Date |
Text |
2022-12-08 14:20:16 | DIMENSION DRIVEWAYS, LOCATED HORIZONTALLY AND |
| VERTICALLY. CALL OUT MIN. 3 FT. SETBACK FROM EDGE OF |
| PROPOSED DRIVEWAY TO PROPERTY LINE. SHOW ANY WATER |
| METERS, SANITARY CLEANOUTS, STORM INLETS ETC. IN |
| VICINITY OF PROPOSED DRIVEWAY. DO NOT CONSTRUCT |
| DRIVEWAY ON TOP OF WATER METERS, SANITARY CLEANOUTS, |
| STORMWATER INLETS ETC. |
| |
| CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB |
| CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE |
| BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), |
| OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR |
| EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD |
| DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG |
| /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS |
| |
| ADDITIONAL COMMENTS ADDED 12.13.,22: |
| |
| 1) THE PROPOSED DRIVEWAY CAN NOT BE WIDER THAN 20 FT. |
| PLUS A 3 FT. FLARE ON EACH SIDE. I DO NOT SEE THE WIDTH |
| CALLED OUT AT THE RIGHT OF WAY, BUT THE MEASUREMENT |
| SHOW ON PROPERTY FOR IT IS 23.8 FT. |
| 2) I DO SEE THE EXISTING APRON BEING CALLED OUT TO BE |
| REMOVED. THERE IS A PROPOSED GRAVEL DRIVEWAY WHICH I DO |
| NOT THINK ZONING WILL ALLOW. EVEN IF THEY DO, CARS CAN |
| NOT DRIVE OVER THE SIDEWALK WITH NO APRON. YOU WILL |
| NEED TO RESOLVE THE PROPOSED GRAVEL DRIVE WITH THEM, |
| BUT YOU MAY NOT HAVE DRIVEWAYS AT THE RIGHT OF WAY |
| EXCEEDING 20 FT. TOTAL. |
| |
| |
| |
| THANKS, |
| RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES |
| DEPT., 561-494-1098, FAX: 561-494-1116 [email protected] |
| FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC |
| UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 |
| |
| |