| 1) THE POLE HAS BEEN MOVED FROM ITS PRIOR LOCATION THAT |
| WAS APPROVED BY ZONING. SINCE THE SOUTH BUILDING ON THE |
| PROPERTY AT 1401 NORTH SAPODILLA IS A MIXED-USE |
| BUILDING, THE PROVISION OF NOT BEING LOCATED DIRECTLY |
| IN FRONT OF A RESIDENTIAL BUILDING DOES NOT APPLY FOR |
| THE POLE LOCATION ON 13TH STREET. THE STATE HISTORIC |
| PRESERVATION REVIEW THAT WAS PREVIOUSLY SUBMITTED FOR |
| THIS SITE STILL APPLIES. |
| |
| 2) THE SURVEY NEEDS TO INCLUDE THE POLE HEIGHTS FOR THE |
| UTILITY POLES IN THE 13TH STREET RIGHT-OF-WAY SO THAT |
| STAFF CAN VERIFY THAT THE PROPOSED 28-FOOT TALL POLE IS |
| CONSISTENT WITH THE UTILITY POLE HEIGHTS WITHIN THE |
| 13TH STREET RIGHT-OF-WAY. |
| |
| 3) PLEASE REVIEW THE SURVEY AND SITE PLAN LOCATIONS FOR |
| THE PROPOSED HANDHOLE AT THE SOUTHEAST CORNER OF 13TH |
| STREET AND SAPODILLA. COMPARING THE SURVEY AND THE PLAN |
| TO THE STREET VIEW SEEMS TO INDICATE THAT THE HANDHOLE |
| WILL BE LOCATED WITH THE RAMP THAT TRANSITIONS FROM THE |
| SIDEWALK HEIGHT TO THE STREET GRADE AND THUS WOULD NOT |
| BE IN ADA COMPLIANCE. |
| |
| 4) THE HANDHOLE LOCATION SEEMS TO CONTRADICT THE |
| ENGINEERING DIVISION COMMENT REGARDING THE PROXIMITY TO |
| THE CITY'S WATER LINE. |
| |
| 5) THE REVISED POLE PLACEMENT SHOWS A GAS LINE WITHIN |
| 1-FOOT OF THE BORE PIT DIG AT THE BASE OF THE NEW POLE |
| LOCATION. PLEASE PROVIDE AN UPDATED PUBLIC UTILITY |
| LETTER OF NO OBJECTION FROM FPU FOR THIS LOCATION. |
| |
| 6) THE POLE STYLE AND COLOR MEET CITY REQUIREMENTS. |
| |