2021-11-10 15:05:09 | PLAN |
| REVIEW COMMENTS |
| |
| 3RD REVIEW: FBC SEVENTH EDITION (2020) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| NOTE: IT IS ACKNOWLEDGED BY THE CITY BUILDING DIVISION |
| THAT THESE ROLL-UP STORM SHUTTERS PROPOSED FOR THE ROOF |
| TOP GAZEBO ARE NOT REQUIRED TO BE INSTALLED BY THE |
| FLORIDA BUILDING CODE. |
| |
| 1) PROVIDE A LETTER FROM A FLORIDA LICENSED ENGINEER |
| AFFIRMING THAT THE INSTALLATION OF THESE ROLL-UP STORM |
| SHUTTERS WILL NOT HAVE AN ADVERSE EFFECT ON THE HOST |
| STRUCTURE WHEN IN USE DURING A WIND EVENT. FBC |
| 107.2.1.2 |
| |
| 2) PLEASE HAVE THE ENGINEER EXPLAIN THE SUBSTANTIAL |
| PRESSURE DIFFERENCE BETWEEN THE DESIGN PRESSURES FOR |
| OPENING #1 AND THE OTHER OPENINGS. ESPECIALLY OPENING |
| #5 WHICH IS IN THE SAME WALL ZONE AND IS 134.5 SQFT |
| COMPARED TO 202.5 SQFT. FBC 107.2.1.2 |
| |
| 3) THE CUSTOM MOUNT DETAIL FOR OPENING #1 SHOWS ADDING |
| AN ALUMINUM ANGLE TO THE END RETENTION TRACK. I BELIEVE |
| THAT YOU INTEND THIS TO INCREASE THE DESIGN PRESSURE OF |
| THE ROLL-UP SHUTTERS. THE ENGINEER WILL NEED TO PROVIDE |
| A RATIONAL ANALYSIS THAT EXPLAINS HOW THIS WILL |
| INCREASE THE DESIGN PRESSURES OF THE PRODUCT. THE |
| ENGINEER WILL NEED TO PROVIDE A COPY OF THE TEST REPORT |
| FOR THE ROLL-UP SHUTTERS THAT INDICATES THE MODE OF |
| FAILURE. THE REPORT NEEDS TO SHOW WHICH COMPONENT OF |
| THE ROLL-UP FAILED. IF IT IS THE SLATS THAT FAILED WHEN |
| TESTED, REINFORCING THE RETENTION TRACK WILL NOT |
| INCREASE THE PRODUCT'S DESIGN PRESSURE. FBC 107.2.1 |
| |
| 4) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |