SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| FOR ALL GAS APPLIANCES/EQUIPMENT SHALL BE ONSITE AT THE |
| TIME OF INSPECTION PER THE 2020 FBC RES. SEC. G2413.2 |
| AND G2404.3 |
| . |
| F. THERE IS A GAS TANKLESS SHOWN ON THE ISOMETRIC BUT |
| NOT SHOWN IN THE FLAT DRAWING. WOULD YOU PLEASE CORRECT |
| PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| G. WOULD YOU PLEASE SHOW ON THE HOUSE PLAN THE LOCATION |
| OF THE TANK-LESS WATER HEATER AND THE LOCATION AND |
| DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN RELATION |
| TO THE WATER HEATER. THE LOCATION OF THE WATER HEATER |
| SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION |
| INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND-DRAWN PER THE |
| WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| H. WOULD YOU PLEASE SUBMIT COMBUSTION AIR CALCULATIONS |
| FOR THE ADDED GAS DRYER APPLIANCES. WHERE DOES THE |
| BUILDING'S MECHANICAL VENTILATION SYSTEM PROVIDE |
| COMBUSTION AIR? THE SYSTEM SHALL PROVIDE THE SPECIFIED |
| COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED |
| VENTILATION AIR PER THE FBC RES. SEC. G2407.9.3. |
| COMBINED COMBUSTION AIR AND VENTILATION AIR SYSTEM. |
| |
| I. IF LOUVERS ARE USED, LOUVERS THAT ARE BEING |
| INSTALLED FOR THE COMBUSTION AIR SHOW THE LOUVERS' |
| LOCATION. THE LOUVERS CANNOT BE LOCATED ON AN EXTERIOR |
| WALL THAT IS FIRE RATED AS THE FIRE RATING OF THE WALL |
| MUST BE MAINTAINED PER THE WPB AMENDMENTS TO FBC |
| SEC.107.2.1. |
| |
| J. WOULD YOU PLEASE SHOW THE TYPE OF PIPE MATERIAL |
| BEING INSTALLED, LABEL ALL PIPE SIZES, AND THE |
| CORRESPONDING EHD NUMBER OF THE CORRUGATED |
| STAINLESS-STEEL TUBING (IF APPLICABLE) FOR EACH PIPE |
| SIZE PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| K. WOULD YOU PLEASE SHOW THE LOCATION OF ALL MP |
| (STEP-DOWN) REGULATORS. A LISTED SHUTOFF VALVE SHALL BE |
| INSTALLED IMMEDIATELY AHEAD OF EACH MP REGULATOR PER |
| THE 2020 FBC RES. SEC. G2420.4. |
| |
| L. THE BTU'S LOAD IS INCORRECT. WOULD YOU PLEASE SHOW |
| THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD |
| ON THE SYSTEM? REFER TO THE 2020 FBC RES. SEC. G2413. |
| |
| M. WOULD YOU PLEASE CORRECT THE DISTANCE FROM THE POINT |
| OF DELIVERY (GAS METER / MP REGULATOR / LP TANK) TO THE |
| MOST REMOTE OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| THE 2020 FBC RES. SEC. G2413.4.1. |
| |
| N. ON THE GAS NOTES, IT REFERS TO THE 2014 FUEL GAS |
| CODE, AND THE CURRENT IS 2020 FBC 7 EDITION FUEL GAS. |
| WOULD YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE |
| FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| O. WOULD YOU PLEASE SHOW ALL UNIONS IN FRONT OF |
| REGULATOR 1' OF EITHER SIDE PER THE FBC RES. SEC |
| G2421.2. |
| |
| WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| |
| WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON |
| REQUEST. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |