Date |
Text |
2021-12-17 15:46:10 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1) THERE IS AN INDICATION OF A FIRE SPRINKLER SYSTEM, |
| HOWEVER, THERE ARE NO DOCUMENTS PER F.A.C. 61G AS |
| REQUIRED PRIOR TO SHOP DRAWINGS. |
| |
| PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004, |
| FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE |
| POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF |
| APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, |
| CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR |
| AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER |
| SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) |
| AND ANY PERFORMANCE BASED INFORMATION SUCH AS |
| PRE-ENGINEERED SYSTEMS. |
| |
| 61G15-30.003 MINIMUM REQUIREMENTS FOR ENGINEERING |
| DOCUMENTS. |
| |
| (1) ENGINEERING DOCUMENTS ARE PREPARED IN THE COURSE OF |
| PERFORMING ENGINEERING SERVICES. WHEN PREPARED FOR |
| INCLUSION WITH AN APPLICATION FOR A GENERAL BUILDING |
| PERMIT, THE DOCUMENTS SHALL MEET ALL ENGINEER?S |
| RESPONSIBILITY RULES, SET FORTH IN CHAPTERS 61G15-31, |
| 61G15-32, 61G15-33, AND 61G15-34, F.A.C., AND BE OF |
| SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND |
| EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT |
| WILL CONFORM TO THE PROVISIONS OF THE FLORIDA BUILDING |
| CODE, ADOPTED IN SECTION 553.73, F.S., AND APPLICABLE |
| LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED |
| BY THE AHJ. THE DOCUMENTS SHALL INCLUDE: |
| (A) INFORMATION THAT PROVIDES MATERIAL SPECIFICATIONS |
| REQUIRED FOR THE SAFE OPERATION OF THE SYSTEM THAT IS A |
| RESULT OF ENGINEERING CALCULATIONS, KNOWLEDGE AND |
| EXPERIENCE. |
| (B) LIST FEDERAL, STATE, MUNICIPAL, AND COUNTY |
| STANDARDS, CODES, ORDINANCES, LAWS, AND RULES, WITH |
| THEIR EFFECTIVE DATES, THAT THE ENGINEERING DOCUMENTS |
| ARE INTENDED TO CONFORM TO. |
| (C) INFORMATION, AS DETERMINED BY THE ENGINEER OF |
| RECORD, NEEDED FOR THE SAFE AND EFFICIENT OPERATION OF |
| THE SYSTEM. |
| (D) LIST ENGINEERING DESIGN CRITERIA; REFERENCE PROJECT |
| SPECIFIC STUDIES, REPORTS, AND DELEGATED ENGINEERING |
| DOCUMENTS. |
| (E) IDENTIFY CLEARLY ELEMENTS OF THE DESIGN THAT VARY |
| FROM THE GOVERNING STANDARDS AND DEPICT/IDENTIFY THE |
| ALTERNATE METHOD USED TO ENSURE COMPLIANCE WITH THE |
| STATED PURPOSE OF THESE RESPONSIBILITY RULES. |
| (2) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME AND |
| BUSINESS ADDRESS, ON ENGINEERING DOCUMENTS. ENGINEERING |
| DOCUMENTS WHICH ARE ISSUED FOR PRELIMINARY OR |
| CONCEPTUAL USE, SHALL CLEARLY NOTE THE INTENDED PURPOSE |
| OF SUCH DOCUMENTS. |
| (3) WHEN ELEMENTS OF THE PROJECT ARE SHOWN ON AN |
| ENGINEERING DOCUMENT ONLY FOR INFORMATION OR |
| CLARIFICATION AND THE ENGINEER DOES NOT INTEND TO |
| ACCEPT RESPONSIBILITY FOR THE ELEMENTS, THE ENGINEER |
| SHALL CLEARLY NOTE ON THE DOCUMENTS THE EXTENT OF HIS |
| RESPONSIBILITY. |
| (4) ENGINEERING DRAWINGS SHALL BE LEGIBLE AND CLEARLY |
| DEFINE AND DELINEATE THE WORK IN THE PROJECT. THEY MUST |
| ALSO COMPLY WITH CHAPTER 61G15-23, F.A.C., SEALS. |
| (5) ENGINEERS SHALL CLEARLY NOTE ON ANY PRELIMINARY |
| ENGINEERING DOCUMENTS THAT SUCH DOCUMENTS ARE NOT IN |
| FINAL FORM, BUT ARE BEING TRANSMITTED TO THE PUBLIC |
| AGENCY TO RECEIVE AGENCY REVIEWS, COMMENTS AND |
| INTERPRETATIONS. THE DOCUMENTS MAY SUBSEQUENTLY BE |
| REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES |
| WITH THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE |
| AGENCY. CHANGES, REVISIONS AND MODIFICATIONS TO A |
| PROJECT MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR |
| AGENCY APPROVAL ACTION ON THE SAME PROJECT. |
| SPECIFIC AUTHORITY 471.033(2), 471.008 FS. LAW |
| IMPLEMENTED 471.033(1)(G), 471.025(3) FS. HISTORY?NEW |
| 1-26-93, FORMERLY 21H-30.003, AMENDED 11-13-08. |
| |
| |
| 61G15-32.004 DESIGN OF WATER BASED FIRE PROTECTION |
| SYSTEMS. |
| (1) WATER BASED FIRE PROTECTION SYSTEMS INCLUDE, BUT |
| ARE NOT LIMITED TO, AUTOMATIC SPRINKLER SYSTEMS OF WET, |
| DRY, FINE WATER SPRAY (MIST), MANUAL, AND DELUGE VALVE |
| CONTROLLED TYPES, PUMPING SYSTEMS, STANDPIPES, FIRE |
| WATER MAINS AND DEDICATED FIRE PROTECTION WATER |
| SOURCES. |
| (2) TO ENSURE MINIMUM DESIGN QUALITY IN FIRE PROTECTION |
| SYSTEM ENGINEERING DOCUMENTS, SAID DOCUMENTS SHALL |
| INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION WHEN |
| APPLICABLE: |
| (A) THE POINT OF SERVICE FOR THE FIRE PROTECTION WATER |
| SUPPLY AS DEFINED BY 633.021(18) F.S. |
| (B) APPLICABLE NFPA STANDARD TO BE APPLIED, OR IN THE |
| CASE WHERE NO SUCH STANDARD EXISTS, THE ENGINEERING |
| STUDY, JUDGMENTS, AND/OR PERFORMANCE BASED ANALYSIS AND |
| CONCLUSIONS. |
| (C) CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR |
| AREA. |
| (D) DESIGN APPROACH, WHICH INCLUDES SYSTEM TYPE, |
| DENSITIES, DEVICE TEMPERATURE RATING, AND SPACING FOR |
| EACH SEPARATE 42 HAZARD OCCUPANCY. |
| (E) |
| CHARACTERISTICS OF WATER SUPPLY TO BE USED, SUCH AS |
| MAIN SIZE AND LOCATION, WHETHER IT IS DEAD-END OR |
| CIRCULATING; AND IF DEAD-END, THE DISTANCE TO THE |
| NEAREST CIRCULATING MAIN, AS WELL AS ITS MINIMUM |
| DURATION AND RELIABILITY FOR THE MOST HYDRAULICALLY |
| DEMANDING DESIGN AREA. |
| (F) WHEN PRIVATE OR PUBLIC WATER SUPPLIES ARE USED, THE |
| FLOW TEST DATA, INCLUDING DATE AND TIME OF TEST, WHO |
| CONDUCTED TEST OR SUPPLIED INFORMATION, TEST ELEVATION, |
| STATIC GAUGE PRESSURE AT NO FLOW, FLOW RATE WITH |
| RESIDUAL GAUGE PRESSURE, HYDRANT BUTT COEFFICIENT, AND |
| LOCATION OF TEST IN RELATION TO THE HYDRAULIC POINT OF |
| SERVICE. |
| (G) VALVING AND ALARM REQUIREMENTS TO MINIMIZE |
| POTENTIAL FOR IMPAIRMENTS AND UNRECOGNIZED FLOW OF |
| WATER. |
| (H) MICROBIAL INDUCED CORROSION (MIC). THE ENGINEER OF |
| RECORD SHALL MAKE REASONABLE EFFORTS TO IDENTIFY WATER |
| SUPPLIES THAT COULD LEAD TO MICROBIAL INDUCED CORROSION |
| (MIC). SUCH EFFORTS MAY CONSIST OF DISCUSSIONS WITH THE |
| LOCAL WATER PURVEYOR AND/OR FIRE OFFICIAL, FAMILIARITY |
| WITH CONDITIONS IN THE LOCAL AREA, OR LABORATORY |
| TESTING OF WATER SUPPLIES. WHEN CONDITIONS ARE FOUND |
| THAT MAY RESULT IN MIC CONTAMINATION OF THE FIRE |
| PROTECTION PIPING, THE ENGINEER SHALL DESIGN CORRECTIVE |
| MEASURES. |
| (I) BACKFLOW PREVENTION AND METERING SPECIFICATIONS AND |
| DETAILS TO MEET LOCAL WATER PURVEYOR REQUIREMENTS |
| INCLUDING MAXIMUM ALLOWABLE PRESSURE DROP. |
| (J) QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL YARD |
| AND INTERIOR FIRE PROTECTION COMPONENTS. |
| (3) CONTRACTOR SUBMITTALS WHICH DEVIATE FROM THE ABOVE |
| MINIMUM DESIGN PARAMETERS SHALL BE CONSIDERED MATERIAL |
| DEVIATIONS AND REQUIRE SUPPLEMENTAL ENGINEERING |
| APPROVAL AND DOCUMENTATION. |
| (4) IN THE EVENT THE ENGINEER OF RECORD PROVIDES MORE |
| INFORMATION AND DIRECTION THAN IS ESTABLISHED ABOVE, HE |
| OR SHE SHALL BE HELD RESPONSIBLE FOR THE TECHNICAL |
| ACCURACY OF THE WORK IN ACCORDANCE WITH APPLICABLE |
| CODES, STANDARDS, AND SOUND ENGINEERING PRINCIPLES. |
| SPECIFIC AUTHORITY 471.008, 471.033(2), FS |
| LAW IMPLEMENTED 471.005(7), 471.033(2), FS |
| HISTORY?NEW 5-19-93, FORMERLY 21H-32.004, AMENDED |
| 4-2-2000, 6-26-01, 7-12-05 |
| |
| PLEASE REVIEW AND PROVIDE THE REQUIRED DOCUMENTATION IN |
| NARRATIVE OR PLAN DRAWINGS WITH THIS MASTER. |
| |
| |
| 2) THERE IS AN INDICATION OF A FIRE ALARM SYSTEM, |
| HOWEVER, THERE ARE NO DOCUMENTS PER F.A.C. 61G AS |
| REQUIRED PRIOR TO SHOP DRAWINGS. |
| |
| 61G15-32.003 COMMON REQUIREMENTS TO ALL FIRE PROTECTION |
| ENGINEERING |
| DOCUMENTS. |
| (1) THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS |
| SHALL PROVIDE THE ENGINEERING REQUIREMENTS TO BE USED |
| IN THE PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT |
| DOCUMENTS AND TO INDICATE THE NATURE AND SCOPE OF THE |
| WORK, AND TO DESCRIBE, DETAIL, DIMENSION, LABEL AND |
| DEFINE THE FIRE PROTECTION COMPONENTS, SYSTEM(S), |
| MATERIALS, ASSEMBLIES, EQUIPMENT AND ITS STRUCTURAL AND |
| UTILITY SUPPORT SYSTEM(S), INSOFAR AS THEY INVOLVE THE |
| SAFEGUARDING OF LIFE, HEALTH OR PROPERTY. |
| (2) THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS |
| SHALL SPECIFY THE APPLICABLE REQUIREMENTS FOR THE |
| ACCEPTANCE TESTING OF THE FIRE PROTECTION SYSTEM AND |
| COMPONENTS, WHICH SHALL BE BASED UPON APPLICABLE CODES |
| AND STANDARDS, WHERE AVAILABLE. |
| (3) THE OCCUPANCY OF THE AREA OR DESCRIPTION OF A |
| SPECIFIC HAZARD BEING PROTECTED BY THE FIRE PROTECTION |
| SYSTEM(S) SHALL BE SHOWN ON THE FIRE PROTECTION SYSTEM |
| ENGINEERING DOCUMENTS. |
| (4) THE APPLICABLE CODE AND STANDARD TO BE USED IN THE |
| PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT |
| DOCUMENTS SHALL BE SHOWN ON THE FIRE PROTECTION SYSTEM |
| ENGINEERING DOCUMENTS. WHEN CODES AND STANDARDS ARE NOT |
| AVAILABLE OR APPLICABLE, AND SAID LAYOUT DOCUMENTS ARE |
| TO BE BASED ON ENGINEERING JUDGMENT, ANY REASONS AND |
| ASSUMPTIONS MADE TO DEVELOP THE FIRE PROTECTION CONCEPT |
| SHALL BE IDENTIFIED ON THE FIRE PROTECTION SYSTEM |
| ENGINEERING DOCUMENTS. |
| (5) STRUCTURAL SUPPORT AND STRUCTURAL OPENINGS REQUIRED |
| BY THE FIRE PROTECTION SYSTEM SHALL BE SHOWN ON THE |
| FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS AND SHALL |
| BE REFERENCED ON STRUCTURAL ENGINEERING DOCUMENTS. |
| (6) WHEN LAYOUT DOCUMENTS CONTAIN MATERIAL DEVIATION |
| FROM THE ENGINEER OF RECORD'S FIRE PROTECTION SYSTEM |
| ENGINEERING DOCUMENT, SUCH LAYOUT DOCUMENTS ARE NOT |
| COMPLIANT UNLESS THEY ARE ACCOMPANIED BY REVISED |
| ENGINEERING DOCUMENTS MADE AND SEALED BY THE ENGINEER |
| OF RECORD FOR THE FIRE PROTECTION SYSTEM. |
| (7) REQUIREMENTS FOR ACTIVATION CONTROL SYSTEMS, |
| SEQUENCE, OPERATING PARAMETERS, INTERLOCKS, SAFETY |
| RELATED DEVICES, INDICATORS AND ALARMS, SHALL BE SHOWN |
| ON THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS, |
| UNLESS SHOWN ON OTHER RELATED DOCUMENTS. |
| (8) ANY INFORMATION DEEMED APPROPRIATE BY THE ENGINEER |
| OF RECORD TO ASSIST THE AUTHORITY HAVING JURISDICTION |
| IN UNDERSTANDING THE OWNER?S INTENDED USE AND PROPOSED |
| PROTECTION OF THE BUILDING OR FACILITY AND TO PROVIDE |
| SUFFICIENT DIRECTION TO THE INSTALLATION CONTRACTOR OR |
| OTHER INTERESTED PARTIES REGARDING THE LAYOUT OF THE |
| SYSTEM(S), SHALL BE INCLUDED IN THE FIRE PROTECTION |
| SYSTEM ENGINEERING DOCUMENTS. |
| SPECIFIC AUTHORITY 471.008, 471.033(2), FS |
| LAW IMPLEMENTED 471.005(7), 471.033(2), FS |
| HISTORY?NEW 5-19-93, FORMERLY 21H-32.003, AMENDED |
| 4-2-2000, 6-26-01 |
| |
| PLEASE REVIEW AND PROVIDE THE REQUIRED DOCUMENTATION IN |
| NARRATIVE OR PLAN DRAWINGS WITH THIS MASTER. |
| |
| |
| |
| |
| 3) ON THE LIFE SAFETY SHEET THERE IS A INDICATION OF A |
| CENTER DIVIDING WALL THAT IS PROPOSED TO BE A 1 HOUR |
| RATED FIRE SEPARATION WALL. |
| |
| THE GROUND FLOOR SHEET INDICATES THAT WALL AS W4. |
| |
| THERE IS NO CLEARLY DEFINED SHEET/CALL-OUT FOR A W4 |
| WALL AND THE ASSOCATIED LISTED 1 HOUR FIRE RATING |
| DESIGN. |
| |
| PLEASE REVIEW AND PROVIDE OR INDICATE WHERE THAT |
| CALL-OUT IS LOCATED. |
| |
| |
| 4) THE GROUND FLOOR PLAN INDICATES AN OPEN OFFICE AREA |
| WITH A W3A SEPARATION WALL FROM THE WAREHOUSE. |
| |
| THERE IS NO CLEARLY DEFINED SHEET/CALL-OUT FOR A W4 |
| WALL AND THE ASSOCATIED LISTED 1 HOUR FIRE RATING |
| DESIGN. |
| |
| PLEASE REVIEW AND PROVIDE OR INDICATE WHERE THAT |
| CALL-OUT IS LOCATED. |
| |
| |
| 4A) THE GROUND FLOOR PLAN INDICATES AN OPEN OFFICE AREA |
| WITH A W3A SEPARATION WALL FROM THE WAREHOUSE. |
| |
| THIS WALL IS NOT IINDICATED AS HAVING A RATING. |
| |
| AS THIS OPEN OFFICE APPEARS TO BE GREATER THAN |
| ACCESSORY/INCIDENTAL. |
| |
| PER NFPA 101 CH 6 |
| |
| 6.1.14.4.3 THE FIRE BARRIER MINIMUM FIRE RESISTANCE |
| RATING SPECIFIED IN |
| TABLE 6.1.14.4.1(A) AND TABLE 6.1.14.4.1(B) SHALL BE |
| PERMITTED TO BE |
| REDUCED BY 1 HOUR, BUT IN NO CASE SHALL IT BE REDUCED |
| TO LESS THAN 1 HOUR, |
| WHERE THE BUILDING IS PROTECTED THROUGHOUT BY AN |
| APPROVED AUTOMATIC |
| SPRINKLER SYSTEM IN ACCORDANCE WITH 9.7.1.1(1) AND |
| SUPERVISED IN ACCORDANCE |
| WITH 9.7.2, UNLESS PROHIBITED BY THE DOUBLE-DAGGER |
| FOOTNOTE ENTRIES |
| IN THE TABLES. |
| |
| ADDITIONALLY |
| |
| 6.2 HAZARD OF CONTENTS |
| 6.2.1 GENERAL. |
| 6.2.1.1 FOR THE PURPOSE OF THIS CODE, THE HAZARD OF |
| CONTENTS SHALL BE |
| THE RELATIVE DANGER OF THE START AND SPREAD OF FIRE, |
| THE DANGER OF SMOKE |
| OR GASES GENERATED, AND THE DANGER OF EXPLOSION OR |
| OTHER OCCURRENCE |
| POTENTIALLY ENDANGERING THE LIVES AND SAFETY OF THE |
| OCCUPANTS OF THE |
| BUILDING OR STRUCTURE. |
| |
| SO THE WAREHOUSE SHOULD BE SEPARATED FROM THE OPEN |
| OFFICE AREA BY A LEAST 1 HOUR RATED FIRE SEPARATION |
| WALL, WITH ANY DOOR/WINDOW IN THAT WALL CARRYING THE |
| SAME RATING. |
| |
| PLEASE REVIEW AND CORRECT OR PROVIDE A DETAILED |
| NARRATIVE WITH SPECIFIC CODE REFERENCES WHY IS SHOULD |
| NOT. |
| |
| |
| 5) SHEET C 2.3 INDICATES UNDERGROUND FIRE LINES/FDC |
| LINES. |
| |
| ALL FIRE LINE UNDERGROUND/FDC LINES SHALL BE INSTALLED |
| UNDER SEPARATE PERMIT AND SHOP DRAWINGS IN COMPLIANCE |
| WITH NFPA 24. |
| |
| PLEASE PROVIDE A NOTE OF ACKNOWLEDGMENT. |
| |
| |
| 5A) SHEET C 2.3 INDICATES A SINGLE DDCV FOR BOTH |
| DOMESTIC & FIRE LINES. |
| |
| THE UTILITES DEPARTMENT FOR THE CITY REQUIRES THAT THE |
| FIRE LINE BE UNDER ITS OWN SEPARATE METER AND DDCV. |
| |
| PLEASE REVIEW WITH THE UTILITIES DEPARTMENT FOR |
| CONFIRMATION AND CORRECT. |
| |
| |
| |
| 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |