2021-10-06 14:19:50 | PLEASE SEE THE FUEL GAS REVIEWERS COMMENTS BELOW: |
| |
| |
| 1ST REVIEW FBC-2017 FUEL GAS |
| PERMIT- 21090831 |
| 10/4/21 |
| |
| CODES IN EFFECT: |
| FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| 2017 |
| FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| 2017 |
| FS- FLORIDA STATUTES |
| FAC- FLORIDA ADMINISTRATIVE CODE |
| WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| EDITION 2017 |
| |
| PLAN REVIEW RESULTS: DENIED. THE GAS PLANS FOR THE |
| MASTER PERMIT- 21020294 WERE APPROVED WITH A PROVISO |
| REQUIRING SEPARATE PERMITS AND PLANS FOR INSTALLATION |
| OF THE COFFEE ROASTERS, GAS CONNECTIONS, AND EXHAUST |
| VENTILATION SYSTEM. THE COMMENTS BELOW ARE ADDRESSING |
| THE PLANS AND SUBMITTALS UNDER THIS SEPARATE PERMIT. |
| |
| 1) GAS PIPING AND PRESSURES: ACCORDING TO THE SUBMITTED |
| COFFEE ROASTER SPECS, THE GAS INPUT PRESSURE IS 19.68 |
| INCHES WATER COLUMN FOR THE G90, AND 4.0 IN. W.C. FOR |
| THE L12. THE GAS RISER DRAWING UNDER PERMIT 21020294 |
| SHOWS ONE REGULATOR CONTROLLING THE GAS FLOW TO BOTH |
| ROASTERS, HOWEVER BASED ON THE DIFFERING INPUT |
| PRESSURES, A REGULATOR IS REQUIRED FOR EACH ROASTER. |
| PLEASE SUBMIT A REVISED RISER DRAWING SHOWING THE |
| LOCATIONS OF THE REGULATORS. SUBMIT SPECS FOR THE |
| REGULATORS MARKED UP OR HIGHLIGHTED TO SHOW THE |
| SELECTED MODELS AND INPUT AND OUTPUT PIPE SIZES AND |
| PRESSURES- SECTION 410.2 FBC FG. A) THE SUBMITTED LABEL |
| PHOTO FOR THE IR-1 ROASTER DOES NOT PROVIDE LP GAS |
| INPUT PRESSURE. PLEASE PROVIDE THE PRESSURE AND SUBMIT |
| SPECS FOR THE REGULATOR. |
| |
| 2) COMBUSTION AIR: THE SUBMITTED LETTER FROM BMC |
| CONSULTING DOES NOT ADDRESS COMBUSTION AIR FOR THE |
| ROASTERS. ON SHEET P2.0 OF THE MASTER PLAN, REFERENCE |
| IS MADE TO SHEET M3.1 FOR THE COMBUSTION AIR |
| CALCULATIONS USING MECHANICAL THE AIR SYSTEMS IN THE |
| SPACE HOWEVER THE CALCULATION IS NOT SHOWN ON THE PLAN. |
| PLEASE PROVIDE THE CALCULATION AND REFER TO SECTION |
| 304.9.2 FBC FG: EACH OF THE ROASTERS SHALL BE |
| INTERLOCKED WITH THE MECHANICAL AIR SUPPLY SYSTEM TO |
| PREVENT MAIN BURNER OPERATION WHEN THE MECHANICAL AIR |
| SYSTEM IS NOT IN OPERATION. PLEASE NOTE THAT SECTION |
| 304.5 ALLOWS THE USE OF INDOOR AIR FOR COMBUSTION AS AN |
| ALTERNATIVE TO USING MECHANICALLY SUPPLIED AIR. |
| |
| 3) MAKEUP AIR: THE SUBMITTED LETTER FROM BMC CONSULTING |
| DOES NOT ADDRESS MAKEUP AIR FOR THE ROASTERS. MASTER |
| PLAN SHEET P2.0 LIST AIR CONSUMPTION VALUES FOR THE |
| ROASTERS. REFER TO SECTION 304.9.1 FBC FG AND INDICATE |
| HOW THE MAKEUP AIR IS BEING PROVIDED FOR THE EXHAUST |
| FANS. PLEASE NOTE THAT MAKEUP AIR IS DEFINED AS ANY |
| COMBINATION OF OUTDOOR AIR AND TRANSFER AIR- SECTION |
| 202. PLEASE NOTE THERE IS A DISCREPANCY BETWEEN THE |
| PLAN AND THE L12 SPECS WHICH INDICATES AIR CONSUMPTION |
| VALUES OF 410 CFMS COLD AND 402 CFMS HOT- SHEET P2.0 |
| INDICATES 486 CFMS. |
| |
| 4) EXHAUST VENTILATION SYSTEM: |
| A) THERE APPEARS TO BE A CONFLICT BETWEEN THE L12 |
| SPECIFICATIONS AND THE NEW M3.2 PLAN SHEET. THE L12 |
| SUBMITTAL INDICATES ON PAGE 10 THAT THE "ANY |
| NEAR-HORIZONTAL DUCTING SHOULD HAVE AN UPWARD |
| INCLINATION OF AT LEAST 45 DEGREES." THE NEW SUBMITTED |
| PLAN SHEET M3.2 SHOWS THE MAIN 18 INCH EXHAUST DUCT |
| SLOPING DOWNWARD, AND THE LETTER FROM BMC CONSULTING |
| STATES " THE 18" EXHAUST DUCTWORK IS SLOPED TOWARD THE |
| EXTERIOR AT A MINIMUM OF 1/8 " PER FOOT, WHICH IS NOT |
| REQUIRED BUT WAS DESIGNED TO FURTHER ENHANCE THE FLOW |
| OF THE EXHAUST." PLEASE PROVIDE FURTHER EXPLANATORY |
| INFORMATION IN THE LETTER TO CLARIFY THIS CONFLICT. |
| B) PLEASE REMOVE THE CUT SHEET FOR THE STAINLESS STEEL |
| DUCTWORK FROM THE NEW PLAN SHEET M3.2. THE LETTER FROM |
| BMC CONSULTING SPECIFIES G90 DUCTWORK. |
| C) THE LETTER FROM BMC CONSULTING APPEARS TO INDICATE |
| THAT THE EXHAUST SYSTEM IS AN ENGINEERED DESIGN |
| PROVIDED BY THE EOR. ENGINEERED DESIGNS ARE ALLOWED FOR |
| SINGLE WALL METAL PIPE GAS VENTING PER SECTION 503.7.9 |
| (3) FBC FG, HOWEVER IN ORDER TO VERIFY THE SYSTEM WILL |
| BE CONSTRUCTED PROPERLY PER THE ENGINEER'S DESIGN, AND |
| FOR FIELD INSPECTION PURPOSES, PLEASE PROVIDE THE DUCT |
| LENGTH MEASUREMENTS ON THE PLAN SHEET M3.2- SECTION |
| 107.2.1 WPB. |
| D) THE LETTER FROM BMC CONSULTING INCLUDES AN EXCERPT |
| FROM NORDFAB?S DESIGN REVIEW. PLEASE SUBMIT A COPY OF |
| THE NORDFAB DESIGN REVIEW. |
| E) PLEASE EXPAND ON THIS STATEMENT IN THE LETTER- "BMC |
| CONSULTING IS CONFIDENT, PENDING THE PROPER |
| INSTALLATION BY THE NORDFAB CERTIFIED INSTALLING |
| CONTRACT & VENTILATION SPECIALIST (HIGH TECH DUCT |
| WERKS, LLC), THE NORFAB (MISSPELLED) DUCTWORK WILL |
| OPERATE AS REQUIRED TO MEET THE CODE |
| REQUIREMENTS/INTENT OF THE FBC 2017, MECHANICAL EDITION |
| FOR THE TRANSPORT OF HOT EXHAUST AIR." PLEASE INDICATE |
| SPECIFICALLY WHICH CODE SECTIONS AND CLARIFY HOW PROPER |
| INSTALLATION WILL BE CONFIRMED. FOR EXAMPLE- WILL BMC |
| CONSULTING PERFORM FIELD INSPECTIONS, AND WILL |
| "STARTUP" TESTING BE PERFORMED? |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL/PLUMBING PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| CCOLE@WPB |
| |