Date |
Text |
2022-06-30 11:28:26 | PASSED ELECTRIC REVIEW WITH THE PROVISO TO ENSURE |
| COMPLIANCE WITH THE BELOW COMMENTS.MP |
| |
| ELECTRICAL REVIEW FAILED |
| |
| 1) PLEASE PROVIDE LOAD CALCULATIONS FOR DOCK PANEL THAT |
| CORRECTLY STATE THE LOADS BEING SERVED. I.E. SHORE |
| POWER IS LISTED AS 30 AMP, DRAWING DETAILS 50-AMP. NO |
| BOAT LIFTS ARE DETAILED. NEC 215.5 PANEL SCHEDULE HAS |
| BEEN REVISED TO SHOW A 50-AMP SHORE POWER PEDESTAL, |
| HOWEVER BOATLIFT CIRCUITS ARE STILL NOT LISTED IN THE |
| SCHEDULE AND LOAD CALCULATIONS UPDATED. |
| NEC 215.5 DIAGRAMS OF FEEDERS. IF REQUIRED BY THE |
| AUTHORITY HAVING |
| JURISDICTION, A DIAGRAM SHOWING FEEDER DETAILS SHALL BE |
| PROVIDED |
| PRIOR TO THE INSTALLATION OF THE FEEDERS. SUCH A |
| DIAGRAM SHALL |
| SHOW THE AREA IN SQUARE FEET OF THE BUILDING OR OTHER |
| STRUCTURE |
| SUPPLIED BY EACH FEEDER, THE TOTAL CALCULATED LOAD |
| BEFORE APPLYING |
| DEMAND FACTORS, THE DEMAND FACTORS USED, THE CALCULATED |
| ------------------------------------------------------- |
| ------------------------------------------------- |
| 2) PLEASE DETAIL GROUND FAULT PROTECTION AS REQUIRED BY |
| NEC 555.3 AND 210.8(C) THERE IS STILL NO INDICATION ON |
| ANY PLANS OR SCHEDULES DETAILING THE REQUIRED GFP AS |
| REQUIRED |
| NEC 210.8(C) BOAT HOISTS. GFCI PROTECTION SHALL BE |
| PROVIDED FOR OUTLETS |
| NOT EXCEEDING 240 VOLTS THAT SUPPLY BOAT HOISTS |
| INSTALLED IN DWELLING |
| UNIT LOCATIONS. |
| NEC 555.3 GROUND-FAULT PROTECTION. THE OVERCURRENT |
| PROTECTIVE |
| DEVICES THAT SUPPLY THE MARINA, BOATYARDS, AND |
| COMMERCIAL AND |
| NONCOMMERCIAL DOCKING FACILITIES SHALL HAVE |
| GROUND-FAULT PROTECTION |
| NOT EXCEEDING 30 MA. |
| ------------------------------------------------------- |
| -------------------------------------------------- |
| 3) PLEASE DETAIL ELECTRIC CONNECTIONS ARE 12? ABOVE |
| ELECTRICAL DATUM PLANE AS DETAILED BY NEC 555.2 AND |
| 555.9. ALTHOUGH PLAN LABELED BOAT LIFT SECTION DOES NOT |
| DETAIL THESE MEASUREMENTS, ONE MIGHT ASSUME THE |
| ELECTRICAL CONNECTIONS SHOULD BE IN COMPLIANCE |
| 555.2 DEFINITIONS. |
| ELECTRICAL DATUM PLANE. THE ELECTRICAL DATUM PLANE IS |
| DEFINED |
| AS FOLLOWS: |
| (1) IN LAND AREAS SUBJECT TO TIDAL FLUCTUATION, THE |
| ELECTRICAL |
| DATUM PLANE IS A HORIZONTAL PLANE 606 MM (2 FT) ABOVE |
| THE HIGHEST TIDE LEVEL FOR THE AREA OCCURRING UNDER |
| NORMAL |
| CIRCUMSTANCES, THAT IS, HIGHEST HIGH TIDE. |
| 555.9 ELECTRICAL CONNECTIONS. ELECTRICAL CONNECTIONS |
| SHALL BE |
| LOCATED AT LEAST 305 MM (12 IN.) ABOVE THE DECK OF A |
| FLOATING PIER. |
| CONDUCTOR SPLICES, WITHIN APPROVED JUNCTION BOXES, |
| UTILIZING |
| SEALED WIRE CONNECTOR SYSTEMS LISTED AND IDENTIFIED FOR |
| SUBMERSION |
| SHALL BE PERMITTED WHERE LOCATED ABOVE THE WATERLINE |
| BUT |
| BELOW THE ELECTRICAL DATUM PLANE FOR FLOATING PIERS. |
| ALL ELECTRICAL CONNECTIONS SHALL BE LOCATED AT LEAST |
| 305 MM |
| (12 IN.) ABOVE THE DECK OF A FIXED PIER BUT NOT BELOW |
| THE ELECTRICAL |
| DATUM PLANE. |
| ------------------------------------------------------- |
| ----------------------------------------------- |
| 4) PLEASE DETAIL SHOCK HAZARD SIGNAGE AS REQUIRED BY |
| NEC 555.24. SHOCK HAZARD SIGN HAS BEEN PROVIDED IN THE |
| SUPPORTING DOCS FOLDER |
| ------------------------------------------------------- |
| ------------------------------------------------------- |
| ----------------------- |
| 5) PLEASE PROVIDE CONDUCTOR SIZES AND OVERCURRENT |
| PROTECTION INSTALLED TO DOCK EQUIPMENT TO DETAIL |
| COMPLIANCE WITH NEC 210.19(1) AND NEC 240.4. NO |
| CONDUCTOR SIZES OR OVERCURRENT PROTECTION IS SHOWN ON |
| ANY PLAN OR SCHEDULE FOR BOAT LIFTS |
| 210.19 CONDUCTORS ? MINIMUM AMPACITY AND SIZE. |
| (A) BRANCH CIRCUITS NOT MORE THAN 600 VOLTS. |
| (1) GENERAL. BRANCH-CIRCUIT CONDUCTORS SHALL HAVE AN |
| AMPACITY |
| NOT LESS THAN THE MAXIMUM LOAD TO BE SERVED. CONDUCTORS |
| SHALL BE |
| SIZED TO CARRY NOT LESS THAN THE LARGER OF |
| 210.19(A)(1)(A) OR (B). |
| ------------------------------------------------------- |
| --------------------------------------------------- |
| 6) PLEASE DETAIL CONDUCTORS/FEEDERS ARE SIZED FOR |
| MAXIMUM VOLTAGE DROP AS REQUIRED PER 2020 FBC ENERGY |
| CONSERVATION C405.5.3. NO SUPPORTING DOCUMENTATION HAS |
| BEEN PROVIDED TO SHOW COMPLIANCE |
| C405.5 ELECTRICAL POWER (MANDATORY). |
| C405.5.3 VOLTAGE DROP. THE CONDUCTORS FOR FEEDERS AND |
| BRANCH CIRCUITS COMBINED SHALL BE SIZED FOR A MAXIMUM |
| OF |
| 5 PERCENT VOLTAGE DROP TOTAL. |
| |
| PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RESUBMITTAL FORM. |
| |
| CODES IN EFFECT: |
| FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA |
| BUILDING CODE 2020 7TH ED. |
| FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 |
| 7TH EDITION |
| FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| 7TH EDITION |
| FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION |
| NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE |
| |
| |