Date |
Text |
2021-10-18 15:36:32 | BUILDING PLAN REVIEW |
| |
| CHRISTOPHER S. THROOP, C.B.O., CFM |
| PLANS EXAMINER II PX3169/SFP306 |
| INSPECTOR BN4338 |
| BUILDING OFFICIAL BU1635 |
| ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| DEVELOPMENT SERVICES DEPARTMENT |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| |
| 2ND REVIEW |
| |
| PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| SATISFACTORILY ARE MARKED AS CORRECTED. |
| PREVIOUS COMMENTS THAT HAVE NOT BEEN ADDRESSED |
| SATISFACTORILY MAY HAVE ADDITIONAL COMMENTS IN |
| PARENTHESES. ANY NEW COMMENT WILL BE LISTED AFTER |
| PREVIOUS COMMENTS. |
| |
| |
| RESULTS: DENIED |
| |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| 1. PROVIDE THE EVENT FUNCTION. (CANNOT DETERMINE IF |
| LIFE SAFETY PLAN IS REQUIRED) |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| 2. CORRECTED. |
| |
| 3. **ADDITIONAL REQUIREMENTS |
| FOR TEMPORARY MEMBRANE STRUCTURES (TENTS) WITH A SPAN |
| OF 40 FEET OR GREATER IN ANY DIRECTION: |
| |
| A. PROVIDE DETAILS OF STRUCTURAL CONNECTIONS. INCLUDE |
| BASEPLATE/TIEDOWN DETAILS. |
| B. PROVIDE STRUCTURAL EVALUATION OF STRUCTURE. |
| |
| THESE DOCUMENTS SHALL BE REVIEWED, SIGNED AND SEALED BY |
| A DESIGN PROFESSIONAL. |
| (ENGINEERING SUBMITTED FOR REVIEW IS FOR A LOT BOUNDED |
| EAST/WEST BY QUADRILLE BLVD AND DIXIE HWY AND |
| NORTH/SOUTH BY IRIS AVE AND OKEECHOBEE BLVD. |
| |
| NO EXCEPTIONS BY ORDER OF THE BUILDING OFFICIAL |
| |
| NEW COMMENTS: |
| |
| 4. ENGINEERING SHALL BEAR A VALID SIGNATURE AND SEAL OF |
| THE DESIGN PROFESSIONAL. (SEE SIGNATURE REVIEW |
| COMMENTS) |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| |
| |