Date |
Text |
2022-07-13 09:33:36 | 7/13 DELETED LOCKED DOCUMENTS, DELETED DOCUMENTS IN |
| SIGNATURE FOLDER (EXCEPT MOST CURRENT S&S STRUCTURAL |
| DOCUMENT), ROUTED BACK TO AFFIDAVIT REVIEW AND BLDG |
| DIVISION AUDIT SH |
| |
| |
2022-07-12 10:00:16 | PLEASE REFER TO PROJECTDOX INSTRUCTIONS. |
| |
| NOTHING SHOULD BE UPLOADED TO THE SIGNATURE FOLDER (SEE |
| INSTRUCTIONS). ALL DOCUMENTS SHOULD BE UPLOADED TO |
| DRAWINGS AND SUPPORTING DOCS. |
| |
| AT THIS POINT MANY DOCUMENTS HAVE BEEN LOCKED. |
| COORDINATE WITH [email protected] TO DELETE ALL |
| UNNECESSARY DOCUMENTS. |
| |
| IT APPEARS THAT A MULTIPAGE STRUCTURAL PDF WAS UPLOADED |
| TO THE SIGNATURE FOLDER (ALONG WITH MANY OTHER |
| DOCUMENTS). SEE PROJECTDOX INSTRUCTIONS, NOTHING SHOULD |
| BE UPLOADED TO THIS FOLDER - THIS IS FOR STAFF USE |
| ONLY. EACH PAGES SHOULD BE UPLOADED AS AN INDIVIDUAL |
| PDF. IF THE ENGINEER REFUSES TO PROVIDE INDIVIDUALLY |
| SIGNED PDFS, A SINGLE PDF CAN BE SUBMITTED AFTER ALL |
| REVIEWS HAVE PASSED. |
| |
| THERE ARE NOW SIX DOCUMENTS IN SIGNATURE (SHOULD HAVE |
| ZERO). COORDINATE WITH THE PERMIT LIBRARIANS TO HAVE |
| THEM ALL DELETED. ANY REQUIRED DOCUMENTS SHOULD BE |
| SUBMITTED TO THE SUPPORTING DOCS FOLDER (INCLUDING |
| SIGNATURE DOCUMENTS, CLEARLY NAMED). |
| |
| DUE TO THE WAY FILES ARE NAMED, THEY DO NOT APPEAR IN |
| ORDER. THEY APPEAR AS PAGE 1, P10, PAGE 11, P2, P13, |
| P2. THIS IS WHY A DOUBLE OR TRIPLE DIGIT PREFIX IS |
| REQUIRED, SEE PROJECTDOX INSTRUCTIONS. FOR INSTANCE, |
| FILE NAMED 10_E1_.10R.PDF. THIS DOES NOT HAVE TO BE |
| FIXED FOR THIS SUBMITTAL, BUT BE ADVISED THAT FUTURE |
| SUBMITTALS MUST FOLLOW THE NAMING CONVENTION. |
| |
| |
| |