Date |
Text |
2021-09-23 10:15:50 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| 1) THERE IS AN INDICATION OF THE SPEC SHEET FOR THE |
| FLOOR UNDERLAYMENT, BUT NO SPEC SHEET FOR THE ACTUAL |
| PROPOSED FLOORING TILE. |
| |
| TILE FLOORING COULD HAVE DIFFERENT MEANINGS AND IF NOT |
| CERAMIC/PORCELAIN/MARBLE/CEMENT IT CAN BE |
| VINYL/LAMINATE ETC AND IS MANUFACTURED |
| AROUND THE WORLD AND NOT ALL ARE TESTED AND MEETING |
| LISTED AND NFPA STANDARDS. |
| |
| FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE SPECIFIC |
| TILE TYPE AND/OR PRODUCT SPEC SHEETS OF THE PROPOSED |
| FINISHED FLOORING INDICATING THE FIRE BEHAVIOR RATING. |
| |
| |
| 2) THE FLOOR PLAN SUBMITTED INDICATES THE LOCATION OF |
| THE BATHROOM & KITCHEN THAT APPEAR TO BE LOCATED ALONG |
| A |
| FIRE RATED TENANT AND/OR CORRIDOR SEPARATION WALL |
| REQUIRING MAINTENANCE/REPAIR OF THE FIRE RATED WALL |
| SHOULD THE DEMO DAMAGE THAT WALL. |
| |
| PLEASE REVIEW, ENSURE WALL FIRE RATING IS NOT |
| COMPROMISED AND PROVIDE A NOTE OF ACKNOWLEDGEMENT ON |
| THE FLOOR PLAN. |
| |
| |
| |
| 3) PROTECT FIRE SPRINKLERS AND FIRE ALARM DEVICES AND |
| EQUIPMENT. |
| |
| DO NOT PAINT OVER SPRINKLER HEADS AND/OR FIRE ALARM |
| DEVICES/EQUIPMENT. |
| |
| THE FS AND FA SYSTEMS SHALL BE MAINTAINED THROUGHOUT |
| DEMO AND CONSTRUCTION. |
| |
| |
| PLEASE REVIEW, ENSURE COMPLIANCE AND PROVIDE A NOTE OF |
| ACKNOWLEDGEMENT ON THE FLOOR PLAN. |
| |
| |
| |
| 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |