2021-10-21 14:17:17 | PASSED WITH PROVISOS: |
| |
| THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT IF PAVERS |
| ARE USED IN THE RIGHT OF WAY PORTION OF THE DRIVEWAY. |
| THE AGREEMENT MUST BE RECORDED AT PALM BEACH COUNTY |
| COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED COPY OF |
| THIS DOCUMENT SHOULD BE FAXED TO (561) 494-1116. |
| ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS TO BE |
| RECORDED PRIOR TO FINAL SIGN OFF. |
| |
| FOR A PDF COPY OF THE PAVER DRIVEWAY AGREEMENT GO TO: |
| HTTPS://WWW.WPB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3298/637 |
| 523652570000000 |
| |
| MAXIMUM DRIVEWAY WIDTHS AT RIGHT OF WAY SHALL NOT |
| EXCEED 20 FT.PLUS TWO 3 FT. FLARES. |
| |
| THERE ARE CITY WATER UTILITIES IN THE AREA OF THE |
| PROPOSED DRIVEWAY, DO NOT CONSTRUCT ON TOP OF WATER |
| METER. CALL FOR LOCATES, DIAL 811 BEFORE YOU DIG. FOR |
| MORE INFO ON "CALL BEFORE YOU DIG", GO TO |
| HTTP://WWW.SUNSHINE811.COM (REF: UNDERGROUND FACILITY |
| DAMAGE PREVENTION AND SAFETY ACT, FLORIDA STATUTE, |
| CHAPTER 556.) |
| |
| RICK ROSSANO, SENIOR PROJECT COORDINATOR, |
| CITY OF WPB ENGINEERING SERVICES DEPARTMENT |
| DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: |
| (561) 246-9525 |
| EMAIL: [email protected] |
| HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- |
| STANDARDS-DETAILS |
| |
| |
| CENTRAL OPERATIONS CENTER (DISPATCH): |
| 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC |