Date |
Text |
2022-06-22 08:13:44 | ADDITION AND ALTERATION |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| AMENDMENT |
| |
| CORRECTIONS NEEDED - |
| |
| 1) ROOFING PRODUCT APPROVAL (18-0919.07) SHOWS THE |
| MAXIMUM WIND DESIGN PRESSURE OF (-52) - SEE GENERAL |
| LIMITATION NUMBER 7 ON THE PRODUCT APPROVAL - PLEASE |
| PROVIDE SIGNED AND SEALED ADDITIONAL ATTACHMENT DETAILS |
| FROM A DESIGN PROFESSIONAL FOR THE ROOFING WIND ZONES |
| WHICH REQUIRE A HIGHER WIND DESIGN PRESSURE PER DRAWING |
| S1. |
| |
| 2) ROOFING PRODUCT APPROVAL (22-0107.2) PLEASE CIRCLE |
| THE ROOF SYSTEM TO BE USED IN THE PRODUCT APPROVAL - |
| SEE GENERAL LIMITATION NUMBER 7 ON THE PRODUCT APPROVAL |
| - PLEASE PROVIDE SIGNED AND SEALED ADDITIONAL |
| ATTACHMENT DETAILS FROM A DESIGN PROFESSIONAL FOR THE |
| ROOFING WIND ZONES WHICH REQUIRE A HIGHER WIND DESIGN |
| PRESSURE PER DRAWING S1. |
| |
| 3) (THE 18" SHOWN ON THE DRAWING IS FROM THE HINGE SIDE |
| - NEEDS TO BE FROM THE LATCH SIDE) ACCESSIBLE RESTROOM |
| - PLEASE SHOW THE DOOR MANEUVERING CLEARANCE FROM |
| INSIDE THE REST ROOM (18" BESIDE THE LATCH SIDE) TO |
| EXIT THE RESTROOM. |
| |
| 4) ROOFING SYSTEMS MAY BE DEFERRED SUBMITTALS BY |
| LISTING ITEMS TO BE DEFERRED ON THE CONSTRUCTION |
| DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. FOR THE |
| PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |