Plan Review Notes
Plan Review Notes For Permit 21101361
Permit Number 21101361
Review Stop B
Sequence Number 2
Notes
Date Text
2022-01-26 07:35:07WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION
 SERVICES/ BUILDING DIVISION
 2020 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 21101361
 ADD: 301 CLEMATIS ST. (EXTERIOR WINDOWS & STOREFRONT
 REPLACEMENT)
 CONT: GILBANES BUILDING COMPANY
 TEL: ???
 E-MAIL: [email protected]
  
 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW
 CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES
 SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING.
  
 2ND REVIEW
 DATE: WED. JAN. 26TH/ 2022
 ACTION: BUILDING PROVISO
  
 1) DEFERRED SUBMITTALS: COMPONENTS & CLADDING.
  
 2) DEFERRED SUBMITTALS. BEFORE SUBMITTING PLEASE
 IDENTIFY GLAZING/ MULLIONS. PLEASE IDENTIFY IN THE
 PRODUCT APPROVAL BEFORE SUBMITTING TO DESIGNER OF
 RECORD AND BEFORE SUBMISSION TO THE BUILDING
 DEPARTMENT. FOR ALL PRODUCTS WITH GLAZING, PLEASE
 IDENTIFY THE OPENING WIDTH & HEIGHT, SILL HEIGTH, TYPE
 OF GLAZING, MULLION SIZE, LENGTH IF UNREINFORCED OR
 REINFORCED INFORMATION IF REQUIRED, ATTACHMENTS AND
 ASSOCIATE PRESSURES FOR EACH OPENING SIZE. 2020 FBC-B
 1405.13.1 INSTALLATION. WINDOWS AND DOORS SHALL BE
 INSTALLED IN ACCORDANCE WITH APPROVED MANUFACTURERS
 INSTRUCTIONS. FASTENER SIZE AND SPACING SHALL BE
 PROVIDED IN SUCH INSTRUCTIONS AND SHALL BE CALCULATED
 BASED ON MAXIMUM LOADS AND SPACING USED IN THE TESTS.
  
 3) BUILDING PROVISO: A3.0.1 NOTE # 9 INDICATES THE USE
 OF NANA DOOR SYSTEMS. DEPENDING ON THE OCCUPANCY TYPE,
 OCCUPANCY LOAD COMPLIANCE WITH SECTION 1010.1.2.1 OF
 THE 2020 FBC-BUILDING CODE MAYBE DIFFICULT TO OBTAIN
 FOR EGRESS PURPOSES.
  
 4) WELDED OR BOLTED CONNECTIONS. THIS BUILDING CONTAINS
 EITHER BOLTED AND OR WELDED CONNECTIONS. THE CONTRACTOR
 IS REQUIRED TO PROVIDE WELD PROCEDURE SPECIFICATIONS &
 WELDER OPERATOR PERFORMANCE QUALIFICATION RECORDS IN
 ACCORDANCE WITH THE REFERENCED STANDARDS AT TIME OF
 INSPECTION FOR FIELD WIELDING, ON THE JOB-SITE
 WIELDING. THIRD PARTY CERTIFICATION WILL BE REQUIRED.
 THE OWNER MAY JUST HIRE A 3RD PARTY ENGINEERING FIRM TO
 COMPLETE AND APPROVE THE FORMER INSPECTIONS. REPORTS
 SUBMITTED TO BUILDING INSPECTOR AT TIME OF FRAMING
 INSPECTION.
 2020 FBC-B 2204.1 WELDING
 1. WELD PROCEDURES SPECIFICATIONS
 2. QUALIFICATIONS OF WELDING PERSONAL
 2017 FBC-B 2204.2 BOLTING.
 IF FURTHER CLARIFICATION AND OR QUESTIONS IS REQUIRED,
 PLEASE CONTACT THE CHIEF BUILDING INSPECTOR KEN CONRAD
 AT 561-805-6666 OR ACTING CHIEF RICHARD BRUNELL
 561-805-8161.
  
 JAMES A. WITMER BN, PX, SFP, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST. WEST PALM BEACH. FL 33402
 TEL: 561-805-6717
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  