Plan Review Notes
Plan Review Notes For Permit 21081267
Permit Number 21081267
Review Stop P
Sequence Number 1
Notes
Date Text
2021-09-17 08:37:401ST REVIEW FBC-2017 PLUMBING
 PERMIT- 21081267
 9/15/21
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 6TH EDITION 2017
 FBC ACC- FLORIDA ACCESSIBILITY CODE 6TH EDITION 2017
 FBC B- FLORIDA BUILDING CODE 6TH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 6TH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS FOR THE MAIN POOL- DENIED.
  
 1) PLEASE NOTE THE FOLLOWING LIST OF ITEMS REQUIRING
 SEPARATE PERMITS AND PLAN SUBMITTALS:
 ON SITE PLUMBING FOR WATER SUPPLY AND WASTE-WATER
 DISPOSAL.
 BACKFLOW PREVENTER FOR THE WATER SUPPLY TO THE POOL.
 AUTO FILL INSTALLATION.
 RESTROOM FACILITY AND PLUMBING AND FIXTURE
 INSTALLATIONS.
 POOL SHOWER AND HOSE BIB PLUMBING AND FIXTURE
 INSTALLATIONS.
 PAVILION AND EQUIPMENT ENCLOSURE CONSTRUCTION.
 POOL FENCE
 PAVER DECK
  
 2) PLEASE NOTE THAT THE PERMIT APPLICANT IS RESPONSIBLE
 FOR OBTAINING AN OPERATIONAL PERMIT ISSUED BY THE PALM
 BEACH COUNTY DEPARTMENT OF HEALTH- SECTION 454.1.1 FBC
 B.
  
 3) SHEET 1 DESIGN CRITERIA: REFER TO 454.1.1 AND
 1612.4.2 FBC B.-THE POOL IS BEING CONSTRUCTED IN AN AE
 FLOOD ZONE. PLEASE ADD THE ASCE 24-2014 TO THE LIST OF
 CODES AND STANDARDS AND PROVIDE DETAILS AND NOTES ON
 THE PLAN INDICATING COMPLIANCE WITH SECTION 7.3
 PLUMBING SYSTEMS, 7.4 MECHANICAL, HEATING, HVAC
 SYSTEMS.
  
 SECTION 7.3.1: THE POOL PLUMBING PIPES SHALL BE BURIED
 TO A DEPTH SUFFICIENT TO PREVENT MOVEMENT, SEPARATION,
 OR LOSS DUE TO FLOODING AND EROSION UNDER DESIGN FLOOD
 CONDITIONS.
  
 SECTION 7.3.2: THE POOL PIPING EMERGING FROM
 UNDERGROUND SHALL BE DESIGNED, CONSTRUCTED, ANCHORED,
 AND PROTECTED TO WITHSTAND FLOOD-RELATED LOADS,
 INCLUDING THE EFFECTS OF BUOYANCY, HYDRODYNAMIC FORCES,
 AND DEBRIS IMPACT.
  
 SECTION 7.3.3: THE POOL PLUMBING SYSTEM AND COMPONENTS
 (POOL EQUIPMENT) SHALL BE ELEVATED AT A MINIMUM OF 1
 FT. ABOVE THE BFE + 1 FT. OR THE DFE WHICHEVER IS
 HIGHER PER TABLE 7-1. OPENINGS BELOW THE REQUIRED
 ELEVATION SHALL BE PROTECTED WITH AUTOMATIC BACKWATER
 VALVES OR OTHER AUTOMATIC BACKFLOW DEVICES.
  
 REFER TO SECTION 309.1 FBC P FOR ADDITIONAL
 REQUIREMENTS FOR PLUMBING PIPING AND EQUIPMENT
 INCLUDING THE SANITARY AND STORM DRAIN PIPING, POOL
 HEATER, PUMP, AND OTHER POOL EQUIPMENT. SUCH SYSTEMS
 ARE REQUIRED TO BE DESIGNED AND INSTALLED TO PREVENT
 WATER FROM ENTERING OR ACCUMULATING WITHIN THEIR
 COMPONENTS AND THE SYSTEMS ARE CONSTRUCTED TO RESIST
 HYDROSTATIC AND HYDRODYNAMIC LOADS AND STRESSES,
 INCLUDING THE EFFECTS OF BUOYANCY, DURING THE
 OCCURRENCE OF FLOODING UP TO SUCH AN ELEVATION.
  
 4) SHEET 2: INDICATE WHICH CODE STANDARD AND FORMULA
 WAS USED TO DETERMINE THE CALCULATED GPM FLOW OF 75 GPM
 PER LIVING UNIT- SECTION 107.2.1. PLEASE NOTE SECTION
 454.1.1 FBC B SPECIFIES ONE BATHER PER SEVEN LIVING
 UNITS FOR A NONTRANSIENT FACILITY, AND BATHING LOAD
 COMPUTED EITHER ON THE BASIS OF ONE PERSON PER 5 GPM OF
 RECIRCULATION FLOW, OR ONE PERSON PER EACH 20 SQ. FT.
  
 5) SHEET 1: THE DISCHARGE WATER FROM THE POOL SHALL NOT
 DRAIN INTO THE CITY SANITARY SYSTEM- SECTION
 454.1.6.5.15 & SEC. 90-126(5) WPB CODE OF ORDINANCES.
 PLEASE REVISE THE PLANS TO SHOW AN APPROVED PLACE OF
 DISPOSAL. THE DISCHARGE WATER IS ALSO SHOWN TO BE
 DRAINING INTO THE STORM DRAIN SYSTEM IN THE WASTE
 DETAIL ON SHEET 6. PLEASE NOTE THAT THE CITY OF WPB
 UTILITIES DEPT.
  
 PROHIBITS POOL WASTE WATER FROM DRAINING INTO THE STORM
 DRAIN SYSTEM UNLESS THE WATER HAS BEEN DECHLORINATED.
 THE ENGINEER OF RECORD SHALL PROVIDE A PROCEDURE AND
 EQUIPMENT SPECIFICATIONS.
  
 6) SHEET 1: PLEASE ADD A NOTE TO INDICATE THE POOL
 EQUIPMENT ENCLOSURE GATE WILL BE SELF- CLOSING AND
 SELF-LATCHING- 454.1.5.1.
  
 7) SHEET 1: THE WOMEN'S RESTROOM SHALL HAVE A RATIO OF
 THREE TO TWO WATER CLOSETS FOR WOMEN AS THE COMBINED
 TOTAL OF WATER CLOSETS AND URINALS PROVIDED FOR ME-
 454.1.6.1.1 FBC B.
  
 8) SHEET 1: SHOW THE REQUIRED FLOOR DRAINS IN THE
 RESTROOMS AND FLOOR SLOPE TO DRAINS- 454.1.6.1.3 FBC B.
  
 9) SHEET 1: A HOSE BIB WITH A VACUUM BREAKER SHALL BE
 PROVIDED WITHIN 25 FT. OF THE EACH RESTROOM FOR EASE OF
 CLEANING- 454.1.6.4. INDICATE VACUUM BREAKERS WILL BE
 INSTALLED AT ALL OTHER HOSE BIBS SHOWN ON THE PLAN -
 454.1.6.3.
  
 10) SHEET 2: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE VAKPAK AP30 FILTRATION SYSTEM, PUMP, COLLECTOR
 TANK, SEPARATOR TANK, AND DISINFECTION EQUIPMENT
 INCLUDING CHLORINE FEEDERS AND CONTAINERS. THE SPECS
 SHALL INDICATE THE EQUIPMENT CONFORMS WITH REQUIRED
 STANDARDS NSF/ANSI STANDARD 50, CIRCULATION SYSTEM
 COMPONENTS AND RELATED MATERIALS FOR SWIMMING POOL,
 SPAS/HOT TUBS, DATED APRIL 2007- SECTIONS 454.1.6.5.1 &
 454.1.6.5.5.3 FBC B. THE SPECS SHALL INDICATE TYPE OF
 FILTERING MATERIAL TO BE PROVIDED. PLEASE NOTE THAT A
 PRECOAT OR COLLECTOR TANK SHALL BE PROVIDED FOR D-E
 TYPE SYSTEMS- 454.1.6.5.5.1.
  
 11) SHEET 2: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE POOL HEATER, AND PROVIDE A PIPING DIAGRAM SHOWING
 THE LOCATION OF THE FIXED THERMOMETER, VALVES, PIPE
 SIZES AND MATERIAL SPECIFICATIONS- SECTION 454.1.6.5.14
 FBC B.
  
 12) SHEET 2: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE MAIN DRAIN AND COVER SHOWING CONFORMANCE WITH THE
 ANSI/APSP 16 STANDARD- 454.1.6.5.10.2 FBC P. PROVIDE AN
 ENLARGED MAIN DRAIN DETAIL IN COMPLIANCE WITH SECTION
 454.1.6.5.10.2 FBC B.
  
 13) SHEET 2: PROVIDE TOTAL DYNAMIC HEAD CALCULATIONS
 AND THE PUMP CURVE FROM THE MANUFACTURER- SECTION
 454.1.6.5.4 FBC B.
  
 14) SHEETS 2, 3, & 5: PLEASE PROVIDE AN ENLARGED
 EQUIPMENT ROOM DRAWING THAT IDENTIFIES ALL EQUIPMENT IN
 THE ROOM/AREA THE CORRELATING NUMBERED EQUIPMENT
 SCHEDULE- SECTION 454.1.5 FBC B. INCLUDE A PLUMBING
 PIPING SCHEMATIC FOR THE EQUIPMENT IN THE ROOM.
  
 15) SHEETS 1 & 4: PLEASE SHOW THE ENTIRE POOL PIPING
 RUNS FROM THE POOL TO THE EQUIPMENT AREA AND VAKPAK-
 THE PLAN IS CUT OFF AT THE PAVILION- SECTION 454.1.6.5
 FBC B AND SECTION 107.2.1 WPB. PLEASE INCLUDE THE WATER
 SUPPLY RUN FROM THE POINT OF CONNECTION FROM THE MAIN
 TO THE TO THE VAKPAK WITH THE LOCATIONS OF TYPES OF
 VALVES AND BACKFLOW PREVENTER IDENTIFIED: AND THE
 DISCHARGE PIPING FROM THE VAKPAK TO THE DISPOSAL
 LOCATION- SECTION 107.2.1 WPB. PLEASE REFER TO COMMENT
 #5 ABOVE CONCERNING WASTE-WATER DISCHARGE.
  
 16) SHEETS 4 & 6: PLEASE PROVIDE THE DIMENSIONS OF THE
 GUTTERS IN COMPLIANCE WITH SECTION 454.1.6.5.3.1.1 FBC
 B.
  
 17) SHEETS 2 & 4: CLARIFY FLOW RATE INDICATORS WILL BE
 INSTALLED ON THE RETURN PIPING AND INCLUDE THEM IN THE
 SUBMIT MANUFACTURER'S SPECIFICATIONS- SECTION
 454.1.6.5.13 FBC B.
  
 18) SHEETS 1, 2 & 6: CLARIFY IF A TIME CLOCK WILL BE
 INSTALLED FOR THE RECIRCULATION SYSTEM AND INCLUDE IT
 IN THE SCHEDULE, AND PROVIDE INSTALLATION DETAILS-
 SECTION 454.1.6.5.2 FBC B.
  
 19) PROVIDE A WATER SUPPLY PIPING LAYOUT AND RISER
 DRAWING FOR INSTALLATION OF THE HOSE BIB AND POOL
 SHOWER- SECTION 602.2 FBC P AND 107.3.5.1.3 WPB. PLEASE
 PROVIDE EQUIPMENT SCHEDULES FOR THE FIXTURES ON THE
 PLAN- SECTIONS 412.3 & 608.16.4.2 FBC P. A) INDICATE
 HOW WATER FROM THE SHOWER WILL BE DRAINED TO AN
 APPROVED PLACE OF DISPOSAL- SECS. 90-126 & 203 WPB CODE
 OF ORDINANCES.
  
 20) PLEASE SHOW COMPLIANCE WITH THE FOLLOWING CODE
 SECTIONS FROM THE FBC EC:
  
 C404.9.1 HEATERS. THE ELECTRIC POWER TO ALL HEATERS
 SHALL BE CONTROLLED BY A READILY ACCESSIBLE ON-OFF
 SWITCH THAT IS AN INTEGRAL PART OF THE HEATER, MOUNTED
 ON THE EXTERIOR OF THE HEATER, OR EXTERNAL TO AND
 WITHIN 3 FEET (914 MM) OF THE HEATER. OPERATION OF SUCH
 SWITCH SHALL NOT CHANGE THE SETTING OF THE HEATER
 THERMOSTAT. SUCH SWITCHES SHALL BE IN ADDITION TO A
 CIRCUIT BREAKER FOR THE POWER TO THE HEATER. GAS-FIRED
 HEATERS SHALL NOT BE EQUIPPED WITH CONTINUOUSLY BURNING
 IGNITION PILOTS.
  
 C404.9.2 TIME SWITCHES. TIME SWITCHES OR OTHER CONTROL
 METHODS THAT CAN AUTOMATICALLY TURN OFF AND ON HEATERS
 AND PUMP MOTORS ACCORDING TO A PRESET SCHEDULE SHALL BE
 INSTALLED FOR HEATERS AND PUMP MOTORS. HEATERS AND PUMP
 MOTORS THAT HAVE BUILT-IN TIME SWITCHES SHALL BE IN
 COMPLIANCE WITH THIS SECTION.
 EXCEPTIONS:
 1. WHERE PUBLIC HEALTH STANDARDS REQUIRE 24-HOUR PUMP
 OPERATION.
 2. PUMPS THAT OPERATE SOLAR- AND WASTE-HEAT-RECOVERY
 POOL HEATING SYSTEMS.
  
 C404.9.3 COVERS. OUTDOOR HEATED SWIMMING POOLS AND
 OUTDOOR PERMANENT SPAS SHALL BE EQUIPPED WITH A
 VAPOR-RETARDANT COVER ON OR AT THE WATER SURFACE OR A
 LIQUID COVER OR OTHER MEANS PROVEN TO REDUCE HEAT LOSS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved