2021-10-04 18:10:121ST REVIEW FBC-2017 FUEL GAS
 PERMIT- 21090831
 10/4/21
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED. THE GAS PLANS FOR THE
 MASTER PERMIT- 21020294 WERE APPROVED WITH A PROVISO
 REQUIRING SEPARATE PERMITS AND PLANS FOR INSTALLATION
 OF THE COFFEE ROASTERS, GAS CONNECTIONS, AND EXHAUST
 VENTILATION SYSTEM. THE COMMENTS BELOW ARE ADDRESSING
 THE PLANS AND SUBMITTALS UNDER THIS SEPARATE PERMIT.
  
 1) GAS PIPING AND PRESSURES: ACCORDING TO THE SUBMITTED
 COFFEE ROASTER SPECS, THE GAS INPUT PRESSURE IS 19.68
 INCHES WATER COLUMN FOR THE G90, AND 4.0 IN. W.C. FOR
 THE L12. THE GAS RISER DRAWING UNDER PERMIT 21020294
 SHOWS ONE REGULATOR CONTROLLING THE GAS FLOW TO BOTH
 ROASTERS, HOWEVER BASED ON THE DIFFERING INPUT
 PRESSURES, A REGULATOR IS REQUIRED FOR EACH ROASTER.
 PLEASE SUBMIT A REVISED RISER DRAWING SHOWING THE
 LOCATIONS OF THE REGULATORS. SUBMIT SPECS FOR THE
 REGULATORS MARKED UP OR HIGHLIGHTED TO SHOW THE
 SELECTED MODELS AND INPUT AND OUTPUT PIPE SIZES AND
 PRESSURES- SECTION 410.2 FBC FG. A) THE SUBMITTED LABEL
 PHOTO FOR THE IR-1 ROASTER DOES NOT PROVIDE LP GAS
 INPUT PRESSURE. PLEASE PROVIDE THE PRESSURE AND SUBMIT
 SPECS FOR THE REGULATOR.
  
 2) COMBUSTION AIR: THE SUBMITTED LETTER FROM BMC
 CONSULTING DOES NOT ADDRESS COMBUSTION AIR FOR THE
 ROASTERS. ON SHEET P2.0 OF THE MASTER PLAN, REFERENCE
 IS MADE TO SHEET M3.1 FOR THE COMBUSTION AIR
 CALCULATIONS USING MECHANICAL THE AIR SYSTEMS IN THE
 SPACE HOWEVER THE CALCULATION IS NOT SHOWN ON THE PLAN.
 PLEASE PROVIDE THE CALCULATION AND REFER TO SECTION
 304.9.2 FBC FG: EACH OF THE ROASTERS SHALL BE
 INTERLOCKED WITH THE MECHANICAL AIR SUPPLY SYSTEM TO
 PREVENT MAIN BURNER OPERATION WHEN THE MECHANICAL AIR
 SYSTEM IS NOT IN OPERATION. PLEASE NOTE THAT SECTION
 304.5 ALLOWS THE USE OF INDOOR AIR FOR COMBUSTION AS AN
 ALTERNATIVE TO USING MECHANICALLY SUPPLIED AIR.
  
 3) MAKEUP AIR: THE SUBMITTED LETTER FROM BMC CONSULTING
 DOES NOT ADDRESS MAKEUP AIR FOR THE ROASTERS. MASTER
 PLAN SHEET P2.0 LIST AIR CONSUMPTION VALUES FOR THE
 ROASTERS. REFER TO SECTION 304.9.1 FBC FG AND INDICATE
 HOW THE MAKEUP AIR IS BEING PROVIDED FOR THE EXHAUST
 FANS. PLEASE NOTE THAT MAKEUP AIR IS DEFINED AS ANY
 COMBINATION OF OUTDOOR AIR AND TRANSFER AIR- SECTION
 202. PLEASE NOTE THERE IS A DISCREPANCY BETWEEN THE
 PLAN AND THE L12 SPECS WHICH INDICATES AIR CONSUMPTION
 VALUES OF 410 CFMS COLD AND 402 CFMS HOT- SHEET P2.0
 INDICATES 486 CFMS.
  
 4) EXHAUST VENTILATION SYSTEM:
 A) THERE APPEARS TO BE A CONFLICT BETWEEN THE L12
 SPECIFICATIONS AND THE NEW M3.2 PLAN SHEET. THE L12
 SUBMITTAL INDICATES ON PAGE 10 THAT THE "ANY
 NEAR-HORIZONTAL DUCTING SHOULD HAVE AN UPWARD
 INCLINATION OF AT LEAST 45 DEGREES." THE NEW SUBMITTED
 PLAN SHEET M3.2 SHOWS THE MAIN 18 INCH EXHAUST DUCT
 SLOPING DOWNWARD, AND THE LETTER FROM BMC CONSULTING
 STATES " THE 18" EXHAUST DUCTWORK IS SLOPED TOWARD THE
 EXTERIOR AT A MINIMUM OF 1/8 " PER FOOT, WHICH IS NOT
 REQUIRED BUT WAS DESIGNED TO FURTHER ENHANCE THE FLOW
 OF THE EXHAUST." PLEASE PROVIDE FURTHER EXPLANATORY
 INFORMATION IN THE LETTER TO CLARIFY THIS CONFLICT.
 B) PLEASE REMOVE THE CUT SHEET FOR THE STAINLESS STEEL
 DUCTWORK FROM THE NEW PLAN SHEET M3.2. THE LETTER FROM
 BMC CONSULTING SPECIFIES G90 DUCTWORK.
 C) THE LETTER FROM BMC CONSULTING APPEARS TO INDICATE
 THAT THE EXHAUST SYSTEM IS AN ENGINEERED DESIGN
 PROVIDED BY THE EOR. ENGINEERED DESIGNS ARE ALLOWED FOR
 SINGLE WALL METAL PIPE GAS VENTING PER SECTION 503.7.9
 (3) FBC FG, HOWEVER IN ORDER TO VERIFY THE SYSTEM WILL
 BE CONSTRUCTED PROPERLY PER THE ENGINEER'S DESIGN, AND
 FOR FIELD INSPECTION PURPOSES, PLEASE PROVIDE THE DUCT
 LENGTH MEASUREMENTS ON THE PLAN SHEET M3.2- SECTION
 107.2.1 WPB.
 D) THE LETTER FROM BMC CONSULTING INCLUDES AN EXCERPT
 FROM NORDFAB?S DESIGN REVIEW. PLEASE SUBMIT A COPY OF
 THE NORDFAB DESIGN REVIEW.
 E) PLEASE EXPAND ON THIS STATEMENT IN THE LETTER- "BMC
 CONSULTING IS CONFIDENT, PENDING THE PROPER
 INSTALLATION BY THE NORDFAB CERTIFIED INSTALLING
 CONTRACT & VENTILATION SPECIALIST (HIGH TECH DUCT
 WERKS, LLC), THE NORFAB (MISSPELLED) DUCTWORK WILL
 OPERATE AS REQUIRED TO MEET THE CODE
 REQUIREMENTS/INTENT OF THE FBC 2017, MECHANICAL EDITION
 FOR THE TRANSPORT OF HOT EXHAUST AIR." PLEASE INDICATE
 SPECIFICALLY WHICH CODE SECTIONS AND CLARIFY HOW PROPER
 INSTALLATION WILL BE CONFIRMED. FOR EXAMPLE- WILL BMC
 CONSULTING PERFORM FIELD INSPECTIONS, AND WILL
 "STARTUP" TESTING BE PERFORMED?
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 CCOLE@WPB
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved