2022-04-06 13:56:09 | NFIP PLAN REVIEW |
| |
| CHRISTOPHER S. THROOP, C.B.O., CFM |
| PLANS EXAMINER II PX3169/SFP306 |
| INSPECTOR BN4338 |
| BUILDING OFFICIAL BU1635 |
| ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| DEVELOPMENT SERVICES DEPARTMENT |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| CITY ORDINANCE NO. 4658-16 AND NO. 4729-17 |
| |
| 2ND REVIEW |
| |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| RE: CONSTRUCTION DRAWING ELEVATION CERTIFICATE (EC) |
| COMMENTS PER FB107. |
| |
| 1. SECTION AA) GARAGE SQUARE FOOTAGE STATES 575SF. PLAN |
| PAGE A100. STATES GARAGE IS 667SF. |
| 2. SECTION A9B) NUMBER OF FLOOD OPENINGS STATES N/A. |
| PLAN PAGE AOOO SHOWS 2 FLOOD OPENINGS. |
| 3. A9C) TOTAL NET AREA STATES N/A. THIS DATA WILL BE |
| FROM THE TYPE OF FLOOD VENTS INSTALLED. ENGINEERED OR |
| NON-ENGINEERED. |
| 4. SECTION A9D) ENGINEERED FLOOD OPENINGS STATES NO. IF |
| NON-ENGINEERED FLOOD OPENINGS ARE INSTALLED, PROVIDE A |
| DETAIL BY A QUALIFIED DESIGN PROFESSIONAL, SIGNED AND |
| SEALED. |
| 5. SECTION C2D) TOP OF GARAGE FLOOR STATES 7.7FT. PLAN |
| PAGE A100 STATES 6.6FT. |
| 6. C2E) LOWEST ELEVATION OF MACHINERY STATES N/A. |
| MACHINERY SERVICING THE BUILDING SHALL BE AT OR ABOVE |
| THE DFE OF 8.0FT NAVD. |
| 7. C2F) LOWEST ADJACENT GRADE. REQUIRED DATA NOT |
| AVAILABLE. SITE DRAINAGE PLAN HAS NOT BEEN SUBMITTED |
| FOR REVIEW. |
| 8. C2G) HIGHEST ADJACENT GRADE. REQUIRED DATA NOT |
| AVAILABLE. SITE DRAINAGE PLAN HAS NOT BEEN SUBMITTED |
| FOR REVIEW. |
| 9. SECTION D COMMENTS: TYPE OF EQUIPMENT AND LOCATION |
| REQUIRED. (SEE DIRECTIONS IN COMMENTS NARRATIVE BLOCK) |
| 10. ELEVATION CERTIFICATE IS MISSING PAGES 5 AND 6. |
| (PHOTOS). FEMA REQUIRES A COMPLETE EC. NOTE: NO PHOTOS |
| ARE REQUIRED FOR THE CONSTRUCTION DRAWING EC. |
| |
| PROVISO: PLAN PAGE S1 - UNDER CONSTRUCTION EC REQUIRED |
| AT PLACEMENT OF 1ST FLOOR. |
| |
| C/O HOLD: FINISHED CONSTRUCTION EC REQUIRED PRIOR TO |
| C/O. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| |
| |